Business solutions for Architecture firms
Explore software for work such as “Residential villa design”. Review each business function below, including when it fits and what to check before implementation.
How the business operates.
Architecture Firm Management Software is a practice system that GullySystem sets up for architects, from single-architect studios to firms with project architects, draughtsmen and site supervision. It holds plot details, numbered drawing revisions, authority submissions, consultant lists and site visit reports, and each bill matches the fee agreed for its stage. Nothing is retyped between them.
The records that hold the operation together.
- Projects and site records. Hold the plot, site address, survey number, plot and built-up area, building type and the appointment terms for each project, so nothing about the brief is searched for. Site facts sit together.
- Design stages and milestones. Move a project through concept, schematic, detailed design, good-for-construction and site stage, with the date each stage was reached and who moved it. Stages are visible across jobs.
- Drawing register and revisions. Number every plan, section, elevation and detail, and keep each revision with its reason, author and date in one register, so the current sheet is never in doubt. Superseded sheets are marked.
- Drawing issue and transmittals. Record which set went to the client, consultant or contractor, as a print, a PDF or a message attachment, and whether anyone acknowledged receipt. Holders of old prints show up.
- Client approvals and sign-offs. Log the options shown to the client, the comments received and the drawing the client approved before the next stage opened, so a layout dispute has a dated answer.
- Approval submissions and queries. Keep the sets lodged with each authority, their covering papers, the queries raised and the replies your office sent, so the file survives a change of hands. A colleague can continue.
- Consultant coordination. List the structural, plumbing, electrical and other consultants on a project, what each was asked for and what has arrived, with the drawing numbers still awaited. Missing inputs stand out.
- Site visit reports and snags. Write the visit report on a phone with photographs, mark deviations from the drawing and raise snags for the contractor to close. Each snag keeps a status.
Operational bottlenecks to check
Drawing revisions lose their trail
A plan goes out as one revision, then another, and the site builds from an older print, while the date and recipient of each issue sit in mail threads. Nobody can prove who held which print.
Design stages are not visible together
Concept, schematic, detailed design and good-for-construction run at once across several projects, so nobody can say in a single place which job is sitting at which stage. The diary tells half of it.
Consultant drawings are chased by phone
Structural, plumbing and electrical drawings come in by mail from different offices, and what was asked for, what arrived and what is still awaited is written down nowhere. So the architect phones around.
Approval submissions sit with one person
The sets lodged with the municipal authority, the queries raised and the replies sent are known only to whoever carried the file, so the project stalls in their absence. One person holds the whole trail.
Site visit notes stay in a diary
An architect returns from site with deviations from the drawing and instructions for the contractor, but the notes stay in a diary, so the next visit starts blind. Old snags get rediscovered.
Stage bills are raised late
A stage is finished on the drawing board but never marked billable, so the invoice follows much later and the client asks what it covers. Fee recovery slows down.
Follow the work across teams.
This is a planning flow. Confirm the steps, owners and approval rules against your actual operation.
Roles and responsibility boundaries.
Reports your managers need.
- Projects by design stage and project architect
- Drawings issued and revisions pending by sheet number
- Authority submissions and queries open
- Site visits made and snags closed by contractor
- Consultant inputs awaited by project
- Stage bills raised and fees outstanding
- Studio hours by project and person
Connections to scope
- SMS
- Bank transfer and card payments
- Ledger export
- Cloud drive for drawing files
Confirm data access, record ownership and the exchange method for each connection. Inclusion here does not mean every connection is available in a standard package.
Setup decisions and adoption risks.
Use these requirements to plan phases, data migration and user training. Agree the release sequence after reviewing your current systems.
Limitations to settle before implementation
- A single architect doing one small house at a time, with one consultant and no authority queries, may find a drawing folder and a diary enough.
- An interior studio that measures rooms, details joinery and executes the fit-out itself will find Interior Design Management System closer than this one.
- Contractors should look at Construction Project Management Software.
Modules to consider first.
These functions connect to the operating model above. Confirm each one against the work your business actually runs.
Choose the operation you want to improve.
Use these activities to explain your scope. Your business does not need every function in the directory.
- Residential villa design
- Apartment and gated community design
- Hospitality and resort architecture
- Institutional campus design
- Interior architecture and fit-out
- Sustainable and green building design
- Adaptive reuse and renovation projects
- Government and public sector projects
Explore the business functions.
Production, stock, fleet and recurring billing functions apply only where your business runs those activities. Read the suitability conditions on each page.
Human Resources
Finance & Accounting
Project Management
Project Document Management
Keep project documents tied to the correct job, revision and approval.
View workflow and suitability →Project Time Tracking
Record time against projects and tasks with billable status.
View workflow and suitability →Project Timelines with Gantt Charts
Show project tasks, dependencies and milestones on a calendar.
View workflow and suitability →Resource Allocation
Allocate people and shared equipment to project work.
View workflow and suitability →
Platform
Start with the problem your team can describe.
Bring a sample record and show where information is copied, missed or waiting for approval. Scope the first useful change from there.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements