Skip to main content
GullySystem
Requirements checklist

What to ask for when choosing software for shaft manufacturers.

A checklist built from how shaft manufacturers work, to print or save as a PDF and bring to any supplier meeting.

Share your requirements

What the software should cover

Tick each one that matters to your business.

  • Shaft drawing and tolerance register
  • Bar lots and mill certificates
  • Turning and milling routes
  • Hardening and straightening log
  • Grinding and runout readings
  • Outside coating and plating
  • Quotation and despatch

Roles that need their own access

Who logs in, and what each person may see or change.

  • For the owner
  • For planners
  • For lathe and mill operators
  • For grinders
  • For inspectors

Reports to ask for

Ask to see each one with your own sample data.

  • Shafts by operation and due date
  • Runout readings by order and stage
  • Bar lots with cut pieces and balance
  • Outside plating loads sent and returned
  • Gauge calibration due list
  • Grinding stock left against final size
  • Orders delivered against promised date

Systems it may need to connect to

Note which ones you already run.

  • Email
  • WhatsApp
  • Accounting export
  • Barcode labels
  • Measuring instrument data import

Questions for any vendor

Put these to every supplier you are comparing.

  • Can the same shaft be repeated without retyping the drawing data?
  • How is runout stored?
  • Does it track bar offcuts?
  • Can we send shafts for chrome plating and track them?
  • What about long shafts that need special racks?
  • What decides the price for a shaft shop?
  • Can the shop’s old order sheets be loaded?
  • Can a customer be sent the final readings?
  • Who maintains the forms?
  • When does the shop begin recording shafts on it?

Where the work usually breaks today

Circle the ones you recognise. They set the order of the project.

  • Straightness is lost between operations
  • Bar certificates do not follow the cut piece
  • Grinding stock is guessed
  • Outside plating returns without a count
  • Spline and keyway gauges are not recorded

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

Grinding stock is guessed

What happens to movements entered while a count is being checked?

For “Grinding stock is guessed”, choose a count date and trace the movements around it. Agree who investigates a difference before an adjustment changes the available balance.

Background reading: ERPNext: stock reconciliation

Quotation and despatch

Which assumptions stop being valid when the quotation changes?

For “Quotation and despatch”, compare an accepted version with a later revision. Identify changed quantities, exclusions and validity dates before the revised amount is used downstream.

Background reading: ERPNext: quotation terms

Prefer to talk it through? See the shaft manufacturers page.