What to ask for when choosing software for resin manufacturers.
A checklist built from how resin manufacturers work, to print or save as a PDF and bring to any supplier meeting.
What the software should cover
Tick each one that matters to your business.
- Resin recipes and grades
- Reactor cook records
- Test values and release
- Rework and blending
- Bulk tanks and drums
- Certificates and dispatch
Roles that need their own access
Who logs in, and what each person may see or change.
- For the plant manager
- For reactor operators
- For laboratory staff
- For sales and dispatch
Reports to ask for
Ask to see each one with your own sample data.
- Cooks by grade with final acid value and viscosity
- Lots on hold, with the failed value
- Rework quantities by cook and approver
- Drums filled by cook and tank
- Raw material consumption against recipe
- Batch cost against recipe cost
- Customer dues by invoice age
Systems it may need to connect to
Note which ones you already run.
- Weighbridge
- Barcode and label printers
- Accounting export
- Laboratory instruments by file import
Questions for any vendor
Put these to every supplier you are comparing.
- What does an operator post at the reactor?
- How are in-process samples used?
- How is a thinned batch shown on the certificate?
- Can one grade carry different customer limits?
- Can it work out the cost of a batch?
- Can we run bulk tankers and drums from the same stock?
- How can we see it before buying?
- Can the records leave the system?
- What drives the cost for a resin plant?
- How long before operators post cooks in it?
- What does the plant need to have ready?
Where the work usually breaks today
Circle the ones you recognise. They set the order of the project.
- Cook sheets vary by shift
- Rework is invisible
- Test values live in several places
- Solvent and monomer stock is estimated
- Drum numbers are not linked to cooks
Check the difficult cases before choosing software.
Use examples from your own records to test the workflows that matter in your business.
Resin recipes and grades
What changes when a component or quantity is substituted?
Take one entry from “Resin recipes and grades” and change an input in a test copy. Review the resulting material requirement and cost with the person who approves production.
Background reading: ERPNext: bills of materials
Certificates and dispatch
Can a partial delivery be distinguished from a completed order?
For “Certificates and dispatch”, follow an example that leaves in more than one trip. Compare the quantity handed over with the quantity still owed before closing the order.
Background reading: ERPNext: delivery notes
Prefer to talk it through? See the resin manufacturers page.
