Jobs and programme for excavation sites

Jobs and programme gives every excavation site its own record. The job carries the accepted quantities, the stages from strip to backfill, the start dates and the excavators and crews it needs. The planner reads the programme, foremen open the day’s job on a phone, and owners see which sites are running.

What an excavation job record holds

Every site, whether a basement, a trench run or a stretch of subgrade, is opened as a job. It holds what was sold, what is planned and what has happened so far. Estimate figures sit at the front. Site entries gather behind them.

Site, client and contract basis

The client, the site address and the contact on site are entered when the job opens. So is the pricing basis, by volume, by the hour or as a lump sum, copied from the signed contract. Claims later follow that basis.

Stages in digging order

Strip topsoil, bulk dig, trim and backfill are set up as stages, each with its own quantity. A trench job might run by section instead. Stages can be added when the scope grows and the client agrees.

Start dates and stage dates

Each stage holds a planned start and finish. The foreman and the yard read the same dates. When the strip finishes late, the later stages show the knock-on. Dates are edited as the plan moves.

Machines and crews named

Each job lists the excavators, tippers and crews it needs, with the stage each is for. Names are added from the fleet and the people list. The need is written down. Allocation then checks them against other sites.

A job’s life from signed quote to close-out

A job is opened on the day a quote is accepted and stays open until final quantities are agreed. Between those two points the site, the yard and the office all write to it. The record collects what the site produces.

Opening the job after acceptance

Quantities and rates come across from the accepted quote without retyping. The planner adds the start date, picks the stages, names the foreman and records the client’s order number if one was issued. The first site log can then open.

Mobilising on the first morning

On the first morning the foreman opens the job on a phone and finds the stage, the machines and the operators waiting. Tipper drivers see the tip named. Anything missing is raised with the planner that day.

Changing the plan mid-job

Rain closes the trench, or the client brings a stage forward. The planner edits the dates and the machines named move with them, so the yard sees the change. A servicing slot can be shifted to suit.

Close-out of the finished job

When the last stage is trimmed and backfilled, final quantities are agreed with the client. Retention is tracked. The job’s actual cost is set beside the estimate, and the record stays on file for repeat work.

Who reads the job and what they see

Five roles read a job. The figures are the same for all, and what changes is the part each reader goes to first.

Owners watch live sites

Owners see jobs running and jobs about to start, with cost set against estimate for each. They also see which excavators sit on which site and how busy each one is. They promise start dates with that in view.

Estimators learn from finished jobs

Estimators open a closed job and read actual cost beside the bid. Stage quantities show where the dig ran heavier or lighter than priced. Rates are then reviewed. The next similar quote starts from better figures.

Foremen open the day’s job

The foreman opens the day’s job on a phone and reads the stage, the planned quantity and the machines named, with any note the planner left. Instructions from the client sit on the same record. Logging begins from there.

Yard and workshop plan around it

The yard reads start dates and the machines named, then plans greasing and servicing around them. A unit due for service is flagged before it is sent out to a new site. The workshop sees the job’s site.

Setting up jobs for an excavation firm

Four choices shape every job record. Make them with the owner, the planner and the senior foreman before the first live job is loaded. Revisiting them later means editing running records.

Who may change a job for Jobs and programme

Decide who edits stages, dates and named machines once a job is running. A planner and a foreman may want to move the same date on the same day. Pick one owner of the programme.

How finely to cut stages

A basement may need strip, bulk dig, trim and backfill, while a short trench needs one stage. Too fine a split asks the foreman for entries nobody reads, and the stage dates start to mean little. Keep the stages that get claimed.

How running jobs come across for Jobs and programme

Live jobs are brought across from the sheets used now, with client, site, stage and machines named and the dates already agreed. Unpaid claims move too. The office checks a few jobs before the first site log opens.

Which report to read first for Jobs and programme

Start with job cost against estimate, then machine hours and utilisation by excavator and tipper. The first shows whether the programme made money. The second shows whether the fleet was kept busy. Both sit on the same job records.

How the programme ties into other features

The job is the thread that the rest of the product hangs on. Estimates open it, allocation fills it, the site log feeds it and claims close it. Whatever is entered elsewhere is entered against a job, so the job is the first place to look when a figure is questioned. The links are listed below.

  • Takes quantities, stages and rates from enquiries and estimates
  • Asks machine and operator allocation which excavators are free
  • Receives hours, loads and instructions from daily site logs
  • Reads attendance from operator timesheets for each site
  • Passes agreed stages and quantities to progress claims and invoices

Where job records stop and others take over

The job record plans and collects. It does not move a machine by itself, so the planner still decides who goes where. It is not a critical-path scheduler for a main contractor’s whole building project, where Construction Project Management Software is closer. Contract terms, delay claims and extensions of time stay with the owner and a legal adviser. A single short hire needs only a diary entry.

FAQ

Frequently asked questions

Can one job cover several stages and gangs?

A job holds every stage the work needs, such as strip, bulk dig, trim and backfill. Each stage can name its own machine and crew. A short job can have a single stage. The split is yours to choose.

What if the start date moves after the job opens?

Edit the date on the job or the stage. The machines and operators named stay with it. Yard and foreman read the new date the next time they open the record, so nobody works from the old plan.

How does a client with several sites appear?

Each site gets its own job. Under the same client, cost, loads and claims stay apart for a basement on one street and a trench on another. What the client still owes can be read across both.

Can we see job cost against the estimate?

Job cost against estimate is a report. It sets hours, loads, fuel, labour and hired plant entered on the job beside the quoted figures. Estimators read it before pricing the next similar dig. Owners read it too.

Who closes a job and what happens to retention?

The office closes it once final quantities are agreed with the client. Retention is tracked on the job until it is released. It stays on file for repeat work. A later enquiry can refer back to it.

Where it fits

How this feature fits the system.

Excavation Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and estimates

Bids are built from measured cut and fill and stored machine, tipper and tip rates, and each revision stays with the enquiry.

Estimate/Quotation Management

Machine and operator allocation

The planner sees which excavators, tippers and operators are free before a new job is promised a start date.

Resource Allocation

Operator timesheets

Operators, drivers, banksmen and labourers are marked present against a job, and wages and overtime follow from those entries.

Attendance & Time Tracking
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements