Subcontractors and hired plant for road work
A paving firm hires in rollers, haulage, line marking and traffic control whenever its own crews and machines run short. This feature records each order and matches every hire ticket to it. Any difference is raised before the supplier is paid, so the firm pays for what arrived and nothing else.
What a hire order and ticket record
Hired plant is a promise on paper before it is a cost. Orders state what was asked for, and a ticket proves what turned up. Between them sit the supplier, the job and the rate. Both documents are kept on one record.
Hiring in a roller, haulier or marking crew
Outside help is booked in a hurry and checked in a hurry. Four moments follow hired plant through a busy job. They run from the call that books it to the invoice cleared at month end.
Who orders, who checks and who approves
Ordering, receiving and paying are kept in different hands, yet the same record serves all three jobs. Each role sees the steps that belong to it. Separating the duties makes errors easier to spot.
Decisions to settle before orders are placed
A firm that hires regularly needs clear rules on who may commit its money. Settle them before the first order goes out. The owner, the planner and the office manager can agree them in one sitting.
How hire records link to other features
Hired plant touches the shift, the section and the supplier’s account. Starting from a booking, each hire ends as cost on a job. These links show where the hire record gives and where it takes. Each ticket is matched once. Nobody keys it a second time.
- Shift bookings state which hired machines and crews attend
- Haulage tickets are compared with plant docket weights
- Hire cost is charged to the section worked
- Own plant hours show where hiring replaced a machine
- Approved invoices pass to accounting software by export
Where subcontractor records stop
The feature orders, matches and flags. It does not choose a supplier, negotiate a rate or pay an invoice. Contract terms with subcontractors and any insurance or licence checks stay with the owner and the firm’s adviser. Third-party fees are what the supplier states. A firm that hires a roller twice a year can manage with a purchase order book.
Frequently asked questions
Can a ticket be held when it has no order?
It can. The ticket is entered and marked unmatched. The office then asks the planner who booked it. Payment waits until an order is found or the ticket is rejected, and either outcome is recorded.
How are haulage loads checked against dockets?
Each haulier’s ticket lists loads. Those loads are read against the asphalt dockets already entered. A load that appears on a ticket but not on a docket is queried with the haulier before payment is made.
Can I see what I owe suppliers for hired plant?
Orders and tickets without a matched invoice show as committed. Invoices approved but unpaid show as owed. The two lists together tell the owner what the hired plant on a job has cost so far.
Does it handle line marking by a specialist crew?
Specialists are covered. Specialist crews are ordered and matched like any other supplier. The order names the section, and the ticket records what was marked. Traffic control crews are handled in the same way, with their own order lines.
Are subcontractor rates visible to foremen?
They are not. Foremen see the orders for their own shifts and key tickets. Rates and invoice figures open only for the roles you choose, so site staff are never shown supplier prices they have no need of.
How this feature fits the system.
Paving and Road Construction Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Tenders and estimates
Tenders are priced from the firm’s own rates per square metre, tonne and linear metre, with each revision and the final tender result kept.
Estimate/Quotation ManagementShift planning and weather holds
Shifts sit on a calendar with their crews, machines and traffic control, so a held shift visibly moves the dependent bookings after it.
Project Timelines with Gantt ChartsPlant dockets and tonnage
Every asphalt docket is entered as it arrives, with weight, mix and truck, and checked against what the foreman reports as laid.
Goods Receipt (GRN)Tell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements