Jobs and programme for excavation sites
Jobs and programme gives every excavation site its own record. The job carries the accepted quantities, the stages from strip to backfill, the start dates and the excavators and crews it needs. The planner reads the programme, foremen open the day’s job on a phone, and owners see which sites are running.
What an excavation job record holds
Every site, whether a basement, a trench run or a stretch of subgrade, is opened as a job. It holds what was sold, what is planned and what has happened so far. Estimate figures sit at the front. Site entries gather behind them.
A job’s life from signed quote to close-out
A job is opened on the day a quote is accepted and stays open until final quantities are agreed. Between those two points the site, the yard and the office all write to it. The record collects what the site produces.
Who reads the job and what they see
Five roles read a job. The figures are the same for all, and what changes is the part each reader goes to first.
Setting up jobs for an excavation firm
Four choices shape every job record. Make them with the owner, the planner and the senior foreman before the first live job is loaded. Revisiting them later means editing running records.
How the programme ties into other features
The job is the thread that the rest of the product hangs on. Estimates open it, allocation fills it, the site log feeds it and claims close it. Whatever is entered elsewhere is entered against a job, so the job is the first place to look when a figure is questioned. The links are listed below.
- Takes quantities, stages and rates from enquiries and estimates
- Asks machine and operator allocation which excavators are free
- Receives hours, loads and instructions from daily site logs
- Reads attendance from operator timesheets for each site
- Passes agreed stages and quantities to progress claims and invoices
Where job records stop and others take over
The job record plans and collects. It does not move a machine by itself, so the planner still decides who goes where. It is not a critical-path scheduler for a main contractor’s whole building project, where Construction Project Management Software is closer. Contract terms, delay claims and extensions of time stay with the owner and a legal adviser. A single short hire needs only a diary entry.
Frequently asked questions
Can one job cover several stages and gangs?
A job holds every stage the work needs, such as strip, bulk dig, trim and backfill. Each stage can name its own machine and crew. A short job can have a single stage. The split is yours to choose.
What if the start date moves after the job opens?
Edit the date on the job or the stage. The machines and operators named stay with it. Yard and foreman read the new date the next time they open the record, so nobody works from the old plan.
How does a client with several sites appear?
Each site gets its own job. Under the same client, cost, loads and claims stay apart for a basement on one street and a trench on another. What the client still owes can be read across both.
Can we see job cost against the estimate?
Job cost against estimate is a report. It sets hours, loads, fuel, labour and hired plant entered on the job beside the quoted figures. Estimators read it before pricing the next similar dig. Owners read it too.
Who closes a job and what happens to retention?
The office closes it once final quantities are agreed with the client. Retention is tracked on the job until it is released. It stays on file for repeat work. A later enquiry can refer back to it.
How this feature fits the system.
Excavation Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Enquiries and estimates
Bids are built from measured cut and fill and stored machine, tipper and tip rates, and each revision stays with the enquiry.
Estimate/Quotation ManagementMachine and operator allocation
The planner sees which excavators, tippers and operators are free before a new job is promised a start date.
Resource AllocationOperator timesheets
Operators, drivers, banksmen and labourers are marked present against a job, and wages and overtime follow from those entries.
Attendance & Time TrackingTell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements