Skip to main content
GullySystem
Requirements checklist

What to ask for when choosing software for injection moulding companies.

A checklist built from how injection moulding companies work, to print or save as a PDF and bring to any supplier meeting.

Share your requirements

What the software should cover

Tick each one that matters to your business.

  • Mould register
  • Press schedule
  • Resin and regrind records
  • Shift production log
  • Approval shots and checks during the run
  • Secondary operations and dispatch

Roles that need their own access

Who logs in, and what each person may see or change.

  • For plant managers
  • For planners
  • For operators and setters
  • For toolroom staff
  • For quality inspectors

Reports to ask for

Ask to see each one with your own sample data.

  • Press utilisation and downtime by mould and shift
  • Moulds ranked by shots since last service
  • Quoted against actual cycle time by part
  • Reject types and rates by cavity and resin lot
  • Resin and regrind consumed against parts produced
  • Parts sent out and returned from secondary operations
  • Open customer schedules with delivery status

Systems it may need to connect to

Note which ones you already run.

  • Tablet entry at the press
  • Email
  • WhatsApp
  • Barcode label printer
  • Accounting export

Questions for any vendor

Put these to every supplier you are comparing.

  • Does it track the mould or only the press?
  • Can shot counts come straight from the machine?
  • How does it handle regrind?
  • Can it work for customer-owned moulds?
  • What about insert moulding and assemblies?
  • Can operators use it with gloves and a noisy floor?
  • Can records leave the system?
  • What does the demo and quotation look like?
  • Is training included for the floor?

Where the work usually breaks today

Circle the ones you recognise. They set the order of the project.

  • Shot counts live on the press
  • Material history missing from the part
  • Quoted cycle time drifts from actual
  • Mould changes eat the schedule
  • Rejects have no cause attached

Prefer to talk it through? See the injection moulding companies page.