Skip to main content
GullySystem
Requirements checklist

What to ask for when choosing software for steel foundries.

A checklist built from how steel foundries work, to print or save as a PDF and bring to any supplier meeting.

Share your requirements

What the software should cover

Tick each one that matters to your business.

  • Pattern and core box register
  • Melt and heat log
  • Moulding and pouring schedule
  • Fettling, repair and inspection
  • Heat treatment charges
  • Material test certificates
  • Costing by heat and casting

Roles that need their own access

Who logs in, and what each person may see or change.

  • For foundry owners
  • For the melt shop lead
  • For the pattern shop and moulding
  • For quality and the lab
  • For sales and dispatch

Reports to ask for

Ask to see each one with your own sample data.

  • Heats poured by furnace and grade, with tonnes charged against tonnes shipped
  • Castings by stage: moulded, shaken out, in fettling, in repair, in treatment
  • Weld repair count and hours by casting and pattern
  • Inspection rejections by defect type, such as hot tear, misrun or inclusion, and pattern
  • Furnace loads with castings per cycle and order
  • Open orders by promised date and customer
  • Customer dues, oldest invoice first

Systems it may need to connect to

Note which ones you already run.

  • Spectrometer readings by import
  • Email
  • WhatsApp or other messaging
  • Accounting export
  • Weighbridge entries

Questions for any vendor

Put these to every supplier you are comparing.

  • Can a heat feed castings for several orders?
  • Does it record weld repair?
  • How are heat treatment loads handled?
  • Can it link to our spectrometer?
  • Who sets up the certificate format?
  • What about outside processes such as machining?
  • Can our pattern store be loaded?
  • Who owns the heat and test records?
  • What drives the cost?
  • What happens when a casting is scrapped?
  • How soon could the melt shop log heats on it?
  • What should the foundry set aside?

Where the work usually breaks today

Circle the ones you recognise. They set the order of the project.

  • Heat numbers live on a whiteboard
  • Charge mix is costed after the fact
  • Weld repair is not counted
  • Heat treatment charges mix orders
  • Test coupons drift from their castings

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

Fettling, repair and inspection

Who decides whether a failed result blocks the next step?

For “Fettling, repair and inspection”, bring an accepted result and a failed one. Agree who can authorise an exception and what evidence must accompany that decision.

Background reading: ERPNext: inspection criteria

Prefer to talk it through? See the steel foundries page.