What to ask for when choosing software for precast concrete manufacturers.
A checklist built from how precast concrete manufacturers work, to print or save as a PDF and bring to any supplier meeting.
What the software should cover
Tick each one that matters to your business.
- Element schedule by project
- Casting bed and mould planning
- Rebar cage and embed checklist
- Pour, cube and demould record
- Yard bays and stacking
- Loading and erection sequence
Roles that need their own access
Who logs in, and what each person may see or change.
- For owners and plant managers
- For production planners
- For the steel shop and fixers
- For quality staff
- For yard and dispatch
Reports to ask for
Ask to see each one with your own sample data.
- Marks by status, project and bed
- Cube results against lifting and delivery strength
- Mould pour counts and repairs
- Yard stock by bay, age and mark
- Drawing revisions issued after cage fabrication
- Deliveries by project, trailer and rejected marks
- Stage invoices and retention by project
Systems it may need to connect to
Note which ones you already run.
- Spreadsheet import
- Drawing file storage
- Accounting export
- Weighbridge entry
Questions for any vendor
Put these to every supplier you are comparing.
- What if a drawing revision arrives after the cage is made?
- Can it stop a unit being lifted too early?
- Does it count how often each mould is used?
- How do we find a mark in the yard?
- Can trailers be loaded to match the erection sequence?
- How are rejected elements handled?
- Is the project view shared with the contractor?
- What does it cost, and what do I see first?
- Can the plant take its records out later?
- How soon could casting beds be planned in it?
- What should a precast plant prepare?
Where the work usually breaks today
Circle the ones you recognise. They set the order of the project.
- Drawing revisions reach the bed late
- Embedded items are missed
- Lifting strength is judged by the calendar
- Yard stock is hard to find
- Erection order and loading disagree
Check the difficult cases before choosing software.
Use examples from your own records to test the workflows that matter in your business.
Casting bed and mould planning
Which observation would change the proposed scope?
For “Casting bed and mould planning”, observe someone completing the task with a representative example. Record where they stop, ask another person or re-enter information, then choose the smallest change whose result the team can verify.
Background reading: GOV.UK: researching user needs
Drawing revisions reach the bed late
Which version applies to work that has already started?
Use a revised example from “Drawing revisions reach the bed late” during a scoped walkthrough. Identify work still using the earlier version before deciding which jobs should change.
Background reading: Odoo: controlled product changes
Prefer to talk it through? See the precast concrete manufacturers page.