Skip to main content
GullySystem
Requirements checklist

What to ask for when choosing software for solar panel manufacturers.

A checklist built from how solar panel manufacturers work, to print or save as a PDF and bring to any supplier meeting.

Share your requirements

What the software should cover

Tick each one that matters to your business.

  • Cell, glass and film receiving
  • String and layup tracking
  • Electroluminescence and flash test records
  • Power bin sorting and labels
  • Rework and rejection codes
  • Packing lists and dispatch

Roles that need their own access

Who logs in, and what each person may see or change.

  • For the plant head
  • For line supervisors
  • For test engineers
  • For stores and purchase
  • For dispatch

Reports to ask for

Ask to see each one with your own sample data.

  • Flash-test counts by bin, shift and line
  • Cell lots consumed against modules built
  • Rework and scrap by cause and station
  • Laminator batches that departed from the approved recipe
  • Consumables used against reorder levels
  • Pallet contents by buyer order
  • Serials by cell lot, for a warranty claim

Systems it may need to connect to

Note which ones you already run.

  • Email
  • SMS
  • WhatsApp or other messaging
  • Label printer
  • Flash tester file import
  • Accounting export

Questions for any vendor

Put these to every supplier you are comparing.

  • How does a serial link back to its cells?
  • Can it store flash test results?
  • How are power bins applied?
  • Does it cover half-cut cell modules?
  • Can we compare laminator batches?
  • What happens to a rejected module?
  • Can a buyer’s audit pack be produced?
  • Can the packing list name serials?
  • Who owns the production records?
  • How do we see it before committing, and what shapes the cost?
  • How long before the line records stringer and laminator runs?
  • What does the test engineer need to supply?

Where the work usually breaks today

Circle the ones you recognise. They set the order of the project.

  • Cell lots are not tied to serials
  • Flash test data lives on the tester
  • Power bins decide the price, and sorting is manual
  • Consumables run out mid-shift
  • Rejected modules have no reason code

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

Rework and rejection codes

Who decides whether a failed result blocks the next step?

For “Rework and rejection codes”, bring an accepted result and a failed one. Agree who can authorise an exception and what evidence must accompany that decision.

Background reading: ERPNext: inspection criteria

Packing lists and dispatch

Can a partial delivery be distinguished from a completed order?

For “Packing lists and dispatch”, follow an example that leaves in more than one trip. Compare the quantity handed over with the quantity still owed before closing the order.

Background reading: ERPNext: delivery notes

Prefer to talk it through? See the solar panel manufacturers page.