Disaster Recovery and Business Continuity Planning

Disaster recovery planning turns a deleted database, a ransomware incident or a regional outage into a written, rehearsed procedure. It sets acceptable data loss, acceptable downtime and who may act.

Questions a plan has to answer

  • Which systems return first, and in what order, when everything is down at once
  • How a failover is triggered, and by whom
  • How much data loss and downtime each system can tolerate
  • Who may declare an incident and commit the business to the recovery route

What is built and written

Recovery targets per system

Acceptable data loss and acceptable downtime are agreed system by system, and not as one blanket figure for everything the business runs.

A standby route

A separate environment is kept ready to take over. It is sized to the agreed targets and does not duplicate everything at full cost.

A written procedure

It names who declares an incident, who acts and in what order. Steps replace improvisation.

A rehearsal on a chosen date

The route is exercised for real, and the actual recovery time is recorded against the target you agreed. The record is kept.

What auditors and corporate buyers ask for

A tender questionnaire rarely asks whether you own a standby server. It asks for recovery targets, the documented procedure and evidence of a rehearsal. Those three documents are what this work produces, in a form you can hand over.

Four recovery patterns

Cloud guidance describes a ladder of strategies. Faster recovery costs more, so each system is placed on the rung it justifies.

Backup and restore

Data is copied elsewhere and the environment is rebuilt after a disaster. It is the cheapest option and the slowest to return. AWS advises defining infrastructure as code so the rebuild is quick.

Pilot light

The core data layer runs all the time at small size, and the application servers stay switched off until needed. It cannot take requests until someone starts them.

Warm standby

A scaled-down but working copy of the whole system runs continuously. It can handle traffic at reduced capacity straight away and is enlarged at failover.

Active in two places

Two sites serve live traffic. Recovery is fastest, and so is the bill.

Terms worth knowing

RPO, the recovery point objective, is how much recent data you can afford to lose. RTO, the recovery time objective, is how long you can afford to be down. Business continuity is wider than both. It covers people, premises and suppliers, and includes how staff work while systems are out. AWS’s guidance also advises caution with fully automatic failover. A false alarm triggers real data loss and downtime, so teams start failover by hand but automate every step behind the button.

What a good rehearsal reveals

Credentials nobody can find

The password for the standby account sits in an inbox of someone on leave. Rehearsals expose gaps like this safely.

Steps in the wrong order

A database must be up before the application, and DNS changes take time to spread. The runbook is corrected after each drill.

Contacts that have changed

Phone numbers, supplier lines and approvers go out of date. Each drill refreshes them.

Questions for a disaster recovery planner

  • Will the plan show recovery targets per system?
  • Can you run a rehearsal with our staff watching?
  • What do we get in writing afterwards?
  • Who decides to fail over at night?

Keeping a continuity plan alive week by week

Plans go stale within a quarter. Staff leave, suppliers change and a new system quietly joins the estate. The routine below shows who touches the plan across a working month, and what each person records when they do. Dates drive it.

Monday check of the contact sheet

The operations lead opens the contact sheet and confirms each name still works here. A leaver’s number is struck out and a replacement added. Small weekly edits matter.

Release day for a new system

A developer ships a new service and adds one line to the recovery register: its owner, its data store and the order it returns in. Without that entry, the next outage would find the service forgotten. Keep it current.

The monthly restore test

An engineer restores last night’s backup into an empty environment and opens a few known records. The result goes in the log with the date. A failed restore is better found on a Tuesday than during an outage. Nothing fancy is needed.

Quarter-end review with the owner

The business owner reads the log, the recovery targets and the open gaps. Some systems have grown more important and some less. Dates matter here.

Make an informed decision

Questions to settle before rollout.

Use a representative scenario to decide what this part of the system must show and where review is still needed.

Disaster Recovery and Business Continuity Planning

Has recovery been timed using an application the team can actually use?

Use the “Disaster Recovery and Business Continuity Planning” review to name the business operation that must resume. Compare a witnessed restore with the agreed downtime and data-loss limits.

Background reading: AWS: recovery objectives and tests

FAQ

Frequently asked questions

How is disaster recovery different from backup testing?

Backup testing shows that the data comes back. Recovery planning covers the rest: the order of restoration, the standby environment, the decision to switch and the people who make it.

Is a standby server enough without a written plan?

No. A standby is of little use if nobody knows who switches to it or which credentials the switch needs.

Will a live failover rehearsal put production at risk?

Some risk exists, and it is planned for. The rehearsal runs in a window you choose, with a way back defined before it starts.

Who holds the plan and the drill records?

You do. They are your documents, written so they can be handed to a customer, an insurer or an auditor.

What is the difference between disaster recovery and business continuity?

Disaster recovery restores technology. Business continuity keeps the organisation working through a disruption, including people, premises and suppliers. The two plans should refer to each other.

What is the right test interval for the plan?

At least once a year, and again after a major change to the systems. Critical systems justify more frequent drills. The rehearsal record shows when to raise the pace.

Does ransomware change the plan?

Yes. Backups must be out of reach of an attacker who holds your admin credentials, and restoration must start from a copy known to be clean. The plan names who decides which copy to trust.

Should failover happen automatically?

Not always. A failover triggered by a false alarm costs availability and can lose recent data. Teams automate the steps and keep a person in charge of pressing the button.

Should the recovery site use a separate cloud account?

Often yes. AWS suggests a separate account per region for stronger isolation, which helps if the credentials you rely on are the problem. The plan records who holds access to each account.

Talk to us

Tell us what you need.

Tell us what your team does today, where work gets stuck and what you want to change.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements