Quality tests and level checks on road jobs
Quality tests and level checks keep the evidence that a road was built to its specification. Laying temperatures, density readings, cores and level surveys are stored against a section, a layer and a chainage, beside the specification each is read against. The engineer can see which layers are tested and which are waiting.
What a road test record keeps
A test result is only useful when it can be found again. Each record ties a reading to a stretch of road, a layer and a mix. The laboratory’s figures and the site’s readings then sit together. Nothing floats free of its chainage.
Testing a layer from laying to sign-off
A layer is laid in one shift and judged over several. Tests are taken on the road, read in a laboratory and accepted by an engineer. Four moments follow a wearing course. They run from the first temperature check to client acceptance.
Who records tests and who reads them
Foremen and surveyors enter readings. The office handles laboratory reports. Others read the picture they build. Each person sees the section’s tests that bear on a decision. The screens match the person’s job.
Decisions to settle before tests are logged
Each client has its own test points and its own tolerances. Settle them before the first reading is keyed. The contract documents are the starting point, and the estimator and a foreman should both be present.
How tests connect to the rest of the product
A test result is evidence, and evidence travels. It supports a claim, it explains a defect and it informs the next tender. These links show where a result is read again. Each result is entered once and attached to its section. Nothing is filed twice.
- Results attach to the section and layer being tested
- Temperatures point back to the plant docket that loaded
- Stage claims carry tests behind each measured quantity
- Failed tests can become defect and repair calls
- Shift planning checks tests before the next course
Where quality records stop
The feature stores readings and shows them beside the specification. It does not take a core, run a laboratory test or judge acceptance. The client’s engineer decides whether a layer passes. Method statements and standards remain with the owner and the firm’s quality adviser. A small private yard with no specification can rely on a site diary.
Frequently asked questions
Can laboratory reports be attached to a chainage?
They can. The office attaches the report to the core already logged for that chainage and layer. The engineer then reads site readings and laboratory figures together. Nobody searches separate reports for a figure again.
Does it tell me whether a layer has passed?
It shows the result beside its limit. The firm’s quality manager or the client’s engineer judges acceptance. That decision stays with people. The record makes the comparison fast and removes arguments about which figure was read.
Can a core be logged before its result arrives?
A core can wait. It is recorded with its point, layer and date when it is cut, and its status shows as waiting. The outstanding list then reminds the office to chase the laboratory until the figure arrives.
How are level surveys stored?
Readings go against the section and chainage, beside the design level. A survey of the binder course and one of the wearing course sit as two entries. The build-up can be checked layer by layer.
Can foremen enter temperatures from a phone?
A phone browser is enough. The reading carries the time and the section. Where signal is poor, the figure is keyed once the crew is back in range. Nothing needs to be written on the back of a docket.
How this feature fits the system.
Paving and Road Construction Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Tenders and estimates
Tenders are priced from the firm’s own rates per square metre, tonne and linear metre, with each revision and the final tender result kept.
Estimate/Quotation ManagementShift planning and weather holds
Shifts sit on a calendar with their crews, machines and traffic control, so a held shift visibly moves the dependent bookings after it.
Project Timelines with Gantt ChartsPlant dockets and tonnage
Every asphalt docket is entered as it arrives, with weight, mix and truck, and checked against what the foreman reports as laid.
Goods Receipt (GRN)Tell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements