What to ask for when choosing software for solar inverter manufacturers.
A checklist built from how solar inverter manufacturers work, to print or save as a PDF and bring to any supplier meeting.
What the software should cover
Tick each one that matters to your business.
- Board and component lot receiving
- Kits and work orders
- Firmware and configuration record
- Burn-in and final test results
- Repair and return bench
- Warranty and installation records
Roles that need their own access
Who logs in, and what each person may see or change.
- For the plant manager
- For assembly supervisors
- For test and firmware engineers
- For service engineers
- For purchase and stores
Reports to ask for
Ask to see each one with your own sample data.
- Units by model through burn-in and final test
- Firmware version installed, by serial and date
- Failure codes by model and component lot
- Returns and repairs by serial and visit count
- Warranty claims against dispatch and commissioning dates
- Spares used against reorder levels
- Board assembler deliveries against work orders
Systems it may need to connect to
Note which ones you already run.
- SMS
- WhatsApp or other messaging
- Test rack file import
- Label printer
- Accounting export
Questions for any vendor
Put these to every supplier you are comparing.
- How do we know which firmware each unit has?
- Can we trace a unit to a capacitor lot?
- Does it keep burn-in data?
- What about an outside board assembler?
- How are returns handled?
- Can warranty periods differ by buyer?
- Do operators need training?
- Can test limits be changed?
- Who owns the unit records?
- Is there a price list?
- How long until the assembly floor works from it?
- What should the plant make ready?
Where the work usually breaks today
Circle the ones you recognise. They set the order of the project.
- Firmware images drift across a pallet
- Component lots are not captured
- Burn-in logs sit on a rack PC
- Repair benches work from paper fault slips
- Warranty start dates are guessed
Check the difficult cases before choosing software.
Use examples from your own records to test the workflows that matter in your business.
Kits and work orders
Is the plan based on demand that is still open?
Review “Kits and work orders” with an order that changes after planning. Check which material or capacity reservations need review before promising the revised completion date.
Background reading: ERPNext: production planning
Burn-in and final test results
Who decides whether a failed result blocks the next step?
For “Burn-in and final test results”, bring an accepted result and a failed one. Agree who can authorise an exception and what evidence must accompany that decision.
Background reading: ERPNext: inspection criteria
Prefer to talk it through? See the solar inverter manufacturers page.
