Tenders and estimates for road paving firms
Tenders and estimates is where a paving firm prices a road job before it exists. Estimators measure area, depth, tonne and length, then build each pay item from the firm’s own material, plant, labour and traffic control rates. Every revision is kept, and owners read results against bids won and lost.
What a road tender record keeps
A tender record holds the priced job as the client invited it, plus the working behind each figure. Estimators open one record and find the pay items, measured quantities, rates and revisions in order. Drawings and addenda are referred to on the same record. Each tender is one record.
Pricing a tender before the bid closes
Every tender has a deadline, and the estimating office works against it. These moments show where the record is opened between the invitation arriving and the bid going out. Rates must be ready when the drawings land. Bids close fast.
Who sees a tender and which figures
Margins and rates are sensitive, so each role opens a different view. The tender record shows each person what the bid needs from them and hides the rest. Role decides what opens.
Decisions to settle before tenders go in
Before estimators start, a few choices need agreeing. They decide who may change a rate, what a tender leaves out and which old bids come across. Settle these in the first workshop with the owner present.
How tenders connect to the rest of the product
This record is the start of the job, not a separate file. Rates come in from plant and crew records, and a won tender hands its items onward. These links show what flows each way, and where the estimator’s figures are read again. Nothing is retyped.
- A won tender becomes a job split into sections
- Pay items return as measured lines on stage claims
- Machine hourly rates come from plant servicing and fuel
- Crew rates match those used on shift timesheets
- Hire rates draw on subcontractor and hired plant orders
Where tender pricing stops
This feature prices and records. It does not decide whether to bid, and it does not say what a fair margin is. Contract terms, bonds and tax treatment stay with the owner and the firm’s adviser. A firm quoting only a few small driveways a month can work from a quotation pad, and move to the system when tenders grow.
Frequently asked questions
Can I keep a tender open while rates change?
Yes. A tender keeps its own rates. If the price book moves, the estimator opens a new revision and reprices. The earlier revision stays exactly as it was submitted to the client, so disputes can be settled.
Does it work for term maintenance bids?
It prices a schedule of rates for term work as well as a measured job. Each item carries its unit and rate. Once a term contract is won, repair calls are billed against that schedule.
How do I compare a new tender with old ones?
Open past jobs of the same layer and mix beside the new tender. You see the rates, tonnage and area used, on each, and which bids were won. The comparison rests on records, not recollection.
Who decides which pay items a tender uses?
The firm does. Pay items are named as your estimators name them and loaded at set-up, before the first tender is priced. GullySystem staff can add or change an item on request, so the schedule follows the client’s documents.
Can foremen see the tender margin?
No. Foremen see only their own shifts and machines. Margins and rates open for the roles you choose, such as owners and estimators. Site staff are not shown figures meant for the office. Each login shows only what its role needs.
How this feature fits the system.
Paving and Road Construction Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Tenders and estimates
Tenders are priced from the firm’s own rates per square metre, tonne and linear metre, with each revision and the final tender result kept.
Estimate/Quotation ManagementShift planning and weather holds
Shifts sit on a calendar with their crews, machines and traffic control, so a held shift visibly moves the dependent bookings after it.
Project Timelines with Gantt ChartsPlant dockets and tonnage
Every asphalt docket is entered as it arrives, with weight, mix and truck, and checked against what the foreman reports as laid.
Goods Receipt (GRN)Tell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements