What to ask for when choosing software for food processing machinery manufacturers.
A checklist built from how food processing machinery manufacturers work, to print or save as a PDF and bring to any supplier meeting.
What the software should cover
Tick each one that matters to your business.
- Hygienic machine quotations
- Stainless material and heat records
- Weld, finish and passivation checks
- Build stages and bought-in parts
- Factory acceptance tests
- Commissioning and spares
Roles that need their own access
Who logs in, and what each person may see or change.
- For sales engineers
- For design and drawing office
- For fabrication and assembly leads
- For quality engineers
- For service and spares staff
Reports to ask for
Ask to see each one with your own sample data.
- Machines now in each bay, by stage
- Sheet and tube drawn for each machine, by heat number
- Open, won and lost quotations, split by product handled
- Acceptance tests booked, passed or waiting for sign-off
- Bought-in drives and panels still to arrive
- Spares quoted and supplied, split by machine age
- Commissioning visits scheduled by site
Systems it may need to connect to
Note which ones you already run.
- Accounting export
- Drawing file links
- Payment gateway
Questions for any vendor
Put these to every supplier you are comparing.
- Does it handle machines built to a buyer’s own drawing?
- Can we quote the same mixer with different options?
- How are sheet heat numbers linked to the vessel?
- Where do the weld and passivation checks go?
- Can a buyer watch the factory test?
- What does it do after the machine is installed?
- Can we move our existing machine and spares records in?
- What decides the cost?
- How soon could the fabrication bays work from it?
- What should the works team prepare in advance?
- How soon could the fabrication bays rely on it?
- What do the fabrication leads need to assemble?
Where the work usually breaks today
Circle the ones you recognise. They set the order of the project.
- Sheet certificates are separated from the machine
- Weld and finish checks live on paper
- Options multiply between quote and build
- Acceptance tests are scattered
- Spares requests lack a machine history
Check the difficult cases before choosing software.
Use examples from your own records to test the workflows that matter in your business.
Hygienic machine quotations
Which assumptions stop being valid when the quotation changes?
For “Hygienic machine quotations”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.
Background reading: ERPNext: quotation terms
Prefer to talk it through? See the food processing machinery manufacturers page.
