Skip to main content
GullySystem
Requirements checklist

What to ask for when choosing software for industrial electronics manufacturers.

A checklist built from how industrial electronics manufacturers work, to print or save as a PDF and bring to any supplier meeting.

Share your requirements

What the software should cover

Tick each one that matters to your business.

  • Product families and board revisions
  • Bill of materials with alternates
  • Assembly and test orders
  • Serial numbers and firmware builds
  • Component stock and end-of-life watch
  • Repairs and returns
  • Quotations and OEM orders

Roles that need their own access

Who logs in, and what each person may see or change.

  • For owners and the managing director
  • For design and test engineers
  • For production and the stores
  • For purchasing
  • For the support and repair desk

Reports to ask for

Ask to see each one with your own sample data.

  • Build orders by status, product family and promised date
  • Units by board revision and firmware build, with customer
  • Components flagged end of life, with stock and open orders affected
  • Burn-in and functional test failures by product and by cause
  • Repairs received, completed and pending, with parts and cost
  • Contract assembler receipts and defect counts
  • OEM and distributor orders open, with dues by customer

Systems it may need to connect to

Note which ones you already run.

  • Test bench result files
  • Barcode and label printers
  • Email
  • SMS or WhatsApp
  • Accounting export
  • Distributor price and stock files

Questions for any vendor

Put these to every supplier you are comparing.

  • Does it record the firmware version on each unit?
  • Can we see which products use a part that is being discontinued?
  • Will it read results from our existing test jigs?
  • How are boards built by an outside assembler handled?
  • Can a repair be linked to the original build?
  • How are engineering changes controlled?
  • Can distributors and OEMs see their own orders?
  • What happens to our current spreadsheets?
  • Can we take our records with us if we ever leave?

Where the work usually breaks today

Circle the ones you recognise. They set the order of the project.

  • Board and firmware revisions are not linked to serial numbers
  • End-of-life parts are found late
  • Burn-in and functional test data sit on the test bench
  • Engineering changes reach the floor unevenly
  • Repairs and warranty claims have no home

Prefer to talk it through? See the industrial electronics manufacturers page.