Skip to main content
GullySystem
Requirements checklist

What to ask for when choosing software for medical equipment manufacturers.

A checklist built from how medical equipment manufacturers work, to print or save as a PDF and bring to any supplier meeting.

Share your requirements

What the software should cover

Tick each one that matters to your business.

  • Product models and bills of materials
  • Serial numbers and build records
  • Production and sub-assembly orders
  • Final test and calibration
  • Installed base and installation
  • Service contracts and spare parts
  • Complaints and corrective action

Roles that need their own access

Who logs in, and what each person may see or change.

  • Owners and works heads
  • For production and test technicians
  • For installation and service engineers
  • For sales and tender teams
  • For quality and complaints staff

Reports to ask for

Ask to see each one with your own sample data.

  • Units by build stage and final test result
  • Installed base by model, ward and firmware version
  • Units containing a given component lot
  • Warranty and service contracts expiring soon
  • Complaints by model, alarm code and fault type
  • Spare part consumption by model
  • Orders due against promised delivery dates

Systems it may need to connect to

Note which ones you already run.

  • Email
  • WhatsApp or other messaging
  • Accounting export
  • Barcode labels
  • Test bench data export
  • Phone or tablet for engineers

Questions for any vendor

Put these to every supplier you are comparing.

  • Can I find all units that hold a replaced component?
  • Will it store test readings from our safety tester?
  • Can service engineers update firmware history?
  • How does warranty start?
  • Can tender quotations be tracked?
  • How are complaints linked to units?
  • Can spare parts be tied to a service visit?
  • How do we bring in units already in the field?
  • What shapes a quotation for a maker like us?
  • Who maintains test sheets after go-live?
  • What determines the lead-in before serial builds are recorded?
  • What should engineering and service have ready?

Where the work usually breaks today

Circle the ones you recognise. They set the order of the project.

  • Serial numbers do not link to components
  • Test reports sit in separate files
  • Firmware versions drift in the field
  • Installation and warranty dates are scattered
  • Complaints are not tied to the unit

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

Serial numbers and build records

Can you follow a suspect input through to the affected deliveries?

Pick one real record from “Serial numbers and build records”. Ask the team to trace its origin and identify the later work or deliveries it affected, including any split quantities.

Background reading: ERPNext: forward and backward traceability

Test reports sit in separate files

What does one row mean before totals are combined?

Choose one period in “Test reports sit in separate files” and compare it with the source records. Define the date basis and grouping before accepting a total that combines several kinds of entry.

Background reading: Microsoft: reporting grain and relationships

Prefer to talk it through? See the medical equipment manufacturers page.