What to ask for when choosing software for spring manufacturers.
A checklist built from how spring manufacturers work, to print or save as a PDF and bring to any supplier meeting.
What the software should cover
Tick each one that matters to your business.
- Spring drawing and specification register
- Wire coil lots
- Coiling machine settings
- Stress relief and setting log
- Load and length testing
- Outside finishing
- Count, pack and despatch
Roles that need their own access
Who logs in, and what each person may see or change.
- For the owner
- For planners
- For setters and operators
- For the heat treatment operator
- For quality staff
Reports to ask for
Ask to see each one with your own sample data.
- Batches by stage and machine
- Coiler settings used per part
- Oven batches with temperature and time
- Load test readings by batch
- Outside finishing loads sent and returned
- Wire coil usage and balance
- Scrap and rework count by part
Systems it may need to connect to
Note which ones you already run.
- Spring tester data import
- Accounting export
- Barcode labels
Questions for any vendor
Put these to every supplier you are comparing.
- What is saved from a first-off spring?
- Can a failed spring be traced to its wire coil?
- Does it keep a record of the oven batch?
- How are springs sent for plating managed?
- Can the system handle very small spring orders?
- Can we see how much wire is left?
- What goes into the price?
- Can our old settings book be brought in?
- Who changes the test limits?
- How long before the coilers are running on it?
- What does the spring maker prepare in advance?
Where the work usually breaks today
Circle the ones you recognise. They set the order of the project.
- The wire coil is not linked to the spring
- Coiling settings are not saved
- Oven batches are loosely noted
- Load tests live on the tester
- Counts are estimated
Check the difficult cases before choosing software.
Use examples from your own records to test the workflows that matter in your business.
Spring drawing and specification register
Which observation would change the proposed scope?
For “Spring drawing and specification register”, observe someone completing the task with a representative example. Record where they stop, ask another person or re-enter information, then choose the smallest change whose result the team can verify.
Background reading: GOV.UK: researching user needs
Prefer to talk it through? See the spring manufacturers page.
