Defects and repair calls for road maintenance
Roads fail after they are built, and someone has to put them right. This feature logs each pothole, failed joint or edge break as a numbered call on its section. A repair crew is assigned, and the material and time used are recorded. Every call stays open until the surface is made good.
What a road defect call records
Each call starts with a report and ends with a surface made good. In between it collects a section, a crew, a visit and a cost. One number holds all of it. Anyone can read the history of a stretch of road from there.
A repair call from report to closure
Defects arrive from clients, drivers and inspections, and not at convenient times. Four moments follow a pothole on a term maintenance contract. They run from the report that opens the call to the entry that closes it. Each has a person.
Who opens calls and who closes them
Several people touch each call, and the office, the planner, the crew and the surveyor each add a piece. Everything stays under one number. Role decides what each of them can change. Nobody edits another person’s entry.
Decisions to settle before calls are logged
How calls are opened and closed shapes every later report. Settle the rules before the first call is entered. Owner, planner and a foreman should agree them. Whoever deals with the client should join them.
How repair calls connect to other records
A repair call borrows from the build record and feeds the commercial one. Its section is the one first surfaced, its material comes from the yard and its cost reaches the job. These links show where it connects. Entries are made once. Nobody rekeys them.
- Each call sits on the section built under the job
- Repair crews are booked through shift planning
- Patching material is issued from yard stock to the call
- Crew hours are recorded on timesheets and costed to calls
- Closed calls pass to claims under the schedule of rates
Where defect calls stop
The feature logs, assigns and records. It does not inspect a road, decide whether a defect is the firm’s responsibility or accept a warranty claim. Liability and defect period terms come from the contract and stay with the owner and the firm’s adviser. A firm that fixes a handful of potholes a year can use a notebook and a phone.
Frequently asked questions
Can calls be logged without a full address?
A section is needed. If the report gives a road name and a nearby landmark, the office picks the nearest section and adds a note. The position can be corrected after the crew has visited the site.
Does every call stay open until someone closes it?
It stays open. Closure happens only when someone enters it. In the meantime the call shows as open. The open list by age makes it easy to see which calls have waited longest for a crew.
How are repairs billed under a term contract?
Rates drive the billing. Repairs are billed under the contract’s schedule of rates. The closed call carries the material and time, so the surveyor builds the claim line from the call and the client’s surveyor can trace it.
Can a defect be linked to the original job?
It can be. The call sits on the section where the defect is. If that section was laid under a job in the system, the call, the original dockets and the tests can all be read together.
What does a repair crew see on a phone?
The crew sees its numbered calls for the day, each with its section and notes. After the repair, the foreman enters material and hours on the same screen. Nothing is written down twice. Nothing waits for the office.
How this feature fits the system.
Paving and Road Construction Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Tenders and estimates
Tenders are priced from the firm’s own rates per square metre, tonne and linear metre, with each revision and the final tender result kept.
Estimate/Quotation ManagementShift planning and weather holds
Shifts sit on a calendar with their crews, machines and traffic control, so a held shift visibly moves the dependent bookings after it.
Project Timelines with Gantt ChartsPlant dockets and tonnage
Every asphalt docket is entered as it arrives, with weight, mix and truck, and checked against what the foreman reports as laid.
Goods Receipt (GRN)Tell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements