Plant servicing and fuel costing for paving
A paver or a roller earns its keep only if its running cost is known. This feature records servicing hours for pavers, rollers and screeds and the diesel drawn by each machine. Hours and fuel are then costed to the job and section the machine worked, so running cost no longer rests on guesswork.
What a machine record keeps
Each paver, roller and screed has its own record. It collects hours worked, servicing done and diesel drawn over its life with the firm. The yard reads it as a history, and the office reads it as a cost.
A paver’s servicing and fuel through a season
Machines are used hard and moved frequently. The record follows them from the yard to the road and back. Four moments show who adds to it. They run from the morning’s fuel draw to the day a roller is pulled in.
Who watches the machines and who reads the cost
Machines are watched by the yard and costed by the office. Different roles read different parts of the same record. Each person sees what bears on a decision. Everyone shares one list of plant, but the screens differ.
Decisions to settle before machines are recorded
Machine records depend on a clean plant list. Settle four things before the first hour is logged. The plant manager leads, with the owner and the office present to confirm rates and what is counted.
How servicing and fuel connect to jobs
Machine records matter because their cost lands on jobs. Hours come from shifts, rates come from the plant list, and the cost joins the section’s account. These links show where the machine record gives and where it takes. Each hour is recorded once, by the foreman.
- Shift bookings supply the hours each machine ran
- Machine rates feed tender estimates for the next job
- Crew timesheets name the operator on each machine
- Hired plant orders cover machines the firm lacks
- Machine cost reaches the section named on the shift
Where servicing and fuel records stop
The feature records and costs. It does not service a machine, check a fuel tank or tell a mechanic what to fix. Warranty terms and safety inspections stay with the plant manager and the manufacturer’s advice. Fuel supply prices stay as the supplier states them. A firm with two small rollers can keep a service book in the cab.
Frequently asked questions
Is diesel drawn tracked per machine or per job?
Both are tracked. Each draw is entered against a machine and a shift. The machine record shows its own consumption. The shift carries the cost to the job and section it worked, so fuel lands where it was used.
How does a servicing due date show?
The date stays on the machine record. Hours the machine has run are read against it. The plant manager sees how close a service is before the planner books the machine onto a long shift.
Can machines on a telematics feed be read automatically?
A telematics feed can supply machine hours. That is added work, priced and agreed separately in the proposal. Until it is in place, hours are entered from the shift record by the foreman after laying.
What if a machine is shared between two jobs?
Time and diesel follow the shifts. If a roller works two jobs on one shift day, each shift carries its own hours and its own share of fuel. Neither job is charged for the other’s time.
Who sees machine running costs?
Owners, estimators and plant managers see rates and running cost. Site staff are not shown the figures meant for the office. Each login opens only what its role needs. A foreman sees the machines on the shifts assigned.
How this feature fits the system.
Paving and Road Construction Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Tenders and estimates
Tenders are priced from the firm’s own rates per square metre, tonne and linear metre, with each revision and the final tender result kept.
Estimate/Quotation ManagementShift planning and weather holds
Shifts sit on a calendar with their crews, machines and traffic control, so a held shift visibly moves the dependent bookings after it.
Project Timelines with Gantt ChartsPlant dockets and tonnage
Every asphalt docket is entered as it arrives, with weight, mix and truck, and checked against what the foreman reports as laid.
Goods Receipt (GRN)Tell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements