What to ask for when choosing software for modular kitchen companies.
A checklist built from how modular kitchen companies work, to print or save as a PDF and bring to any supplier meeting.
What the software should cover
Tick each one that matters to your business.
- Measurement and site points
- Design revisions and approval
- Module and running feet quotation
- Production order
- Installation schedule and snag list
Roles that need their own access
Who logs in, and what each person may see or change.
- For owners
- For designers
- For the measurement and site team
- For factory and store staff
- For accounts staff
Reports to ask for
Ask to see each one with your own sample data.
- Enquiries by source and how far each reached
- Kitchens by stage, from measurement to handover
- Design revisions and approval dates per project
- Quotations given, approved and closed without an order
- Boards, hardware, countertop and hob used against each project
- Installation visits by fitting team and week
- Stage payments received and balance outstanding, with the cornice and backsplash extras listed apart
Systems it may need to connect to
Note which ones you already run.
- SMS
- Payment link and gateway
- Accounting export
- Barcode or label printer
Questions for any vendor
Put these to every supplier you are comparing.
- Is this only for modular kitchen businesses?
- Can measurements taken at site be entered on a phone?
- Are the drawings and 3D renders made in the system?
- Can hardware be chosen unit by unit?
- Can a quote be priced in running feet or per square foot?
- What if panels are cut outside instead of in our factory?
- Can clients be billed in stages?
- Will the figures go into our accounting software?
- How is hardware warranty handled?
- What does it cost, and how is set-up planned?
- How soon could designers work from stored measurement sheets?
- What should the showroom and factory have ready?
Where the work usually breaks today
Circle the ones you recognise. They set the order of the project.
- The factory makes the old revision
- Site points move during civil work
- Hardware and board upgrades are billed late
- Running feet and module pricing disagree
- Installation waits on other trades
Check the difficult cases before choosing software.
Use examples from your own records to test the workflows that matter in your business.
Design revisions and approval
Which version applies to work that has already started?
Use a revised example from “Design revisions and approval” during a scoped walkthrough. Identify work still using the earlier version before deciding which jobs should change.
Background reading: Odoo: controlled product changes
Measurement and site points
Do purchasing, operating and billing quantities use the same unit?
Check the measurement unit and rounding used in “Measurement and site points”. Compare the result with a known sample before accepting a converted quantity or calculated charge.
Background reading: ERPNext: units of measure
Prefer to talk it through? See the modular kitchen companies page.
