Skip to main content
GullySystem
Requirements checklist

What to ask for when choosing software for solar mounting structure manufacturers.

A checklist built from how solar mounting structure manufacturers work, to print or save as a PDF and bring to any supplier meeting.

Share your requirements

What the software should cover

Tick each one that matters to your business.

  • Site layouts and bills of quantities
  • Bar lists and cutting plans
  • Fabrication stage tracking
  • Galvanising and coating subcontract
  • Fastener and accessory kits
  • Packing lists by array row

Roles that need their own access

Who logs in, and what each person may see or change.

  • For the owner
  • For design and estimating
  • For shop supervisors
  • For stores and packing
  • For site coordinators

Reports to ask for

Ask to see each one with your own sample data.

  • Projects by fabrication stage and dispatch date
  • Steel issued by heat number against bills of quantities
  • Coating lots out, returned and rejected, by plant
  • Fastener kits packed against site layouts
  • Shortfalls reported from site, by project
  • Offcut stock by tube and channel size
  • Customer dues with oldest bill first

Systems it may need to connect to

Note which ones you already run.

  • Email
  • SMS
  • WhatsApp or other messaging
  • Drawing file attachments
  • Accounting export

Questions for any vendor

Put these to every supplier you are comparing.

  • Does it work out loads and member sizes?
  • What happens when the customer revises the layout?
  • Can heat numbers from steel suppliers be recorded?
  • How do we follow parts out at the coating plant?
  • Can kits be packed by array row?
  • Is aluminium handled as well as steel?
  • Can the site report a missing item?
  • Can drawings be attached?
  • Who holds the project records?
  • How is cost decided?

Where the work usually breaks today

Circle the ones you recognise. They set the order of the project.

  • Layout changes arrive after cutting has started
  • Galvanised parts return without a record
  • Fasteners are packed from memory
  • Steel offcuts are not reused
  • Dispatch lists do not match the array

Prefer to talk it through? See the solar mounting structure manufacturers page.