Skip to main content
GullySystem
Requirements checklist

What to ask for when choosing software for food processing machinery manufacturers.

A checklist built from how food processing machinery manufacturers work, to print or save as a PDF and bring to any supplier meeting.

Share your requirements

What the software should cover

Tick each one that matters to your business.

  • Hygienic machine quotations
  • Stainless material and heat records
  • Weld, finish and passivation checks
  • Build stages and bought-in parts
  • Factory acceptance tests
  • Commissioning and spares

Roles that need their own access

Who logs in, and what each person may see or change.

  • For sales engineers
  • For design and drawing office
  • For fabrication and assembly leads
  • For quality engineers
  • For service and spares staff

Reports to ask for

Ask to see each one with your own sample data.

  • Machines now in each bay, by stage
  • Sheet and tube drawn for each machine, by heat number
  • Open, won and lost quotations, split by product handled
  • Acceptance tests booked, passed or waiting for sign-off
  • Bought-in drives and panels still to arrive
  • Spares quoted and supplied, split by machine age
  • Commissioning visits scheduled by site

Systems it may need to connect to

Note which ones you already run.

  • Email
  • WhatsApp
  • Accounting export
  • Drawing file links
  • Payment gateway

Questions for any vendor

Put these to every supplier you are comparing.

  • Does it handle machines built to a buyer’s own drawing?
  • Can we quote the same mixer with different options?
  • How are sheet heat numbers linked to the vessel?
  • Where do the weld and passivation checks go?
  • Can a buyer watch the factory test?
  • What does it do after the machine is installed?
  • Can we move our existing machine and spares records in?
  • What decides the cost?

Where the work usually breaks today

Circle the ones you recognise. They set the order of the project.

  • Sheet certificates are separated from the machine
  • Weld and finish checks live on paper
  • Options multiply between quote and build
  • Acceptance tests are scattered
  • Spares requests lack a machine history

Prefer to talk it through? See the food processing machinery manufacturers page.