See who and what is free before anybody promises a date.
Resource allocation shows who and what is free before anybody promises a date. People, crews, vehicles and machines are booked against a job for particular days, and a second booking for the same slot is refused. Nobody has to hold the week in memory any more, and the Thursday phone call stops happening.
Explore resource allocation for your industry →
The schedule lives with one person. That person knows that the senior technician is on a client site until Wednesday, that the second van is in the workshop, and that one client has been waiting since last week. Then the coordinator takes leave, and the office discovers how much of the business was inside one head.
Assign the crew, the van and the machine to the job for the days they are needed. Anybody else looking at Thursday sees them taken. Leave, holidays and jobs that have overrun are on the same calendar, because those are what break a plan made on Monday.
What your team uses today.
The module takes over these, one at a time, so nothing has to stop while it is set up.
- The whiteboard in the coordinator’s room
- A calendar sheet of crews
- Phone calls to ask who is free
The problems this is meant to ease.
What resource allocation does.
What this looks like in a working week.
Illustrative scenarios, written to show the shape of the work. They are not accounts of client systems.
The people who open this every day.
From first conversation to daily use.
Map people and assets
List the people, crews, vehicles and machines you schedule. A note follows. It shows how each person, crew and machine will appear.
Capture skills and leave
Supply skills, certificates and leave rules. A view of who is free on each day comes back to try.
Trial on a past week
Use a past week as a trial. Proposed bookings are compared with what happened.
Train coordinators and supervisors
Each group practises booking and swapping. A quick card for the phone follows.
Live scheduling
Fresh jobs are booked in the tool from the date fixed. The team reads the idle and overloaded views.
How you would know it is working.
Record where you stand before it goes live, so the change is measured against your own figures.
- Idle and overloaded days, by person and asset
- Bookings refused as a clash
- Planned hours against hours worked
- Certificates nearing expiry, by person
- Jobs that overran and the bookings they pushed
It is one part of a system, not an island.
A module earns its place by what it passes to the next one. These are the connections we set up most often.
- Technician scheduling
- Task management
- Attendance and time tracking
- Project timelines with Gantt charts
Products that include it.
How we would put it in.
Turn the capability into an acceptance check.
Agree what a correct result looks like for this module, including the case that needs a person to intervene.
Double booking found on site
What becomes available when a booking is moved or cancelled?
Use “Double booking found on site” to move a booking, then cancel a second example. Check the released slot, the person or resource still assigned, and any amount left to settle before accepting the revised schedule.
Background reading: ERPNext: appointment records
Questions owners ask about resource allocation.
Why change when our whiteboard works?
Keep it while the whole team stands in front of it every morning. It fails the day crews start going straight to site, or when the person who maintains it is on leave and the board means nothing to anybody else.
Can a technician see the week on a phone?
Yes. The technician sees only their own row: the address, the time, the job and the customer’s number. Our pest control system dispatches technicians on routes in the same way.
What happens when a job overruns?
Moving the assignment is up to the coordinator, and the system shows what it collides with next. The software cannot make the day longer. It can stop you promising a slot that was already gone.
Does leave show up here automatically?
Yes. Once leave is approved in the HR records, the day goes grey on the plan. That single link prevents most of the Thursday morning surprises.
What determines the cost of resource allocation?
The people and assets scheduled, the skill rules and the links to attendance and timelines. Licence expiry tracking is its own piece. Licence tracking and attendance links can each be removed from the quotation without disturbing the rest.
How soon can the coordinator put the whiteboard away?
That depends on how complete your skills and leave data are. Bookings, clash refusal, availability and leave come first. Skills expiry and utilisation follow. The proposal gives dates.
Businesses that ask for this.
Modules that work with it.
Resource Allocation in specific trades.
How the same module is used in different businesses, in the words written for each trade.
Electrical contractors
Foremen, wiremen and helpers are assigned to sites for the week, with clashes marked. The project manager sees which job has no gang. Moving a team updates both sites.
Electrical contractors pagePhotographers and videographers
A lead shooter, two assistants and a drone operator are placed against a wedding date before the quote goes out. Freelancers already booked elsewhere show as busy. Editing slots are held after the shoot too.
Photographers and videographers pageAd-film companies
Directors, directors of photography, gaffers and kit are booked against shoot days. Clashes between two commercials show at once. Production managers see who is free before a hold is promised.
Ad-film companies pageAnimation studios
Animators, riggers and compositors are booked against shots across several episodes. The producer spots a rigger committed to two scenes in the same fortnight. Open freelance gaps are visible.
Animation studios pageArchitects
Senior architects, site engineers and visualisers are booked across live projects. The partner sees who is free before a new pitch is accepted. Clashes in workload show on one chart.
Architects pageBranding and design studios
Designers, copywriters and the creative director are booked across projects by stage. The board shows who is overloaded before a new pitch is accepted. Leave and public holidays are marked.
Branding and design studios pageTell us how you handle resource allocation today.
A spreadsheet, a register or another system: say which, and we will tell you plainly what is worth changing.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements