Shift planning and weather holds for paving

Shift planning books crews, paver, rollers, tippers and traffic control for each shift on a road job, with the asphalt plant’s production slot beside them. When rain or a closure stops work, the planner moves the booking in one step. Foremen see the change on their phones.

What a paving shift booking records

A shift booking is a short record with a great deal attached to it. It names the job, the section and the date, then lists everyone and everything the shift needs. Planners read it as a list. Foremen read it as the day’s instructions.

Crew and machine bookings

Crews are booked by name. Paver, roller and tipper operators and labourers are placed on the shift with the machines they will run. The calendar shows who and what is already placed, so nobody reaches site to find a roller missing.

Traffic control and closures

Traffic control is a booking too. Lane closures, signs and the traffic control crew are placed on the shift with the hours agreed with the client. If a closure falls through, the bookings that depend on it are visible beside it.

The asphalt plant production slot

Asphalt has to be ordered. The plant’s production slot is recorded against the shift with the mix and the tonnage asked for. Without it a shift cannot be laid sensibly, so the slot sits beside the crew.

Hold reason and new date

Every hold has a reason. Rain or a closure is recorded with the date work stopped, and the new date is set. Later, the office can see why a section slipped and which bookings the hold moved.

A paving shift from booking to hold

A shift is planned days ahead and changed hours before. These moments show how planners, foremen and the yard use the booking, from the Friday spent filling next week to the morning a forecast goes wrong. Plans are meant to move.

Filling next week on Friday

Friday is for next week. Planning begins with a car park resurface and a rural road overlay, and crews and machines are picked for each. A tipper wanted on both days is seen on the calendar before the yard hears of it.

Rain forecast on the morning

Rain arrives before the first truck. Marking the shift held is one action, and a new date is picked. Crew, machines and traffic control booked to it all move together, and each affected foreman sees the change.

Foreman opens the day’s shift

At the yard gate, the foreman opens today’s shift. It lists the section, the crew, the machines and the plant slot. Nobody rings the office to ask who is on which roller. The answer is already there.

A council cancels the closure

A closure is withdrawn at short notice. Shifts that depended on it are found and moved as a group, and the foremen concerned see the change. Traffic control is re-booked for the next date the road can be shut.

Who sees shifts and what changes for them

The same booking is read by four kinds of person, and each looks for something different. Owners want the week at a glance. Foremen want their own day. Each person sees the shifts that concern them.

Owners see the week and holds

Owners watch the week. They see which shifts are planned, which are held and how crews and machines booked compare with hours worked. A week of holds shows in the totals before it shows in cash.

Planners and foremen move bookings

Planners build the plan. Foremen read their own shifts and record the day from a phone. When a shift is held, the planner re-plans it, and the foreman sees the new date on the same screen.

Plant managers watch machine bookings

Plant managers see where each machine is booked. A paver due for servicing is easy to spot against the plan. They can ask the planner to move a shift before the machine is needed on the road.

The office reads the reasons

Reasons are kept. A client’s surveyor asks why a stretch was late. The office opens the held shifts for that section and reads the recorded cause and the new date.

Decisions to settle before shifts are booked

Planning only works if everyone agrees how the plan is changed. Settle four things first. They take one workshop with the planner, a foreman and the plant manager, and the answers are written down.

Who may move a booking for Shift planning and weather holds

Agree who edits shifts. Letting only planners move a booking keeps the plan steady. Foremen can ask for a change by phone, and the planner records it, so two people do not move the same shift.

What the plan leaves out for Shift planning and weather holds

Hired haulage and line marking subcontractors have their own order records, so the shift may only carry a reference. Leave out anything the yard already controls elsewhere in its own records.

How open jobs come across for Shift planning and weather holds

Open jobs come across. Live jobs are carried over from your spreadsheets and job files. Decide which future shifts are keyed in on day one. Past shifts are optional, and the plan works fine without them.

Which report to read first for Shift planning and weather holds

Start with shift crews and machines booked against hours worked. It shows whether the plan matches the days actually laid, and it is the quickest check that crews were booked sensibly.

How shift planning hands work onward

A booking is the first record of a working day. Nearly everything else on site is attached to it. Dockets, hours and stock all name the shift. These links show what the plan gives to other features and what it takes back. Each link keeps the shift attached to the work done under it.

  • Bookings name the section so dockets land on it
  • Crew bookings become timesheets once hours are logged
  • Machine bookings feed plant hours and servicing due dates
  • Emulsion and aggregate are issued to the shift booked
  • Hired roller and haulage orders attach to the shift

Where shift planning stops

The planner decides when to hold a shift. This feature records the decision and moves the bookings. It does not forecast the weather, and it does not tell anyone to stop work. Safety on site stays with the foreman and the site manager. Operator pay and working hours rules stay with payroll and the owner’s adviser. A firm with one crew and one roller can plan on a whiteboard.

FAQ

Frequently asked questions

Does a held shift keep its reason on record?

It does. The reason is recorded. Rain, a closure or another cause is picked when marking the hold. The new date stays on the shift, so a later query about delay is answered from the record.

Can I see which machines are free on a date?

Open the plan for that date. Each paver, roller and tipper already booked is listed against its shift. Machines not listed are free to book, apart from servicing due dates shown on the machine record.

What happens to a hired roller when a shift moves?

The hire order is its own record. The hire booking sits against the shift that moved. The office can then confirm the new date with the supplier before the roller is due to arrive on site.

Is the plant production slot part of the booking?

Yes, it sits with the shift. The planner records the slot, the mix and the tonnage asked for, so the plant knows what to make. If the shift is held, the slot is shown as needing a new date.

Do held shifts count in the hours reports?

Not as worked hours. A held shift keeps its booking, but hours are logged only when a crew works them. The report then shows booked time beside the hours actually laid. Held days stay visible to the owner.

Where it fits

How this feature fits the system.

Paving and Road Construction Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Tenders and estimates

Tenders are priced from the firm’s own rates per square metre, tonne and linear metre, with each revision and the final tender result kept.

Estimate/Quotation Management

Shift planning and weather holds

Shifts sit on a calendar with their crews, machines and traffic control, so a held shift visibly moves the dependent bookings after it.

Project Timelines with Gantt Charts

Plant dockets and tonnage

Every asphalt docket is entered as it arrives, with weight, mix and truck, and checked against what the foreman reports as laid.

Goods Receipt (GRN)
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements