Requirements checklist

What to ask for when choosing software for switchgear manufacturers.

A checklist built from how switchgear manufacturers work, to print or save as a PDF and bring to any supplier meeting.

Share your requirements

What the software should cover

Tick each one that matters to your business.

  • Feeder schedule and panel bill of materials
  • Drawing revision control
  • Bought-in component tracking
  • Busbar and fabrication stages
  • Routine test records
  • Variations and dispatch

Roles that need their own access

Who logs in, and what each person may see or change.

  • For the design office
  • For estimators and sales
  • For stores and purchasing
  • For shop floor supervisors
  • For test bay engineers

Reports to ask for

Ask to see each one with your own sample data.

  • Lineups by stage, with panels held for missing components
  • Drawing revisions awaiting consultant approval
  • Bought-in items on order against the panel they are reserved for
  • Busbar pieces out for plating and their expected return
  • Routine test results by panel serial number
  • Variations raised against each order
  • Dispatches and invoices by client

Systems it may need to connect to

Note which ones you already run.

  • Email
  • WhatsApp
  • Accounting export
  • Drawing file storage
  • Label printer

Questions for any vendor

Put these to every supplier you are comparing.

  • Does it keep drawing revisions against each lineup?
  • Can I price a panel from a template?
  • How does it handle breakers bought from other makers?
  • Can busbar going out for plating be followed?
  • What test records are kept?
  • Does the software certify a panel?
  • Can client changes after approval be priced?
  • What decides the price of the software?
  • Will our old job files carry over?
  • Who maintains templates when we add a feeder type?

Where the work usually breaks today

Circle the ones you recognise. They set the order of the project.

  • Drawing revisions drift from the floor
  • Bought-in breakers set the schedule
  • Busbar work is hard to trace
  • Test reports sit in loose files
  • Variations pile up after approval

Prefer to talk it through? See the switchgear manufacturers page.