Skip to main content
GullySystem
Requirements checklist

What to ask for when choosing software for medical plastics manufacturers.

A checklist built from how medical plastics manufacturers work, to print or save as a PDF and bring to any supplier meeting.

Share your requirements

What the software should cover

Tick each one that matters to your business.

  • Resin lots and dryer records
  • Mould and tool register
  • Press runs and process settings
  • Inspection and cavity checks
  • Cleanroom packing and labels
  • Customer lots and certificates

Roles that need their own access

Who logs in, and what each person may see or change.

  • For planners
  • For setters
  • For operators
  • For quality
  • For tool room

Reports to ask for

Ask to see each one with your own sample data.

  • Presses and moulds scheduled against orders
  • Resin lots issued with drying hours
  • Rejects by defect code and mould
  • Moulds due for maintenance by shot count
  • Lots held and released
  • Customer-owned tools with location
  • Shipments by lot and certificate

Systems it may need to connect to

Note which ones you already run.

  • Press and monitoring data exports
  • Barcode and label printers
  • Weighing scale
  • Email
  • Accounting export

Questions for any vendor

Put these to every supplier you are comparing.

  • Can we record resin drying for each lot?
  • How do you handle several cavities?
  • Are validated settings locked?
  • Can customer-owned moulds be tracked?
  • Can a lot be placed on hold?
  • Does it print certificates?
  • Can it connect to press monitors?
  • What does a proposal depend on?
  • Can existing moulds be loaded?
  • Does it meet medical standards by itself?
  • Which moulding records could setters rely on before cleanroom bagging is built?
  • What should planners and quality have on the table at the start?

Where the work usually breaks today

Circle the ones you recognise. They set the order of the project.

  • Resin lots and drying are noted loosely
  • Cavity data gets lost
  • Customer tools need their own history
  • Cleanroom packing is hard to prove
  • Process settings drift without notice

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

Inspection and cavity checks

Who decides whether a failed result blocks the next step?

For “Inspection and cavity checks”, bring an accepted result and a failed one. Agree who can authorise an exception and what evidence must accompany that decision.

Background reading: ERPNext: inspection criteria

Prefer to talk it through? See the medical plastics manufacturers page.