Crews, plant hours and timesheets for paving

This feature puts named people on named machines for each shift, then records the hours they worked. Paver, roller and tipper operators and labourers are costed to the job and section they laid. Foremen enter hours from a phone, and owners and plant managers read them against what was booked.

What a paving crew timesheet keeps

A timesheet line joins a person, a machine, a shift and a number of hours. That small record is the basis of labour cost on a road job. Planners see who was booked. Foremen record who actually worked, and the difference is visible.

Who worked which shift

Names come from the booking. Each shift lists its operators and labourers, so the foreman starts the day from the plan. Anyone who swaps in or drops out is changed on the same record, with the reason.

Hours and overtime by person

Hours are entered per person. Start, finish and breaks are recorded, and overtime follows the rules your yard and payroll use today. The record shows what was worked on the day, not only what was planned.

Machine hours by operator

Each machine line carries its operator. A roller logged for a set number of hours sits beside its crew, so plant hours and labour hours come from one entry. Nothing is keyed twice for the same machine.

Cost to the job and section

Hours become cost. Pay rates and machine rates are applied to what was recorded, and the result is charged to the section worked. Labour is no longer spread over jobs by guesswork at month end.

Crew hours through a working paving week

People and machines move between sites across a week. The timesheet follows them, one shift after another. These moments show who touches the record. They run from the gate at dawn to the evening the hours are checked by the office.

Sign-on at the yard

Crews gather at the yard. Opening the shift shows who is booked on the paver, the rollers and the tippers. Absences are marked at that point, so a short crew is known before the first truck leaves.

A roller changes site midday

After lunch, one roller moves to a second site. Its operator’s hours are split between the two jobs, and each job is charged for the time it used. Splitting by guess is replaced by recorded times.

Closing the shift on a phone

Laying has ended. Each person’s finishing time goes in, with any delay such as waiting for a late truck. Weather and breakdown delays are noted too, so the hours and the reasons for them stay together.

Office checks the week

On Friday the office reads hours by crew. Overtime is costed by the pay rule loaded at set-up, so the sheet shows what each crew cost. Queries go back to the foreman while the week is still fresh in mind.

Who sees crew hours and what they decide

Hours touch pay, so the screens are kept narrow. Foremen see their own crews, while the office sees every crew. Different people read the same entries for different reasons.

Owners compare booked and worked

Owners compare booked and worked. They read shift crews and machines booked against hours worked, and a gap is a question for the planner. Cost per section shows which stretch absorbed the heaviest labour, and it opens down to shifts.

Foremen enter hours for their crew

Entry is by the person in charge. A foreman records the day for the people supervised and sees only their own shifts. Corrections the same evening are simple, because every person and machine is already listed.

Plant managers read machine hours

Plant managers read machine hours. They watch the hours on each paver, roller and screed. A machine used longer than booked is easy to spot, and servicing due dates are read against those same hours.

The office prepares pay and cost

The office prepares pay and cost. It reviews hours and applies the firm’s pay rules, and hours reach payroll through the firm’s own process. Job cost reads the same entries, so the two figures do not disagree.

Decisions to settle before hours are recorded

Pay rules decide how hours turn into cost, so settle them first. Four questions come before the first timesheet. The answers need the owner, a foreman and whoever runs payroll.

Who may change hours

Agree who can edit a finished sheet. Foremen enter hours, and the office approves them. Later changes should leave a trace. Without this rule, a sheet that went to payroll can quietly differ from job cost.

What the sheet leaves out for crews plant and timesheets

Decide what stays outside. Pay slips, leave balances and statutory deductions remain with payroll. The timesheet carries hours and rates only. A shorter record is easier for foremen to complete on a phone at the end of a shift.

How crew lists come across for crews plant and timesheets

Crew lists and rates move from your spreadsheets. Check each operator’s machine ticket against the plant list. Pay rules and overtime follow how your yard and payroll work today, and they are loaded once at set-up.

Which report matters first for crews plant and timesheets

Pick one report first. Begin with shift crews and machines booked against hours worked. It shows at once whether crews are planned realistically and whether foremen are recording hours on the day itself, not later.

How crew hours connect to other records

Cost attaches to a section, and other features read it from there. Machine hours lead into servicing, and labour cost joins material cost. These links show which records feed the timesheet and which read from it. Each entry is made once. The foreman or planner makes it on the shift.

  • Shift bookings supply the crew and machine lists
  • Machine hours carry on to servicing due dates
  • Labour cost reaches the section named on each shift
  • Tender labour rates are read against hours actually spent
  • Hired crews appear as subcontractor orders, not timesheet lines

Where crew timesheets stop

The feature records hours and costs them. It does not run payroll, issue pay slips or work out statutory deductions. Those stay with the firm’s payroll process and its accountant. Rules about working time and rest breaks belong to the owner and an adviser. A firm with a single crew and a handful of jobs can keep a paper time book.

FAQ

Frequently asked questions

Can one operator be split across two jobs?

Yes, one person can. Hours are split between the two shifts, and each job carries its own share. Both entries name the same person and machine, so the day still adds up to the total worked.

Are machine hours recorded separately from operator hours?

They are linked but recorded apart. A machine line has its own hours and rate, and its operator’s line has pay hours. A roller can run while a crew changes, so the two may differ.

Can overtime rules differ between crews?

Yes, if your yard uses different rules. Operator pay rules and overtime are loaded at set-up as your payroll applies them, so each crew’s hours turn into cost on its own terms. Rules differ by crew.

Does it connect to a telematics feed?

A telematics feed is added work. Machine hours can then be read from the machine itself rather than keyed by hand. The feed is priced and agreed separately in the proposal, after the basic timesheets are running.

What can a foreman change after the shift?

Corrections are allowed until the office approves the sheet. After approval, only the office changes it. Each change leaves a trace. This keeps the hours sent to payroll in step with job cost, whoever made the edit.

Where it fits

How this feature fits the system.

Paving and Road Construction Management Software: the parts that work with this feature, the trades that use it and the ways to put it in place.

Tenders and estimates

Tenders are priced from the firm’s own rates per square metre, tonne and linear metre, with each revision and the final tender result kept.

Estimate/Quotation Management

Shift planning and weather holds

Shifts sit on a calendar with their crews, machines and traffic control, so a held shift visibly moves the dependent bookings after it.

Project Timelines with Gantt Charts

Plant dockets and tonnage

Every asphalt docket is entered as it arrives, with weight, mix and truck, and checked against what the foreman reports as laid.

Goods Receipt (GRN)
Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements