Plant dockets and tonnage for road construction
Every truck that leaves the asphalt plant carries a weight ticket. This feature records each docket as the truck arrives, with its mix, weight and time, and attaches it to the section being laid. Tonnage is then totalled and set against the area and depth the foreman reports, so a difference shows on the day.
What a plant docket entry keeps
A docket is the plant’s proof that a load left the gate. The entry copies what the paper ticket says and adds where the load went. Tonnage per section is built from these lines. Each entry is made once, as the truck arrives.
Dockets through a day of laying
Dockets arrive one truck at a time over a shift. The record is built as they land, not gathered at the end. These moments follow a base course. They run from the first load to the plant’s statement that comes later.
Who enters dockets and who reads totals
Foremen key the loads, and several other people read what those entries build. Each role sees the same dockets through a different lens. Role decides which figures open. A phone shows far less than the owner’s screen.
Decisions to settle before dockets are keyed
A few choices decide how clean the tonnage figures are. Agree them before the first docket is entered. They need the foreman, the planner and the office in one conversation.
How dockets connect to other records
Other records lean on the docket. Tonnage totals appear in claims and cost figures, and the docket itself is evidence in a dispute. These links show where each docket is read again, and by which feature. A hired haulier’s ticket is read beside it. Nothing is copied by hand.
- Each docket adds tonnage to a section from the job
- Shift bookings give the mix and plant slot expected
- Stage claims attach dockets behind each measured quantity
- Test records name the load a core came from
- Hired haulage tickets are matched against these docket weights
Where docket recording stops
The feature records and compares. It does not weigh the truck, and it does not tell the plant what to charge. Disputes with the asphalt supplier stay with the owner and the firm’s adviser. Payment terms stay in the supply agreement. A small job with a single supplier and a few loads can be checked from the paper tickets alone.
Frequently asked questions
Can I see which trucks delivered to a section?
Open the section. Its dockets are listed with the truck, the mix, the weight and the time. You can follow any load from the plant statement to the stretch where it was laid, in one view.
What if a docket is keyed against the wrong section?
The office moves it. Corrections leave a trace, so the earlier entry is still known. Tonnage for both sections is totalled again, and the person on site is told to look at the updated figure for the day.
Does it compare tonnage with the area laid?
It sets the two side by side. Area and depth are recorded, and the section shows tonnage delivered against what that area should take. The planner and the owner can then judge the gap and ask why.
Can aggregate loads be recorded as well as asphalt?
Both go in the same way. An aggregate docket carries its material and weight. The truck and time are recorded too. It joins the section or the yard heap it was delivered to, so sub-base work is covered.
What does the estimator get from the dockets?
Real tonnage per layer and mix. When the next tender is priced, the estimator sees how much each earlier section actually took. Allowances move from guesses to figures kept on the record, job after job.
How this feature fits the system.
Paving and Road Construction Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Tenders and estimates
Tenders are priced from the firm’s own rates per square metre, tonne and linear metre, with each revision and the final tender result kept.
Estimate/Quotation ManagementShift planning and weather holds
Shifts sit on a calendar with their crews, machines and traffic control, so a held shift visibly moves the dependent bookings after it.
Project Timelines with Gantt ChartsPlant dockets and tonnage
Every asphalt docket is entered as it arrives, with weight, mix and truck, and checked against what the foreman reports as laid.
Goods Receipt (GRN)Tell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements