Shift planning and weather holds for paving
Shift planning books crews, paver, rollers, tippers and traffic control for each shift on a road job, with the asphalt plant’s production slot beside them. When rain or a closure stops work, the planner moves the booking in one step. Foremen see the change on their phones.
What a paving shift booking records
A shift booking is a short record with a great deal attached to it. It names the job, the section and the date, then lists everyone and everything the shift needs. Planners read it as a list. Foremen read it as the day’s instructions.
A paving shift from booking to hold
A shift is planned days ahead and changed hours before. These moments show how planners, foremen and the yard use the booking, from the Friday spent filling next week to the morning a forecast goes wrong. Plans are meant to move.
Who sees shifts and what changes for them
The same booking is read by four kinds of person, and each looks for something different. Owners want the week at a glance. Foremen want their own day. Each person sees the shifts that concern them.
Decisions to settle before shifts are booked
Planning only works if everyone agrees how the plan is changed. Settle four things first. They take one workshop with the planner, a foreman and the plant manager, and the answers are written down.
How shift planning hands work onward
A booking is the first record of a working day. Nearly everything else on site is attached to it. Dockets, hours and stock all name the shift. These links show what the plan gives to other features and what it takes back. Each link keeps the shift attached to the work done under it.
- Bookings name the section so dockets land on it
- Crew bookings become timesheets once hours are logged
- Machine bookings feed plant hours and servicing due dates
- Emulsion and aggregate are issued to the shift booked
- Hired roller and haulage orders attach to the shift
Where shift planning stops
The planner decides when to hold a shift. This feature records the decision and moves the bookings. It does not forecast the weather, and it does not tell anyone to stop work. Safety on site stays with the foreman and the site manager. Operator pay and working hours rules stay with payroll and the owner’s adviser. A firm with one crew and one roller can plan on a whiteboard.
Frequently asked questions
Does a held shift keep its reason on record?
It does. The reason is recorded. Rain, a closure or another cause is picked when marking the hold. The new date stays on the shift, so a later query about delay is answered from the record.
Can I see which machines are free on a date?
Open the plan for that date. Each paver, roller and tipper already booked is listed against its shift. Machines not listed are free to book, apart from servicing due dates shown on the machine record.
What happens to a hired roller when a shift moves?
The hire order is its own record. The hire booking sits against the shift that moved. The office can then confirm the new date with the supplier before the roller is due to arrive on site.
Is the plant production slot part of the booking?
Yes, it sits with the shift. The planner records the slot, the mix and the tonnage asked for, so the plant knows what to make. If the shift is held, the slot is shown as needing a new date.
Do held shifts count in the hours reports?
Not as worked hours. A held shift keeps its booking, but hours are logged only when a crew works them. The report then shows booked time beside the hours actually laid. Held days stay visible to the owner.
How this feature fits the system.
Paving and Road Construction Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Tenders and estimates
Tenders are priced from the firm’s own rates per square metre, tonne and linear metre, with each revision and the final tender result kept.
Estimate/Quotation ManagementShift planning and weather holds
Shifts sit on a calendar with their crews, machines and traffic control, so a held shift visibly moves the dependent bookings after it.
Project Timelines with Gantt ChartsPlant dockets and tonnage
Every asphalt docket is entered as it arrives, with weight, mix and truck, and checked against what the foreman reports as laid.
Goods Receipt (GRN)Tell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements