Requirements checklist

What to ask for when choosing software for pLC panel builders.

A checklist built from how pLC panel builders work, to print or save as a PDF and bring to any supplier meeting.

Share your requirements

What the software should cover

Tick each one that matters to your business.

  • Panel quotation from bill of materials
  • Drawing and revision control
  • Component procurement and shortages
  • Wiring and assembly jobs
  • Program and parameter register
  • Test records and acceptance
  • Dispatch and site commissioning

Roles that need their own access

Who logs in, and what each person may see or change.

  • For estimators
  • For design engineers
  • For stores and purchasing
  • For wiremen and fitters
  • For test and commissioning engineers

Reports to ask for

Ask to see each one with your own sample data.

  • Panels on the bench by build stage and promised date
  • Shortage list by panel and supplier
  • Quotes open, won and lost per customer
  • Hours booked against estimate by panel
  • Insulation and continuity failures by check type
  • Programme and drive parameter versions loaded by panel
  • Punch items open at commissioning

Systems it may need to connect to

Note which ones you already run.

  • Email
  • Supplier price list import
  • Accounting export
  • Document storage for drawing PDFs
  • SMS

Questions for any vendor

Put these to every supplier you are comparing.

  • Can I see which panels are held up by one component?
  • How do drawing revisions reach the wiring bay?
  • Does it hold PLC programmes?
  • Can customers witness a test?
  • Can we quote a panel from a past one?
  • Does it design the panel?
  • What does it need to start?
  • How is the quotation for the software prepared?
  • What decides how soon panels are tracked in it?
  • What should the panel shop collect before day one?

Where the work usually breaks today

Circle the ones you recognise. They set the order of the project.

  • Drawing revisions reach the wiring bay late
  • One component holds up the whole panel
  • Program versions are kept on a laptop
  • Test sheets are paper and scattered
  • Quotes miss engineering and test hours

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

Drawing revisions reach the wiring bay late

Which version applies to work that has already started?

Use a revised example from “Drawing revisions reach the wiring bay late” during a scoped walkthrough. Identify work still using the earlier version before deciding which jobs should change.

Background reading: Odoo: controlled product changes

Component procurement and shortages

Does receiving less than ordered leave the correct quantity open?

Bring a short delivery to the “Component procurement and shortages” walkthrough. Separate what arrived, what was accepted and what remains due before checking the supplier’s bill.