Plant servicing and fuel costing for paving

A paver or a roller earns its keep only if its running cost is known. This feature records servicing hours for pavers, rollers and screeds and the diesel drawn by each machine. Hours and fuel are then costed to the job and section the machine worked, so running cost no longer rests on guesswork.

What a machine record keeps

Each paver, roller and screed has its own record. It collects hours worked, servicing done and diesel drawn over its life with the firm. The yard reads it as a history, and the office reads it as a cost.

Hours worked on each machine

Hours come from the shifts. Each shift records the hours a machine ran and the job it worked on. A roller that moved between sites during the week has its hours split correctly between them.

Servicing hours and due dates

Servicing is recorded against the machine’s hours. The date of each service, what was done and the hours at that point are entered. The record then shows when the next service falls due for that machine.

Diesel drawn by each machine

Fuel is entered against the machine that took it. Litres drawn, the date and the shift are recorded together. A thirsty paver stands out. So does a roller left idling, once its diesel is set against its hours worked.

Running cost reaching the job

Cost follows hours and diesel. The machine’s hourly rate carries them into job cost, section by section. Servicing due dates stay on the machine record, which is where the plant manager looks first, before booking a shift.

A paver’s servicing and fuel through a season

Machines are used hard and moved frequently. The record follows them from the yard to the road and back. Four moments show who adds to it. They run from the morning’s fuel draw to the day a roller is pulled in.

Diesel drawn at the yard tank

Before dawn, the operator fills the paver. The foreman or storeman enters the litres against that machine and the shift. The figure sits on the record straight away, not on a sheet in a cab.

A roller changes site

After lunch, a roller moves to a second job. Its hours are split between the two shifts. The diesel it drew follows the same split, so each job carries only what it used and no more.

A service falls due for Plant servicing and fuel

Servicing hours approach. Plant managers see that a machine is nearly due and ask the planner to keep it off a long shift. The service is booked, and it is recorded when it is done.

A breakdown is logged

A screed fails midshift. The foreman records the stoppage against the machine. Repair hours are added later by the plant manager. The job’s cost shows the delay, and the machine’s history shows the fault for next time.

Who watches the machines and who reads the cost

Machines are watched by the yard and costed by the office. Different roles read different parts of the same record. Each person sees what bears on a decision. Everyone shares one list of plant, but the screens differ.

Owners see which jobs carry cost

Owners see which jobs carry each machine’s cost. A machine that earns little against its running cost is clear to see. That informs whether to keep it, replace it or hire in a roller instead.

Estimators price from real running cost

Estimators price from real figures. They read what hours and diesel cost on earlier jobs, so machine rates in a tender are set from recorded costs. A rate loaded from guesswork is replaced by one with evidence behind it.

Planners and foremen draw and book

Foremen and planners work the day. Foremen enter diesel drawn and hours run from a phone. Planners see which machines are due for service before booking them. Neither has to ring the yard to ask what a machine has done.

Plant managers keep the history

Plant managers keep the history. They watch machine hours, servicing due dates and diesel drawn, and they see which jobs carry each machine’s cost. One record per machine replaces a sheet kept in a drawer at the yard.

Decisions to settle before machines are recorded

Machine records depend on a clean plant list. Settle four things before the first hour is logged. The plant manager leads, with the owner and the office present to confirm rates and what is counted.

Who may edit a machine record

Decide who can change hours, rates and service entries. Foremen enter hours and diesel. Only the plant manager or the office should alter a rate or a service date, and each change should leave a trace.

What the record leaves out for Plant servicing and fuel

Agree what stays outside. Tyres, parts and workshop labour may be costed elsewhere, or as one repair line. Writing the rule down keeps running cost comparable from one machine to the next, whoever enters it.

How the plant list comes across

Your plant list comes across. Machine rates and last service dates move from your spreadsheets, and you decide which machines are loaded first. A telematics feed can be added later, and it is priced separately from the rest.

Which report to read first for Plant servicing and fuel

Choose the first report. Begin with machine hours and diesel drawn by job. It shows how hard each machine is being used. That is also the quickest check that hours and fuel are being recorded each day on site.

How servicing and fuel connect to jobs

Machine records matter because their cost lands on jobs. Hours come from shifts, rates come from the plant list, and the cost joins the section’s account. These links show where the machine record gives and where it takes. Each hour is recorded once, by the foreman.

  • Shift bookings supply the hours each machine ran
  • Machine rates feed tender estimates for the next job
  • Crew timesheets name the operator on each machine
  • Hired plant orders cover machines the firm lacks
  • Machine cost reaches the section named on the shift

Where servicing and fuel records stop

The feature records and costs. It does not service a machine, check a fuel tank or tell a mechanic what to fix. Warranty terms and safety inspections stay with the plant manager and the manufacturer’s advice. Fuel supply prices stay as the supplier states them. A firm with two small rollers can keep a service book in the cab.

FAQ

Frequently asked questions

Is diesel drawn tracked per machine or per job?

Both are tracked. Each draw is entered against a machine and a shift. The machine record shows its own consumption. The shift carries the cost to the job and section it worked, so fuel lands where it was used.

How does a servicing due date show?

The date stays on the machine record. Hours the machine has run are read against it. The plant manager sees how close a service is before the planner books the machine onto a long shift.

Can machines on a telematics feed be read automatically?

A telematics feed can supply machine hours. That is added work, priced and agreed separately in the proposal. Until it is in place, hours are entered from the shift record by the foreman after laying.

What if a machine is shared between two jobs?

Time and diesel follow the shifts. If a roller works two jobs on one shift day, each shift carries its own hours and its own share of fuel. Neither job is charged for the other’s time.

Who sees machine running costs?

Owners, estimators and plant managers see rates and running cost. Site staff are not shown the figures meant for the office. Each login opens only what its role needs. A foreman sees the machines on the shifts assigned.

Where it fits

How this feature fits the system.

Paving and Road Construction Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Tenders and estimates

Tenders are priced from the firm’s own rates per square metre, tonne and linear metre, with each revision and the final tender result kept.

Estimate/Quotation Management

Shift planning and weather holds

Shifts sit on a calendar with their crews, machines and traffic control, so a held shift visibly moves the dependent bookings after it.

Project Timelines with Gantt Charts

Plant dockets and tonnage

Every asphalt docket is entered as it arrives, with weight, mix and truck, and checked against what the foreman reports as laid.

Goods Receipt (GRN)
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements