Fuel issue and consumption for excavation fleets

Fuel issue and consumption records every draw from the yard tank or the bowser against the excavator or tipper that took it. Litres are set beside the hours that machine worked, so idling and waste stand out. The yard enters fuel, the foreman’s log supplies hours, and the owner reads the comparison.

What a fuel issue entry records

Each draw of fuel is one entry. It says what was drawn, by which machine and from where. Entries are short enough to complete at the pump. The comparison with hours does the thinking later, once a few weeks of draws are on file.

Machine and litres drawn

Each entry names the excavator or tipper and the litres drawn. An hour-meter reading can be added when the operator knows it. Each unit builds its own history. One machine’s habits are then easy to read.

Tank or bowser as the source

The entry says where the fuel came from, whether the yard tank, a site bowser or a delivery to the job. Draws from different sources can be read apart. A bowser’s draws stay apart from the tank’s.

Date, job and person

The date, the job the machine was on and the person who drew the fuel are noted. Fuel cost can then be set against the job, not just the fleet. Names settle who was at the pump.

Hours worked for comparison

Hours come from the daily site log, not from the fuel entry. Litres per hour is worked out for each machine. That is the figure an owner studies. A fuel entry on its own says little.

Fuel through a week of digging

Fuel is drawn at the start of a shift and again on long days. Entering is done by the yard hand and the banksman. A week of entries is enough to show which machines run thirsty. Others stand idling between loads.

Filling at the yard tank

Before the shift an excavator operator fills at the yard tank. The yard hand enters the machine, the litres and the job it is heading to. The pump and the record are done together. No draw is left to memory.

Topping up on a remote site

A bowser is towed to the trench run. The banksman enters each fill on a phone, naming the machine and the litres drawn. The foreman’s hours later show whether the draw was reasonable for the work done.

Spotting an excavator that idles

One excavator draws more fuel per working hour than a sister machine on the same job. The owner asks about idling while it waits for tippers at the cut. The cause may be the haul.

Setting fuel against the job

At the end of the week the office sets the fuel each machine drew against the job it worked on. Fuel becomes a line in job cost beside labour and hired plant. It stops hiding in overheads.

Who enters and who reads fuel figures

The people at the pump enter fuel. The people in the office read what it shows. Four roles touch the figures, and none needs more than a few minutes a day.

Yard and workshop enter draws

The yard enters each draw from the tank or bowser, with machine and litres. It also sees the unit’s past entries. A sudden jump for one excavator is raised with the workshop, which checks hoses and leaks.

Foremen supply the hours

Foremen do not enter fuel, but their daily hours decide the comparison. A foreman who skips the log leaves the machine with litres and no hours. That line looks wasteful when read alone. It is not.

Owners study litres per hour

Owners read fuel issued against hours worked for every excavator and tipper, set beside the job type. They look for outliers first. A machine well above its peers is asked about before the next fill.

Accounts price the fuel

Accounts hold the supplier’s invoice for fuel delivered and set it beside what was issued. They allocate fuel cost to jobs. Gaps between delivered and issued are queried with the yard. Tax treatment of fuel is the accountant’s call.

Fuel recording rules to agree first

Four decisions keep the fuel record usable. Agree them with the yard, the senior foreman and the owner before the first entry. A rule everyone follows beats a perfect rule nobody remembers.

Who may change an entry for Fuel issue and consumption

Decide who edits a fuel entry after it is saved and whether the yard lead approves the change. A wrong litre figure fixed without a note falsifies the comparison. Keep the original beside the edit.

What fuel is left out

Decide whether fuel for pumps, generators, light vehicles and hired plant is logged. Hired plant is fuelled by the hirer in some contracts, and those litres belong on the hire cost, not here. Settle it in writing.

How existing records come across for Fuel issue and consumption

Past fuel sheets are rarely worth keying in. Load the fleet register, then start entries on the first day. If history exists, add it for the biggest machines only, so comparisons have a fair base.

Which report to read first for Fuel issue and consumption

Start with fuel issued against hours worked. It lists each machine with litres, hours and litres per hour. Sort by the highest and read down from the top of the list. Everything else in fuel follows from it.

How fuel links to hours, loads and cost

Fuel is a cost that means little alone. Divide it by hours and it becomes a measure. Set it beside loads and it becomes a cost per trip. The product holds each of those figures elsewhere, so fuel borrows them. Five links are listed below.

  • Takes hours worked by each machine from daily site logs
  • Reads the fleet register behind machine and operator allocation
  • Passes litres per hour to servicing and breakdowns reviews
  • Counts tipper trips from haulage and load tickets beside fuel
  • Adds fuel cost to job cost against estimate

Where fuel records stop

Fuel entries are keyed at the pump. The software does not meter the fuel, read a tank level or catch theft on its own, so a missing entry is still a missing entry. Fuel prices and tax on fuel come from the supplier and the accountant. A feed from a telematics unit is a separate connection, quoted on its own. One machine on a hire job needs no log.

FAQ

Frequently asked questions

How does it show a machine that is idling?

It compares litres drawn with hours worked for each machine over the same period. A unit with a high litres-per-hour figure against its peers on similar work is the one to ask about. Waiting is one cause.

Can fuel be charged back to individual jobs?

Each entry notes the job the machine was on, so fuel totals can be set against that job’s cost. Fuel then appears beside labour, hired plant and haulage in job cost. Overheads stop absorbing it.

Do tippers and excavators share one fuel log?

Both are logged in the same way. Tippers are read against hours and trips, excavators against hours alone. The comparison is fair only between similar machines of similar size.

Who enters fuel if the yard hand is away?

Anyone given access can enter a draw, whether the operator, the banksman or the foreman on site. The entry names who drew it. Yard review of the day’s entries happens when the yard hand is back.

Which report compares fuel with hours worked?

Fuel issued against hours worked lists each machine with litres, hours and litres per hour. Sort by the highest. The outliers come first. Read it beside job and machine type, so a tipper is not judged against an excavator.

Where it fits

How this feature fits the system.

Excavation Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and estimates

Bids are built from measured cut and fill and stored machine, tipper and tip rates, and each revision stays with the enquiry.

Estimate/Quotation Management

Machine and operator allocation

The planner sees which excavators, tippers and operators are free before a new job is promised a start date.

Resource Allocation

Operator timesheets

Operators, drivers, banksmen and labourers are marked present against a job, and wages and overtime follow from those entries.

Attendance & Time Tracking
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements