What to ask for when choosing software for granite and stone quarries.
A checklist built from how granite and stone quarries work, to print or save as a PDF and bring to any supplier meeting.
What the software should cover
Tick each one that matters to your business.
- Bench plan and blasting log
- Block register
- Grading and inspection notes
- Yard bays and crushed stone stock
- Machine hours and diesel
- Dispatch, orders and invoices
- Lease, permit and royalty dates
Roles that need their own access
Who logs in, and what each person may see or change.
- For the quarry owner
- For quarry managers
- For blaster and drill crew
- For yard supervisors and inspectors
- For weighbridge and accounts staff
Reports to ask for
Ask to see each one with your own sample data.
- Blocks cut by bench, grade and colour, with total volume
- Blast log with holes, charge and rock moved per bench
- Yard stock by bay, grade and size, unsold blocks oldest first
- Crushed stone stock and dispatch by size and day
- Diesel and machine hours by rig, saw, loader and crusher
- Buyer balances and dispatches with the oldest unpaid first
- Lease, permit and royalty dates falling due
Systems it may need to connect to
Note which ones you already run.
- Weighbridge
- SMS
- WhatsApp or other messaging
- Accounting export
Questions for any vendor
Put these to every supplier you are comparing.
- Can a buyer’s complaint about one block be traced to its blast?
- Does it work for both blocks and crushed stone?
- Who records the blast, and when?
- How are yard blocks found without walking the bays?
- Can machine cost be read per cubic metre?
- Can lease and royalty dates be set up?
- Do weighbridge tickets need re-entry for invoices?
- What happens to our existing block register?
- Is a quote available before we commit?
- If we ever stop, do our block records come with us?
- How soon can the quarry log blasts and blocks in it?
- What should the quarry bring before work begins?
Where the work usually breaks today
Circle the ones you recognise. They set the order of the project.
- A block number is lost between face and yard
- Blast records sit apart from output
- Grading differs between inspectors
- Machine hours and diesel are guessed
- Lease and royalty dates live on loose paper
Check the difficult cases before choosing software.
Use examples from your own records to test the workflows that matter in your business.
Dispatch, orders and invoices
Can a partial delivery be distinguished from a completed order?
For “Dispatch, orders and invoices”, follow an example that leaves in more than one trip. Compare the quantity handed over with the quantity still owed before closing the order.
Background reading: ERPNext: delivery notes
Grading and inspection notes
Who decides whether a failed result blocks the next step?
For “Grading and inspection notes”, bring an accepted result and a failed one. Agree who can authorise an exception and what evidence must accompany that decision.
Background reading: ERPNext: inspection criteria
Prefer to talk it through? See the granite and stone quarries page.
