Daily site logs for excavation foremen

Daily site logs let an excavation foreman record the day from a phone. Hours, loads, weather, groundwater, photographs, prestart checks and client instructions go onto the job as they happen. The office reads the same entries, and a variation or dayworks claim later has a written trail behind it.

What one excavation site day records

One log covers one site for one day. It is opened by the foreman and filled with the facts that settle arguments later. Short fields are kept short. Photographs sit beside the entry they explain, so a reader does not hunt for them.

Hours by machine and operator

Each excavator, tipper and attachment gets its hours for the day, with the operator named. Hours are priced at the machine’s rate and flow to job cost. The hour-meter reading can be noted alongside them.

Loads, weather and groundwater

Truck loads are noted against their tip, with the weather and any groundwater met in the cut or the trench. Silt fence and sump pump hours go in as well. Rain stops explain a short day.

Prestart checks and photographs

The prestart check is ticked for each machine before it digs. Photographs of the cut, the batter and any services found are attached to the day. They show the ground as it was. A reader far from the site can follow.

Client instructions as given

When the client’s representative asks for more depth, a wider batter or an extra trench, the foreman writes the instruction, the time and who gave it. The entry is dated. A variation later stands on it.

A dig day from prestart to last load

A site log is filled in as the day goes, not rebuilt from memory at dusk. Work is done from a phone browser, standing in the cut or in a cab. Entries are brief. Several are made before the first load leaves.

Opening the log at first light

The foreman opens the day’s job, confirms who is on site and ticks the prestart check on each excavator and tipper. A failed check is noted for the yard to read. The day starts on record.

Logging loads at the gate

The banksman calls out each tipper as it leaves, and the foreman notes the load against its tip. Weighbridge ticket numbers are kept under haulage. The log carries the running count of loads for the day, tip by tip.

When the client changes the scope

The client’s engineer stands at the edge and asks for the trench to go deeper. A written instruction, a photograph and a note of the machines kept on for it go into the log. That note starts a dayworks claim.

Closing the day for Daily site logs

At the end of the shift the foreman checks hours against who actually worked, adds the weather note and closes the log. The office reads it when it next opens. Nobody rings the site to ask what happened.

What each person reads in a site log

Four roles read the same entries. Each is looking for something different. The foreman writes, and the rest of the office reads what was written to settle cost, servicing and billing.

Foremen write the day

Foremen open the day’s job, log hours, loads and instructions, tick the prestart check and attach photographs. Where a site has no phone signal, entries cannot save until the handset is back in range. Plan for that.

Owners read it for cost

Owners read hours against plan, loads against quantity and any instruction that will turn into a variation. They see trouble on a site early, without ringing the foreman or driving out. Photographs back up each figure.

Yard and workshop take the hours

The yard takes machine hours from the log to keep service counters right and reads prestart notes for faults. A loose hose reported at prestart becomes a workshop job, planned around the programme. Hours drive the counter.

Accounts attach the entries

Accounts open the log behind a variation or dayworks line and attach the entries to the claim. They also check hired plant hours against the day’s log before paying the supplier. The trail is already written.

Site log choices for an excavation firm

Agree these four points with the owner, the senior foreman and the office before foremen start logging. A log that suits the office but annoys the cab will be skipped. A skipped log proves nothing.

Who edits a closed log

Decide whether a foreman may change an entry after the day is closed, and who approves the change. A client dispute is easier when the original entry stands beside any correction. Keep both versions visible to the office.

What the log leaves out for Daily site logs

Decide which fields are required and which are left off. A short log gets filled in. A long one gets skipped. Keep hours, loads, weather, prestart and instructions, and add others only when someone reads them.

How earlier site records come across

Paper diaries and old daily sheets from running jobs are rarely keyed in line by line. Load the job, its stages and the machines, and start logging on the first new day. The office spot-checks a few jobs first.

Which report to read first for Daily site logs

Machine hours and utilisation by excavator and tipper come straight from the log, so check those first. Loads hauled and fuel against hours follow once those entries begin. Both depend on foremen logging every day.

Where the site log hands on and takes from

The site log is the feature that foremen touch every day, so it sits in the middle of the product. It takes the plan from the job and gives back the facts. Hours, loads and instructions entered here are read by other features, not typed again. The hand-offs are below.

  • Takes the day’s stage and machines from jobs and programme
  • Sends operator hours to operator timesheets for attendance
  • Passes loads to haulage and load tickets against each tip
  • Gives machine hours to servicing so intervals stay right
  • Supplies the entries behind variations in progress claims and invoices

Where the site log stops

This log records what the foreman reports. It does not measure the dig, check a weighbridge or settle a dispute with the client. A photograph is evidence rather than proof of a contract change. Whether a variation is valid stays with the owner and a legal adviser. Without phone signal, entries wait. A one-machine job needs only a notebook.

FAQ

Frequently asked questions

Can a foreman fill the log without signal?

Entries need signal to save, so a foreman on a remote cut enters the day once the phone is back in range. Photographs wait the same way. Plan for that where a deep trench blocks the signal.

How does a daily log support a dayworks claim?

Each day’s entry holds the hours, the machines, the date and the instruction behind the extra work. Accounts attach those entries to the claim. The client reads dates, names and photographs rather than a bare total.

Can prestart checks be recorded for each machine?

Each excavator, tipper and attachment gets its prestart tick from the foreman before it digs. The yard sees any fault noted then. It is dated with the work, so a later breakdown has a record behind it.

Does the log record weather and groundwater?

Weather and groundwater met in the cut are fields on the day’s entry. A wet trench is explained on the record. A rain day is too. Both support the programme and any claim for lost time.

Who sees the photographs and client instructions?

Photographs and instructions are attached to the day’s entry on the job. Anyone given access to the job reads them there. The office, the owner and accounts are the usual readers. They are kept with the work.

Where it fits

How this feature fits the system.

Excavation Company Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Enquiries and estimates

Bids are built from measured cut and fill and stored machine, tipper and tip rates, and each revision stays with the enquiry.

Estimate/Quotation Management

Machine and operator allocation

The planner sees which excavators, tippers and operators are free before a new job is promised a start date.

Resource Allocation

Operator timesheets

Operators, drivers, banksmen and labourers are marked present against a job, and wages and overtime follow from those entries.

Attendance & Time Tracking
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements