Machine and operator allocation for excavation
Machine and operator allocation puts each excavator, tipper and operator against a site and a stage. The planner sees what is free before a new job is promised a start date. The yard sees which machine is where, and owners read how busy each excavator has been. Clashes show before the trucks roll.
What the excavator allocation plan holds
The plan lists who and what goes where, and when. Each line ties one machine or one person to one job and stage for a set of dates. Gaps between lines are the free time. Free time is what a new job gets promised.
Planning the fleet through a busy week
A fleet looks idle on paper and full on the ground, and the reverse. The planner builds the week from the jobs due to start, the machines in the yard and the operators on the books. Changes arrive daily. Each is made once.
Who reads the allocation plan and why
Four roles open the plan for four reasons. Only the planner edits it. The rest read it to make a promise, to prepare a site or to fit servicing into free time.
Allocation rules to settle first
Four decisions keep the plan honest. Take them with the planner, the yard and the owner before the first booking is made. Settled early, they save arguments in the busiest weeks.
Where allocation meets the rest of the product
Allocation is where the programme meets the fleet. The jobs ask for machines, the servicing record says which are fit to go, and the site log reports what was actually worked. The plan stays honest only if all three feed it. Each link is listed below.
- Takes stages, dates and machines needed from jobs and programme
- Reads service due dates from machine servicing and breakdowns
- Gives operator names to operator timesheets for each job
- Receives hired scrapers and dumpers from hired plant and subcontractors
- Compares actual hours in daily site logs with bookings
Where machine allocation stops
Allocation plans and shows. It does not move a machine, arrange a transporter or tell an operator where to be, so the planner still makes the calls. It does not check licences, medical fitness or site induction, which stay with the owner and the safety adviser. Wages come from timesheets, not from the plan. A firm with one excavator and one operator can keep this in a diary.
Frequently asked questions
How do we see what is free before promising a start?
Open the plan for the dates asked for. Excavators, tippers and operators not booked against any job show as free. Machines due for service in that period show as taken. The answer comes before the promise, not after it.
Can an operator and a machine be booked together?
Each booking names a unit and a person for a stage and dates. Moving the excavator to another site can move the operator with it, or the planner can name someone else. Both choices are made on one line.
Does it handle hired machines alongside our own?
Hired scrapers and dumpers are placed against a stage just as own units are. They show beside the fleet on the plan. Rates and hours are held under hired plant. Allocation only shows where they are working.
What happens to bookings when a job slips?
Stage dates are edited on the job, then each booking is moved to match. Free time shows. So does any new clash. Yard and foremen read the new dates when they next open the plan.
Can we see how busy each excavator really is?
Machine hours and utilisation by excavator and tipper is a report. It sets hours worked, taken from site logs, against days booked. An excavator booked but rarely logged is easy to spot. So is one that never rests.
How this feature fits the system.
Excavation Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Enquiries and estimates
Bids are built from measured cut and fill and stored machine, tipper and tip rates, and each revision stays with the enquiry.
Estimate/Quotation ManagementMachine and operator allocation
The planner sees which excavators, tippers and operators are free before a new job is promised a start date.
Resource AllocationOperator timesheets
Operators, drivers, banksmen and labourers are marked present against a job, and wages and overtime follow from those entries.
Attendance & Time TrackingTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements