Haulage and load tickets give every tipper load its own line. Material, source, tip, tare, net weight and ticket number are entered for each load. Loads are totalled by job, stockpile and supplier. Foremen enter them on site, and the office checks them against the tip’s bill.

What a load ticket line records

One truck load is one line. Each line is short, because a busy tipper makes trip after trip. Together the lines show how much spoil left a site, how much fill came in, which tip took it and which supplier delivered it.

Material and direction

Spoil out or fill in is marked first. The material is then named at once, such as clay, topsoil, rock or granular fill. Direction decides whether the load costs a tip charge or a supplier purchase.

Source and tip named

Every load has both ends. The source is the job, a stockpile or a supplier’s pit. The destination is the tip, a stockpile or the job. Tip and supplier names are held once, so each total adds up under one name.

Tare, net weight and ticket number

Tare and net weight are copied from the weighbridge ticket, together with its number. Net weight is the figure to compare with the tip’s bill when it arrives. The ticket number finds the paper again.

Truck, driver and time

The tipper and its driver are named on each line, with the time of the load. Totals by truck show how each unit worked and which tips it served. A load with no driver is queried.

Loads from the cut to the tip

Tickets are entered as the work happens, not carried in a cab until the end of the month. Entry is at the gate. The foreman or banksman keys each load, and the office reads the day’s haulage as soon as it is saved.

At the weighbridge

The driver passes the weighbridge, takes the ticket and hands the number to the banksman. The line is entered while the tipper is still near, with the material and tip named. Nothing waits in the cab for a month.

Stockpiling topsoil on site

Topsoil stripped in the first stage goes to a stockpile on the same site. Each load in is a line, entered at the gate. The balance rises. When topsoil is spread again, loads out bring the balance down.

Importing granular fill

A supplier’s trucks bring granular fill for the base of a trench. Each delivery has its own ticket. Lines are totalled by supplier, so the supplier’s invoice can be checked against what arrived at the gate.

A query from the tip

A tip bills for more loads than the site counted. The office opens the job’s loads for that tip and compares them with the invoice, ticket by ticket. The difference becomes a list, not a guess.

Who enters and who reads load tickets

Load lines are entered by the people at the gate and read by people far from it. Four roles use them. Each asks a different question of the same list of tickets.

Foremen and banksmen enter loads

Foremen and banksmen key each ticket on a phone as the tipper leaves, with material, tip and weights. They see the day’s running total for the job at the gate. A gap shows before the shift ends.

Yard staff read truck totals

The yard reads loads by tipper, which shows which trucks worked hard and which waited at the tip. Those totals sit beside fuel and hours for the same truck. Few loads and high fuel invite a look.

Accounts check tips and suppliers

Accounts total loads by tip and by supplier, then match them to the invoices that arrive. A bill that exceeds the tickets is held back and queried. A bill that matches is passed for payment.

Owners read haulage against plan

Owners read loads hauled by job, material, tare and tip, and set them against the quantity priced in the estimate. A job hauling more than it measured has hit rock or swell. They hear that early.

Haulage choices before the first ticket

Four decisions shape the load totals. Settle them with the foremen, the yard and accounts before the first ticket is keyed. Changing a tip name or material list later splits the totals.

Who may change a ticket line

Decide who edits a load line after entry, and whether a change is allowed once the tip’s invoice is paid. A line altered after payment makes the invoice check useless. Note the original figure beside it.

Which loads are left out

Decide whether small loads in a pickup or a hired grab lorry are logged, or only tipper loads. Tickets that are never entered leave holes. Log the loads that carry a charge or a purchase price.

How stockpile balances come across

Opening stockpile balances come across from the sheets in use now, as the first line for each stockpile, with material and place. The office spot-checks a few against the site. New loads are added after that.

Which report to read first for Haulage and load tickets

Start with loads hauled by job, material, tare and tip. The report shows whether tickets are being entered. It also shows whether the totals look sane for the quantity priced. Cost reports depend on it.

How load tickets connect to the product

Haulage is where physical movement becomes a record. Loads come from the cut, ride in a tipper on a driver’s hours, burn fuel and end up on a tip’s invoice. Each of those facts lives in a different feature, and tickets connect them. The links follow.

  • Matches load counts in daily site logs with ticket lines
  • Takes tipper and driver bookings from machine and operator allocation
  • Shares tipper trips with fuel issue and consumption for comparison
  • Gives hired dumper loads to hired plant and subcontractors checks
  • Supplies spoil removed behind measured quantities in progress claims

Where load ticket records stop

Tickets record what the foreman keys from the weighbridge slip. Keying is manual. The system does not read a weighbridge, check a weight or inspect a load. Whether a load of spoil is clean, contaminated or regulated is a matter for the owner and an environmental adviser. Tip fees come from the tip’s own price list. A single tipper on a handful of loads can use a notebook.

FAQ

Frequently asked questions

Can loads be totalled by stockpile as well as by job?

Each load names a source and a destination, so a stockpile is just another place. Totals by job, stockpile, supplier, truck and tip all come from the same lines. Balances rise and fall as loads move.

How do we check a tip’s invoice against our loads?

Open the job’s loads for that tip and set the ticket numbers beside the invoice lines. Any ticket missing from either side of the match is easy to see. Query it with numbers, not memory.

Does it read the weighbridge ticket itself?

The ticket number and weights are keyed in. A photograph of the paper ticket can be attached to the day’s site log. The software does not read the weighbridge directly. The paper slip is still kept for the tip’s invoice check.

Can imported fill and exported spoil be told apart?

Every line carries a direction. Spoil out and fill in are totalled separately, so a tip charge and a supplier purchase never blend. Reports by material show each stream on its own, with its own tonnage.

What if a driver loses the paper ticket?

The line is still entered from the driver’s note, with the load details, the date and the truck, and marked as having no ticket. Later, the office asks the tip for its record. Until then the mark warns readers.

Where it fits

How this feature fits the system.

Excavation Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and estimates

Bids are built from measured cut and fill and stored machine, tipper and tip rates, and each revision stays with the enquiry.

Estimate/Quotation Management

Machine and operator allocation

The planner sees which excavators, tippers and operators are free before a new job is promised a start date.

Resource Allocation

Operator timesheets

Operators, drivers, banksmen and labourers are marked present against a job, and wages and overtime follow from those entries.

Attendance & Time Tracking
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements