Yard stock, aggregate and emulsion control
Yard stock follows the loose materials of a paving firm. Aggregate heaps, bitumen emulsion, tack coat and line paint are logged as they are received, issued to a shift and left in the yard. A planner can see what a shift will need, and a warning appears when a heap or drum runs low.
What the yard stock record holds
A yard holds more than asphalt trucks ever show. Heaps of aggregate sit beside drums of emulsion and tins of line paint. The stock record keeps one line for each material, so a storeman or a foreman reads the same balance. Each movement is dated.
Stock moving through a paving yard
Materials arrive, leave and run out at awkward times. Four moments follow a heap and a drum through a busy fortnight. They start with a delivery on Monday. They end on the morning someone notices the tack coat is nearly gone.
Who looks after stock and who reads it
Yard stock is handled by few hands but read by several. The storeman and the foremen enter movements. Owners and planners read balances to decide what to buy and when to lay. Role decides which screens open.
Decisions to settle before stock is counted
A stock record is only as good as its first count. Settle four points before opening balances are entered. The owner, the storeman and the planner should agree them together on site.
How yard stock links to other features
Materials are the link between the yard and the road. Receipts arrive from suppliers, issues go to shifts, and cost reaches sections. These connections show where the stock record gives and where it receives. Balances are never retyped. Each feature reads one balance, never a copy.
- Shift bookings state the materials a shift will draw
- Issued quantities add material cost to the section
- Aggregate dockets from the plant add to heap balances
- Tender allowances are compared with quantities actually issued
- Supplier orders and tickets are matched to deliveries received
Where yard stock tracking stops
The record counts what is entered. It does not weigh a heap, read a drum’s level or scan a delivery by itself. Someone still walks the yard. Pricing and payment terms for material stay with the office and the supplier. Chemical safety rules for emulsion stay with the owner and a safety adviser. A firm that keeps one small heap can count it by eye.
Frequently asked questions
Can asphalt be tracked as yard stock?
Asphalt is a docket matter. Plant dockets record it, since it is laid the day it arrives. This tracking is for materials that wait in the yard, such as aggregate, emulsion, tack coat and line paint.
How does a warning for low emulsion appear?
Levels are set once. The office sets a level for each material, and when the balance drops below it, the stock screen flags the material. Planner and storeman see the flag before the next shift needing emulsion is booked.
Can stock be issued to a job without a shift?
Issues are booked against a shift, so the cost reaches a section. That is the rule. For loose items taken for a repair call, the issue can name the call instead, and the cost joins that defect record.
What if a heap count does not match the book?
The difference is shown. When the count is entered, the office picks a reason, such as spillage or an unrecorded issue. It then writes the balance to the count, and the adjustment stays on file.
Do foremen need a connection to book an issue?
A connection is needed. Entries are made on a phone browser, so a foreman in a cutting with no signal keys the issue once back in range. The balance updates when the entry is saved to the record.
How this feature fits the system.
Paving and Road Construction Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Tenders and estimates
Tenders are priced from the firm’s own rates per square metre, tonne and linear metre, with each revision and the final tender result kept.
Estimate/Quotation ManagementShift planning and weather holds
Shifts sit on a calendar with their crews, machines and traffic control, so a held shift visibly moves the dependent bookings after it.
Project Timelines with Gantt ChartsPlant dockets and tonnage
Every asphalt docket is entered as it arrives, with weight, mix and truck, and checked against what the foreman reports as laid.
Goods Receipt (GRN)Tell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements