Stage claims and retention for road contractors

A stage claim turns measured road work into money owed by the client. This feature builds each claim from measured quantities by section, attaches the dockets and test results behind them and follows the claim to approval and receipt. It also tracks retention held and released on every job, client by client.

What a stage claim and retention record keeps

A claim is a list of measured lines, each with the evidence behind it. Retention is a sum held back until the contract allows its release. This record keeps both, with dates and amounts. Every figure on a claim traces back to the road.

Measured quantities by section

Claims begin with measure. The quantity surveyor enters work completed on each section, priced at the contract’s pay item rates. A line reads as a stretch of road and a layer, never as a lump sum.

Dockets and test results attached

Evidence travels with the line. The asphalt dockets and the cores, densities and levels for that section are attached. The client’s surveyor can follow a quantity to its loads and then on to its proof.

Claim stage, number and status

Every claim has a number and a stage. It shows whether it is drafted, sent, approved in part or in full, or received. Layout and numbering follow the contract documents, as agreed at the first workshop.

Retention held and released

Retention is tracked job by job. The amount held on each claim is shown, with the date it falls due for release under the contract’s terms. Released sums are recorded when they are received from the client.

A claim from measure to receipt

Every stage claim passes through several hands before money arrives. Four moments follow one claim on a road resurfacing. They run from the measure at the end of a stage to the day the client’s payment is posted. Each has an owner.

Measuring the stage on site

Stage work is complete. The surveyor measures the area laid and the depth, section by section, against the pay items. The figures go into a draft claim while the work is still fresh in everyone’s mind.

Attaching proof before sending

Proof goes first. Before the claim goes out, the office checks that each line has its evidence. Dockets are attached, and a line with a core still awaited is marked. Nothing goes out that will be queried on sight.

The client approves part of it

Some lines come back cut. The client’s reply is read, and the office records the approved amount and the reasons given. Lines not approved stay open, ready to be reclaimed once the evidence is complete.

Payment lands and retention moves

Payment finally lands. The receipt is posted against the claim, and the retention held on it is added to the job’s running total. Owners then see what has been paid and what is still held back by the client.

Who raises claims and who reads them

Claims involve money, so the screens are specific. A surveyor builds them, and others read the result. Each role opens the part of a claim that matters to its work. Tender margins are not shown on a claim.

Owners track unpaid claims

Owners see claims awaiting payment and retention held by client. Each figure opens the job behind it. The oldest claim sits at the top, so whoever is chasing payment knows exactly where to start the call.

Surveyors and the office raise claims

Quantity surveyors measure completed work and raise stage claims with the supporting dockets and tests. The office posts receipts. Both work from one record, so a receipt is never matched to the wrong claim by mistake.

Planners and foremen supply the evidence

Evidence starts on site. Foremen record dockets, areas and temperatures as they lay. Planners see which sections are finished and ready to measure. Those entries become claim lines without being copied out again by the office.

Estimators compare claims with tenders

Estimators read claims against tenders. A pay item that is claiming faster or slower than planned shows up in the figures. The next tender is then priced with that in mind, using what the job actually claimed.

Decisions to settle before the first claim

Each client has its own claim form, stages and retention terms. Settle them before the first claim is raised. The surveyor leads, with the owner and the office present to confirm what the contracts say.

Who may approve and send

Decide who signs off a claim. A surveyor may draft it, and the owner or the office manager may approve it before it is sent. The record shows who approved each claim, and on what date.

What a claim leaves out for Stage claims and retention

Agree which items stay outside a claim. Variations still being argued, day-works and claims for delay may be raised separately. Writing the rule down stops one disputed item from holding back a clean claim for the stage.

How unpaid claims come across

Unpaid claims need care. Live jobs, clients and claims still awaiting payment come across from the spreadsheets and job files you keep now. Retention held on open jobs is entered with its due dates, so release is not forgotten.

Which report to read first for Stage claims and retention

Begin with stage claims raised, approved and received. It shows the pipeline of money from site to bank. Then read retention held and due for release, which is easy to lose track of once a job has finished.

How claims connect to the road record

A claim is built from other records and gives back a record of its own. Measure comes from sections, evidence from dockets and tests, and receipts go to the job’s money position. These links show the flow. Each figure is entered once. Nothing is retyped for the client.

  • Pay items from the tender become measured claim lines
  • Section measure supplies the quantity for each line
  • Plant dockets attach behind the tonnage claimed
  • Test results and levels attach to the layer claimed
  • Receipts and retention pass to accounting software by export

Where claims and retention stop

The feature builds, tracks and reports. It does not decide whether a claim is valid, negotiate with the client or set retention terms. Those terms come from the contract and stay with the owner and the firm’s legal adviser. Tax treatment of claims and retention stays with the accountant. A single small job with one invoice needs no stage claims.

FAQ

Frequently asked questions

Can a claim follow the client’s own layout?

Yes, in the form each contract asks for. Pay items, attachments and numbering are agreed at the first workshop. The layout is also checked before launch against what the client expects. Contract documents are the guide.

What happens to lines the client rejects?

They remain open on the claim. A reason is recorded against each one. The line can be reclaimed on a later claim once the missing test or measure is added. Approved lines on the same claim are not affected.

How is retention shown to the owner?

Retention appears by job and by client. The owner sees the sum held, the sum released and the date each part falls due. A job near completion shows its release date next to what is still held.

Do receipts have to be posted by hand?

The office posts each receipt against its claim. An accounting software export can also carry the figures across to your books. Matching a receipt to a claim takes one entry. Nobody has to search for it.

Can I see which claims are overdue?

Claims awaiting approval or payment are listed with their age. The oldest sits first. Each opens down to its lines and evidence. That is the list to take into a call with the client or its surveyor.

Where it fits

How this feature fits the system.

Paving and Road Construction Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Tenders and estimates

Tenders are priced from the firm’s own rates per square metre, tonne and linear metre, with each revision and the final tender result kept.

Estimate/Quotation Management

Shift planning and weather holds

Shifts sit on a calendar with their crews, machines and traffic control, so a held shift visibly moves the dependent bookings after it.

Project Timelines with Gantt Charts

Plant dockets and tonnage

Every asphalt docket is entered as it arrives, with weight, mix and truck, and checked against what the foreman reports as laid.

Goods Receipt (GRN)
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements