Jobs, sections and chainages for road builders

This feature turns a won road tender into a job and divides the road into sections. Each section carries its chainage range, its layers, the specified mix and the quantity to be laid. Foremen, surveyors and the engineer then talk about the same stretch of road, and every record points to it.

What a road section record holds

A section is a stretch of road with a start chainage, an end chainage and a list of layers. Everything later is attached to it. Dockets, tests and claim lines all name a section, so the job reads as a map rather than a heap of papers.

Chainage range and location

Chainage comes first on every record. Every section opens with its start and end chainage. Location notes sit beside them, such as a junction, a lay-by or a bus stop, so a docket names its stretch.

Layers in the build-up

Layers are listed in order. Some sections carry a sub-base, a base course, a binder course and a wearing course. Each has its depth, so the thickness to be built is never left to memory.

Specified mix and quantity

Mix and quantity are fixed per layer. Every layer names its specified mix and the quantity expected. Tonnage and area come from the tender, so the allowance is already on the section when laying starts.

Status of each layer

Layers carry a status. Each shows whether it is waiting, being laid, laid or tested. Planners see which stretches are ready for the next course, and the engineer sees where work is still open or already accepted.

Sections through the life of a road job

A road job changes shape from award to final retention release. Sections give every stage a fixed point to refer to. Four moments show how people use them. They run in order. The first comes the day a tender is won.

Splitting a won tender

The tender is won on Friday. By Monday the estimator and planner split the road at agreed chainages. Pay items are shared out across the sections, so each stretch inherits its own allowance of tonnage.

A variation changes one stretch

A variation arrives. The client wants a thicker base on one length of the road near a junction. The planner edits that single section, and its quantity and layer depth change at once. Other sections stay as awarded.

Foreman picks the section on site

Standing at the start of the lay, the foreman picks the section on a phone. Docket numbers, areas and temperatures recorded that shift all fall onto it. No note is copied up later. Delays are recorded in the same way.

Engineer asks about a stretch

An engineer asks about one length of road. The office opens the section and shows the layers laid, the tests taken and the claim lines raised. The answer comes from one record, with no searching through files.

Who opens a section and what shows

Sections are read by the office and the site alike. Every role opens the same record but sees the part that bears on its own work. One section serves several readers.

Owners track progress by stretch

Progress is read by stretch. They see which sections are laid, which are waiting and how tonnage compares with allowance. A total that looks wrong opens down to the section behind it, so the cause is found on the road itself.

Estimators check allowances

Estimators check allowances. They look back at how sections of a similar layer and mix performed. Allowance against tonnage laid shows whether a rate was right, so the next tender is priced with real evidence.

Planners and foremen work by section

Planners book shifts against sections. Foremen open today’s stretch on a phone. It shows the layer, the mix to be laid and what earlier shifts recorded there. Delays and rain stops from earlier shifts are listed too.

Surveyors measure against sections

Measuring follows the road. Quantity surveyors measure completed work section by section, with levels and layers beside the figures. Each claim line then names its stretch, so the client’s surveyor can follow it to the dockets and tests behind it.

Decisions to settle before sections are cut

The way a road is divided affects every later record, so settle it early. Four decisions need an answer for this feature. They are best taken with the estimator, planner and surveyor in one room.

Who may change a section

Set the editing rule early. Decide who can move a chainage or edit a layer. Allowing only planners and the office keeps the record steady, while foremen record against sections without redrawing them on site.

What a section leaves out

Agree what is not a section. Temporary works, site setting-out and traffic management may sit at job level instead. Naming this stops the same cost being split across stretches in different ways by different people on different days.

How open jobs come across for jobs sections and chainages

Open jobs need care. Live jobs are carried over from the spreadsheets and job files you keep now. Decide the chainage breaks for each, and how much of the laid tonnage so far is entered against which section.

Which report matters first for jobs sections and chainages

Start with tonnage delivered against area and depth by section. It shows quickly whether the sections were cut sensibly, and where an allowance is running ahead of the road actually laid.

How sections hand work to other features

Every other record uses the section as its address. Without it, a docket is only a number. With it, the docket joins the right stretch of road. These links show what the section hands out and what it takes in from elsewhere. Each hand-off keeps the stretch of road attached.

  • Plant dockets add tonnage to the section being laid
  • Quality tests attach to the section and its layer
  • Shift bookings name the section due for laying
  • Stage claims measure completed work by section
  • Defect calls are logged against the section affected

Where sections and chainages stop

Sections organise records. They do not survey the road, set out levels or check that a design is sound. Setting-out stays with the site engineer, and the design stays with the client’s designer. Contract wording about what counts as a section is a matter for the owner and an adviser. A short private drive needs no sections at all.

FAQ

Frequently asked questions

Can one job have both chainage and area sections?

Both are supported. A section can be a length between two chainages, or a named area such as a car park bay. Both sit on one job and carry layers, mix and quantity in the same way.

What if the client redraws the sections mid-job?

Redrawing is allowed. The planner edits or splits the section from that point. Records already attached stay with the section they were taken on, so history is not rewritten. New dockets and tests go to the revised stretch.

Can sections be named to match the contract?

Names follow the contract. Section names and test points are set up to match the contract documents, as your client’s engineer writes them in the contract. GullySystem staff can adjust them on request when the contract changes.

How do layers differ between sections on one road?

Layers differ freely. Each section carries its own list of layers. A junction may have a thicker base than the straight beyond it, and a lay-by may skip the binder course. The build-up is stored per stretch.

Do foremen need to type chainages on site?

They pick the section from a list on the phone. They need a connection to save entries. Readings taken in a cutting or on a rural road are keyed once the crew is back in range.

Where it fits

How this feature fits the system.

Paving and Road Construction Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Tenders and estimates

Tenders are priced from the firm’s own rates per square metre, tonne and linear metre, with each revision and the final tender result kept.

Estimate/Quotation Management

Shift planning and weather holds

Shifts sit on a calendar with their crews, machines and traffic control, so a held shift visibly moves the dependent bookings after it.

Project Timelines with Gantt Charts

Plant dockets and tonnage

Every asphalt docket is entered as it arrives, with weight, mix and truck, and checked against what the foreman reports as laid.

Goods Receipt (GRN)
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements