Stage claims and retention for road contractors
A stage claim turns measured road work into money owed by the client. This feature builds each claim from measured quantities by section, attaches the dockets and test results behind them and follows the claim to approval and receipt. It also tracks retention held and released on every job, client by client.
What a stage claim and retention record keeps
A claim is a list of measured lines, each with the evidence behind it. Retention is a sum held back until the contract allows its release. This record keeps both, with dates and amounts. Every figure on a claim traces back to the road.
A claim from measure to receipt
Every stage claim passes through several hands before money arrives. Four moments follow one claim on a road resurfacing. They run from the measure at the end of a stage to the day the client’s payment is posted. Each has an owner.
Who raises claims and who reads them
Claims involve money, so the screens are specific. A surveyor builds them, and others read the result. Each role opens the part of a claim that matters to its work. Tender margins are not shown on a claim.
Decisions to settle before the first claim
Each client has its own claim form, stages and retention terms. Settle them before the first claim is raised. The surveyor leads, with the owner and the office present to confirm what the contracts say.
How claims connect to the road record
A claim is built from other records and gives back a record of its own. Measure comes from sections, evidence from dockets and tests, and receipts go to the job’s money position. These links show the flow. Each figure is entered once. Nothing is retyped for the client.
- Pay items from the tender become measured claim lines
- Section measure supplies the quantity for each line
- Plant dockets attach behind the tonnage claimed
- Test results and levels attach to the layer claimed
- Receipts and retention pass to accounting software by export
Where claims and retention stop
The feature builds, tracks and reports. It does not decide whether a claim is valid, negotiate with the client or set retention terms. Those terms come from the contract and stay with the owner and the firm’s legal adviser. Tax treatment of claims and retention stays with the accountant. A single small job with one invoice needs no stage claims.
Frequently asked questions
Can a claim follow the client’s own layout?
Yes, in the form each contract asks for. Pay items, attachments and numbering are agreed at the first workshop. The layout is also checked before launch against what the client expects. Contract documents are the guide.
What happens to lines the client rejects?
They remain open on the claim. A reason is recorded against each one. The line can be reclaimed on a later claim once the missing test or measure is added. Approved lines on the same claim are not affected.
How is retention shown to the owner?
Retention appears by job and by client. The owner sees the sum held, the sum released and the date each part falls due. A job near completion shows its release date next to what is still held.
Do receipts have to be posted by hand?
The office posts each receipt against its claim. An accounting software export can also carry the figures across to your books. Matching a receipt to a claim takes one entry. Nobody has to search for it.
Can I see which claims are overdue?
Claims awaiting approval or payment are listed with their age. The oldest sits first. Each opens down to its lines and evidence. That is the list to take into a call with the client or its surveyor.
How this feature fits the system.
Paving and Road Construction Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Tenders and estimates
Tenders are priced from the firm’s own rates per square metre, tonne and linear metre, with each revision and the final tender result kept.
Estimate/Quotation ManagementShift planning and weather holds
Shifts sit on a calendar with their crews, machines and traffic control, so a held shift visibly moves the dependent bookings after it.
Project Timelines with Gantt ChartsPlant dockets and tonnage
Every asphalt docket is entered as it arrives, with weight, mix and truck, and checked against what the foreman reports as laid.
Goods Receipt (GRN)Tell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements