Construction · Paving and Road Construction Management SoftwareRoad tenders, plant dockets, shift crews and stage claims, kept on one job record.
Manage paving tenders, measured areas, asphalt and aggregate dockets, paver and roller crews, quality tests, stage claims and defect repairs in one system. Each job carries its sections, its tonnage laid and its costs from the first measure to the last retention release. A foreman logs the shift from a phone, and the estimating office sees those figures as they land.
- Material, plant and labour rates loaded as your estimators price a tender
- Live jobs, clients and unpaid claims carried across
- Mix, section type and claim stage changes made by GullySystem staff on request
Paving and road construction companies run tenders, shifts, plant dockets and stage claims on Paving and Road Construction Management Software, which GullySystem configures around the contractor’s own jobs. Each section holds its tonnage delivered, area laid, crew, machines and test results. Foremen record the shift on a phone. Claims and defect repairs follow.
What goes wrong before the software.
How the work flows through it, step by step.
- 1
Tender
An invitation arrives from a council, developer or main contractor. The estimator measures areas and depths, prices materials, plant and labour, and submits by the deadline. Bids close fast.
- 2
Award and sections
A won tender becomes a job. The road is split into sections or chainages, each with its layers, specified mix and quantity.
- 3
Shift planning
The planner books crews, paver, rollers and tippers against each shift, along with traffic control and the plant’s production slot. Weather holds move the whole booking.
- 4
Laying and dockets
The foreman records each truck docket, the area laid, surface temperatures and delays. Tonnage is totalled against the section.
- 5
Tests and approval
Cores, density checks and levels are logged by section. The client’s engineer sees which layers are tested and which wait. Gaps show early.
- 6
Claims and defects
Measured work becomes a stage claim with its dockets and tests attached. Defects reported later are logged to the same section and sent to a repair crew.
What is inside.
Every module can be switched on, left out or changed to match how your team already works.
The business modules it is built from.
Each one is also available on its own, or inside a system built for you.
- Estimate/Quotation Management
Tenders are priced from the firm’s own rates per square metre, tonne and linear metre, with each revision and the final tender result kept.
- Project Timelines with Gantt Charts
Shifts sit on a calendar with their crews, machines and traffic control, so a held shift visibly moves the dependent bookings after it.
- Goods Receipt (GRN)
Every asphalt docket is entered as it arrives, with weight, mix and truck, and checked against what the foreman reports as laid.
- Attendance & Time Tracking
Operator and labourer hours are recorded by shift and machine, so paver and roller crews are costed to the section they worked.
- Stock Tracking and Alerts
Aggregate, emulsion and line paint movements are logged from receipt to shift issue, with a warning when a heap or drum runs low.
- Quality Control
Laying temperatures, density readings and cores are recorded against the layer and chainage, each beside the specification it must meet.
- Invoice Management
Stage claims are raised from measured work with dockets and test records attached, and retention held on each job is shown beside receipts.
- Ticket Management
A reported pothole or failed joint becomes a numbered call on its section, assigned to a repair crew until the surface is made good.
How we would put it in.
Setup, data migration, integrations and anything built on top.
Explore moreBrowse business and AI solutions
Looking for another part of your workflow? Browse the modules by business function.
- Applicant Tracking (5)
- CRM (8)
- Finance & Accounting (10)
- Helpdesk (4)
- Human Resources (13)
- Inventory Management (5)
- Project Management (7)
- Manufacturing (6)
- Procurement (4)
- Sales and Distribution (6)
- Field Service (5)
- Statutory and Compliance (4)
- Retail and POS (4)
- Bookings and Appointments (3)
- Subscriptions (2)
- Assets and Fleet (4)
- Platform (6)
- Analytics (2)
- Documents (1)
- All business solutions
One system, each person sees their part.
For owners
See open tenders, jobs in progress, tonnage against allowance, claims awaiting payment and retention held by client. Each figure opens the job behind it.
For estimators
Build tenders from current rates, compare past jobs of the same layer and mix, and follow which bids were won.
For planners and foremen
Book shifts, record dockets, areas, temperatures and delays from a phone, and re-plan when a shift is held.
For quantity surveyors and the office
Measure completed work, raise stage claims with their supporting dockets and tests, and post receipts.
For plant managers
Watch machine hours, servicing due dates and diesel drawn, and see which jobs carry each machine’s cost.
The numbers the owner asks for.
- Tonnage delivered against area and depth by section
- Tenders submitted, won and lost by client
- Shift crews and machines booked against hours worked
- Test results outstanding by layer and chainage
- Stage claims raised, approved and received
- Retention held and due for release
- Defect calls by section and repair cost
Who this is built for.
- Contractors who lay asphalt wearing and base courses on public roads
- Companies that build car parks, industrial yards and private access roads
- Firms that construct sub-bases, kerbs and drainage ahead of the surfacing
- Road maintenance teams that patch potholes and reseal surfaces under term contracts
- Companies that run their own asphalt plant and supply other paving firms
When it is not the right choice.
- A driveway paver who completes a handful of small jobs a month can work from a quotation pad and a notebook.
- Companies whose main work is earthmoving or pipe laying will find Excavation Company Management Software closer, and building contractors will find Construction Project Management Software closer.
Adapted to your business before it goes live.
You are not handed a login and left to it. The product is set up around your records, your people and the tools you already use.
Works alongside
- SMS
- WhatsApp or other messaging
- Accounting software export
- Spreadsheet import
- Telematics feed
Questions to settle before choosing the system.
Review these scenarios against the product configuration and record anything that still needs to be agreed.
Plant servicing and fuel
What proves that a planned task was actually completed?
Select an overdue entry in “Plant servicing and fuel”. Ask which work record closes it and what remains visible when the visit is postponed or only part of the job is done.
Background reading: ERPNext: maintenance plans
Tenders and estimates
Which assumptions stop being valid when the quotation changes?
For “Tenders and estimates”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.
Background reading: ERPNext: quotation terms
Questions owners ask before a demo.
Are asphalt plant dockets held for every truck?
Yes. A docket carries its number, mix, weight, truck and time. It is attached to the section being laid, and tonnage per section is totalled from those entries.
Can a tender be priced by area, tonne and length together?
Yes. Pay items can be priced by square metre, by tonne or by linear metre, and a tender can mix all three. Later revisions sit beside the first one.
How does a rained-off shift get handled?
The planner marks the shift held and moves it. The crew, the machines and the traffic control booked to it shift with it, and each affected foreman sees the change.
Can core and density results be attached to a chainage?
Yes. Each result is stored against its section and chainage with the layer, the mix and the specification. The engineer can read all results for a stretch in one place.
Are plant hours and fuel costed to jobs?
Yes. Machine hours and diesel drawn are recorded per shift. The hourly rate carries them into job cost. Servicing due dates stay on the machine record.
Are term maintenance contracts supported?
Yes. A pothole or edge break arrives as a call, is placed on its section, goes to a repair crew and is billed under the term contract’s schedule of rates.
Can foremen use it where signal is poor?
Not without a connection. Entries are made on a phone browser, so readings taken in a cutting or on a rural road are keyed once the crew is back in range.
Can it send claims to the client in the form they ask for?
Yes, in the form each contract asks for. Pay items, supporting attachments and numbering are agreed with you in the first workshop, so the first claim sent to a client already matches the contract documents.
Who sees tender margins?
Each person’s role decides what they can open. Estimators and owners can see margins and rates, while foremen and plant staff see only their own shifts and machines.
What does it cost and how do we try it?
Users, plant and crews on the system, and the tender and claim stages to set up, shape the quote. A telematics feed, spreadsheet import and accounting export add work, and so do open jobs carried over. A trial on a live tender or job comes first. After that, parts are priced one by one.
When would foremen and planners start using it on a job?
Tenders and estimates, jobs by section and chainage, shift planning and plant dockets give a road job its backbone, so these start. Crews, timesheets and yard stock follow. Quality tests, subcontractors, stage claims and retention come after. Servicing and fuel arrive last. The proposal lists dates.
What would the contractor need to get ready?
Get ready your mixes and layers, section and claim stages, plant list and crew rules. A tender, a plant docket, a core or density test sheet and a stage claim in the client’s form show the paperwork. The estimator, planner, foreman, quantity surveyor and plant manager each need a place. Telematics access is needed to feed it.
Wondering what it would cost? Share your requirements and an engineer will come back with a scope.
Every part, on its own page.
Each page covers one part of the system: what it records, who uses it and what it hands on.
- Tenders and estimates for road paving firms
- Jobs, sections and chainages for road builders
- Shift planning and weather holds for paving
- Plant dockets and tonnage for road construction
- Crews, plant hours and timesheets for paving
- Yard stock, aggregate and emulsion control
- Quality tests and level checks on road jobs
- Subcontractors and hired plant for road work
- Stage claims and retention for road contractors
- Defects and repair calls for road maintenance
- Plant servicing and fuel costing for paving
Built for.
The trades this product is set up for. Pick yours to see how the work runs there.
See Paving and Road Construction Management Software set up around your records.
Tell us how you run things today. An engineer reads it and writes back with what fits as it is, what would need changing, and what we would start with.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements