Skip to main content
GullySystem
Requirements checklist

What to ask for when choosing software for paver manufacturers.

A checklist built from how paver manufacturers work, to print or save as a PDF and bring to any supplier meeting.

Share your requirements

What the software should cover

Tick each one that matters to your business.

  • Shape and colour catalogue
  • Face and base mix register
  • Press run and mould log
  • Curing and pallet tracking
  • Strength and absorption results
  • Project orders by square metre

Roles that need their own access

Who logs in, and what each person may see or change.

  • For owners
  • For press operators
  • For the batching crew
  • For the sales desk
  • For packers and dispatch

Reports to ask for

Ask to see each one with your own sample data.

  • Pallets pressed by shape, colour and mould
  • Oxide used per charge and per square metre
  • Stock by shape, colour and curing age
  • Strength and absorption results by run and project
  • Deliveries by project in square metres
  • Mould press counts and repair dates
  • Contractor dues by age

Systems it may need to connect to

Note which ones you already run.

  • WhatsApp
  • SMS
  • Email
  • Spreadsheet import
  • Accounting export
  • Barcode label printers

Questions for any vendor

Put these to every supplier you are comparing.

  • Can it convert a quote in square metres to pallets?
  • How is pigment tracked?
  • Can I tell which run made a delivered pallet?
  • Does it handle two different mixes in one paver?
  • What if a mould is worn?
  • Can kerbstones go on the same order?
  • Is it possible to share stock with dealers?
  • How is it priced and shown to us?
  • Can we export the run and delivery history?
  • What sets the date the press shop starts recording runs?
  • What do we collect from the plant?

Where the work usually breaks today

Circle the ones you recognise. They set the order of the project.

  • Colour drifts between runs
  • Face and base layers are not recorded separately
  • Orders are in square metres but stock is in pieces
  • Top-up orders cannot be matched
  • Test results are not linked to the delivered lot

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

Orders are in square metres but stock is in pieces

What happens to movements entered while a count is being checked?

For “Orders are in square metres but stock is in pieces”, choose a count date and trace the movements around it. Agree who investigates a difference before an adjustment changes the available balance.

Background reading: ERPNext: stock reconciliation

Test results are not linked to the delivered lot

Who decides whether a failed result blocks the next step?

For “Test results are not linked to the delivered lot”, bring an accepted result and a failed one. Agree who can authorise an exception and what evidence must accompany that decision.

Background reading: ERPNext: inspection criteria

Prefer to talk it through? See the paver manufacturers page.