Crews, plant hours and timesheets for paving
This feature puts named people on named machines for each shift, then records the hours they worked. Paver, roller and tipper operators and labourers are costed to the job and section they laid. Foremen enter hours from a phone, and owners and plant managers read them against what was booked.
What a paving crew timesheet keeps
A timesheet line joins a person, a machine, a shift and a number of hours. That small record is the basis of labour cost on a road job. Planners see who was booked. Foremen record who actually worked, and the difference is visible.
Crew hours through a working paving week
People and machines move between sites across a week. The timesheet follows them, one shift after another. These moments show who touches the record. They run from the gate at dawn to the evening the hours are checked by the office.
Who sees crew hours and what they decide
Hours touch pay, so the screens are kept narrow. Foremen see their own crews, while the office sees every crew. Different people read the same entries for different reasons.
Decisions to settle before hours are recorded
Pay rules decide how hours turn into cost, so settle them first. Four questions come before the first timesheet. The answers need the owner, a foreman and whoever runs payroll.
How crew hours connect to other records
Cost attaches to a section, and other features read it from there. Machine hours lead into servicing, and labour cost joins material cost. These links show which records feed the timesheet and which read from it. Each entry is made once. The foreman or planner makes it on the shift.
- Shift bookings supply the crew and machine lists
- Machine hours carry on to servicing due dates
- Labour cost reaches the section named on each shift
- Tender labour rates are read against hours actually spent
- Hired crews appear as subcontractor orders, not timesheet lines
Where crew timesheets stop
The feature records hours and costs them. It does not run payroll, issue pay slips or work out statutory deductions. Those stay with the firm’s payroll process and its accountant. Rules about working time and rest breaks belong to the owner and an adviser. A firm with a single crew and a handful of jobs can keep a paper time book.
Frequently asked questions
Can one operator be split across two jobs?
Yes, one person can. Hours are split between the two shifts, and each job carries its own share. Both entries name the same person and machine, so the day still adds up to the total worked.
Are machine hours recorded separately from operator hours?
They are linked but recorded apart. A machine line has its own hours and rate, and its operator’s line has pay hours. A roller can run while a crew changes, so the two may differ.
Can overtime rules differ between crews?
Yes, if your yard uses different rules. Operator pay rules and overtime are loaded at set-up as your payroll applies them, so each crew’s hours turn into cost on its own terms. Rules differ by crew.
Does it connect to a telematics feed?
A telematics feed is added work. Machine hours can then be read from the machine itself rather than keyed by hand. The feed is priced and agreed separately in the proposal, after the basic timesheets are running.
What can a foreman change after the shift?
Corrections are allowed until the office approves the sheet. After approval, only the office changes it. Each change leaves a trace. This keeps the hours sent to payroll in step with job cost, whoever made the edit.
How this feature fits the system.
Paving and Road Construction Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.
Tenders and estimates
Tenders are priced from the firm’s own rates per square metre, tonne and linear metre, with each revision and the final tender result kept.
Estimate/Quotation ManagementShift planning and weather holds
Shifts sit on a calendar with their crews, machines and traffic control, so a held shift visibly moves the dependent bookings after it.
Project Timelines with Gantt ChartsPlant dockets and tonnage
Every asphalt docket is entered as it arrives, with weight, mix and truck, and checked against what the foreman reports as laid.
Goods Receipt (GRN)Tell us what you need.
Tell us what your team does today, where work gets stuck and what you want to change.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.