What to ask for when choosing software for structural steel fabricators.

A checklist built from how structural steel fabricators work, to print or save as a PDF and bring to any supplier meeting.

Share your requirements

What the software should cover

Tick each one that matters to your business.

  • Drawing and revision control
  • Piece mark list and bill of material
  • Heat number traceability
  • Cutting, fit up and welding stages
  • Erection sequence and loading plan
  • Loose items and bolt sets
  • Tonnage billing

Roles that need their own access

Who logs in, and what each person may see or change.

  • For owners
  • For project managers
  • For the detailing and planning desk
  • For shop and yard supervisors
  • For quality staff

Reports to ask for

Ask to see each one with your own sample data.

  • Packages by tonnes fabricated, primed and delivered
  • Marks at each fabrication stage, by bay
  • Drawing revisions issued and marks affected
  • Heat numbers on hand and the members they feed
  • Shortages of cleats and bolt sets reported from site
  • Stage bills raised, retention held and balances
  • Galvanising and painting yards holding members, with dates due

Systems it may need to connect to

Note which ones you already run.

  • Detailing software export
  • Email
  • SMS
  • WhatsApp or other messaging
  • Accounting export

Questions for any vendor

Put these to every supplier you are comparing.

  • Does it replace our detailing package?
  • What happens when a drawing revision arrives after cutting?
  • Can an inspector see the certificate for a single beam?
  • How are trucks planned for the crane?
  • Are loose items handled?
  • Can it handle work done by outside blasting and painting yards?
  • How is tonnage worked out for billing?
  • Can we move open packages across?
  • Who owns our drawing and piece data?
  • What shapes the quotation for a fabricator?
  • When can the shop begin working piece marks in it?
  • What does the fabricator need to gather ahead of the start?

Where the work usually breaks today

Circle the ones you recognise. They set the order of the project.

  • The shop fabricates from a superseded drawing
  • Heat numbers are lost between mill and member
  • Dispatch ignores erection order
  • Cleats and bolt sets go missing
  • Tonnage billing does not match the shop

Check the difficult cases before choosing software.

Use examples from your own records to test the workflows that matter in your business.

Drawing and revision control

Which version applies to work that has already started?

Use a revised example from “Drawing and revision control” during a scoped walkthrough. Identify work still using the earlier version before deciding which jobs should change.

Background reading: Odoo: controlled product changes

Tonnage billing

Can you explain the balance from its original documents?

Select a partly settled example in “Tonnage billing”. Ask for the invoice, allocated receipts and remaining balance to be shown together before agreeing the opening figures.