What to ask for when choosing software for machinery manufacturers.

A checklist built from how machinery manufacturers work, to print or save as a PDF and bring to any supplier meeting.

Share your requirements

What the software should cover

Tick each one that matters to your business.

  • Project parts list with revisions
  • Work orders and job cards by stage
  • Delivery notes for machining
  • Assembly and FAT checklist
  • Installed base register
  • Service calls and service contracts
  • Spares and wear parts catalogue

Roles that need their own access

Who logs in, and what each person may see or change.

  • For owners
  • For production planners
  • For shop floor supervisors and operators
  • For stores and purchase staff
  • For accounts and dispatch

Reports to ask for

Ask to see each one with your own sample data.

  • Work orders still open, grouped by stage and promised week
  • Production by stage, machine and operator each shift
  • Material consumed against the bill of materials
  • Rejection and scrap by stage and reason
  • Job work out, returned and short, by job worker
  • Bar, sheet and resin stock against shortages
  • Dispatches and buyer outstanding by order

Systems it may need to connect to

Note which ones you already run.

  • WhatsApp
  • SMS
  • Email
  • Payment links and gateways
  • Accounting software export (quoted separately)
  • Barcode or label printers
  • Weighing scales
  • Biometric attendance devices

Questions for any vendor

Put these to every supplier you are comparing.

  • Can a bill of materials nest levels?
  • How is material issue tied to a work order?
  • Can we plan against machine capacity?
  • Does it give the cost of a batch?
  • Can rejections and scrap be counted stage by stage?
  • Does it track outside job work?
  • Can operators mark cards on a phone?
  • What about drawing revisions?
  • Will these figures go into my accounting package?
  • Do we need this with two machines?
  • How soon could the shop floor run job cards on it?
  • What does a factory prepare before the first meeting?

Where the work usually breaks today

Circle the ones you recognise. They set the order of the project.

  • One missing part holds up assembly
  • Design changes do not reach the shop floor
  • What was installed where is unknown
  • Spares and service contract revenue is left on the table

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

Project parts list with revisions

Which version applies to work that has already started?

Use a revised example from “Project parts list with revisions” during a scoped walkthrough. Identify work still using the earlier version before deciding which jobs should change.

Background reading: Odoo: controlled product changes

Work orders and job cards by stage

Is the plan based on demand that is still open?

Review “Work orders and job cards by stage” with an order that changes after planning. Check which material or capacity reservations need review before promising the revised completion date.

Background reading: ERPNext: production planning

Prefer to talk it through? See the machinery manufacturers page.