What to ask for when choosing software for hospital furniture manufacturers.
A checklist built from how hospital furniture manufacturers work, to print or save as a PDF and bring to any supplier meeting.
What the software should cover
Tick each one that matters to your business.
- Tender schedules and quotations
- Cutting lists and frame jigs
- Coating and finish records
- Assembly and load checks
- Ward-wise packing and delivery
- Spares and warranty by serial
Roles that need their own access
Who logs in, and what each person may see or change.
- For the tender desk
- For fabrication and welding
- For coating and finishing
- For assembly and quality
- For dispatch
Reports to ask for
Ask to see each one with your own sample data.
- Tender lines supplied against ordered, by ward
- Frames in welding, coating and assembly
- Coating runs with colour and thickness readings
- Actuator and castor lots against bed serials
- Beds failing load or brake checks
- Ward drops packed and delivered
- Spares supplied by bed model and ward
Systems it may need to connect to
Note which ones you already run.
- SMS
- WhatsApp or other messaging
- Barcode and label printers
- Accounting export
Questions for any vendor
Put these to every supplier you are comparing.
- Can a multi-line tender be entered in one go?
- Does a serial follow the bed through coating?
- Can mattresses be matched with their beds?
- How are load and brake checks recorded?
- Can we see which wards still need beds?
- Can spare castors and hand controls be sold later?
- Where do actuator lot numbers come from?
- What does it cost?
- What happens to old tender records?
- Who looks after the system?
- How soon can the tender desk and workshop use it?
- What should the factory prepare before the start?
Where the work usually breaks today
Circle the ones you recognise. They set the order of the project.
- Tender lines each carry an item code
- Frames and actuators lose their link
- Coating runs are not tied to beds
- Part deliveries arrive by ward
- Spares after sale are quoted blind
Check the difficult cases before choosing software.
Use examples from your own records to test the workflows that matter in your business.
Tender schedules and quotations
Which assumptions stop being valid when the quotation changes?
For “Tender schedules and quotations”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.
Background reading: ERPNext: quotation terms
Spares and warranty by serial
What proves that a planned task was actually completed?
Select an overdue entry in “Spares and warranty by serial”. Ask which work record closes it and what remains visible when the visit is postponed or only part of the job is done.
Background reading: ERPNext: maintenance plans
Prefer to talk it through? See the hospital furniture manufacturers page.
