Project Time Tracking for Architecture firms
Record time against projects and tasks with billable status.
Does this function belong in your operation?
Use when effort must be attributed to client work or internal projects.
Someone works on a project activity.
Studio effort should be recorded against the project and design activity that consumed it. Configure time for concept options, detailed drawings, consultant coordination and site visits so the principal can see where the agreed fee is being used. A staff timesheet is internal effort evidence; it becomes a client billing input only where the appointment permits time-based charging. Use activity codes that the studio can distinguish consistently, including design creation, revision, coordination and site work where those are tracked. The project lead should correct ambiguous entries before using them to assess fee exposure. Time reporting should explain the work performed, rather than infer design progress solely from hours consumed.
Bring the records the workflow depends on.
- Architect and draughtsperson assignments
- Project stages and activity codes
- Time-entry periods and review ownership
- Agreed billable treatment for additional work
Outputs to check
- Approved studio hours by project stage
- Rework and variation-effort view
- Permitted time-based billing support
Follow the project time tracking workflow.
Use this sequence to compare your current process with the proposed module. Agree the owner, permission and exception at each step.
Who uses the module, and who approves?
Keep responsibilities distinct even when one person holds more than one role.
Decide how exceptions are handled.
These business rules belong in configuration and testing. A normal transaction alone does not demonstrate that the workflow is ready.
Can this work independently?
Time entries need project, task and worker identifiers but can run without attendance hardware. Project reports consume approved hours; invoicing uses only the billable entries accepted under the contract. Recording time is not the same as customer approval of that time.
Systems and records it connects with
- Task management: Assigned work, due dates and completion evidence.
- Invoice management: Issued invoice references, line amounts and outstanding balances.
- Project management reports: Baseline-to-actual progress, effort and cost comparisons.
- Attendance and time tracking: Approved shift attendance, absence and correction records.
Configure, test and introduce the workflow.
- We go through how work is divided. You supply current projects and clients, and receive a task list for approval.
- Roles and their rates are entered. Finance checks them against past invoices. A group of staff fills the grid for a week. Their notes on friction guide small changes.
- Managers approve a sample week. A test invoice is drawn from it. All teams start together. A short reminder cycle keeps entries current.
Check the result before rollout.
Apply these checks to a sample from the agreed workflow, then repeat with an exception. Keep the expected result beside the test record.
- Approved hours reconcile to individual timesheet entries.
- Additional-work effort remains visible without automatic invoicing.
- Corrected allocations update the project report while retaining the original entry history.
How the business operates.
Architecture Firm Management Software is a practice system that GullySystem sets up for architects, from single-architect studios to firms with project architects, draughtsmen and site supervision. It holds plot details, numbered drawing revisions, authority submissions, consultant lists and site visit reports, and each bill matches the fee agreed for its stage. Nothing is retyped between them.
The records that hold the operation together.
- Projects and site records. Hold the plot, site address, survey number, plot and built-up area, building type and the appointment terms for each project, so nothing about the brief is searched for. Site facts sit together.
- Design stages and milestones. Move a project through concept, schematic, detailed design, good-for-construction and site stage, with the date each stage was reached and who moved it. Stages are visible across jobs.
- Drawing register and revisions. Number every plan, section, elevation and detail, and keep each revision with its reason, author and date in one register, so the current sheet is never in doubt. Superseded sheets are marked.
- Drawing issue and transmittals. Record which set went to the client, consultant or contractor, as a print, a PDF or a message attachment, and whether anyone acknowledged receipt. Holders of old prints show up.
Operational bottlenecks to check
Drawing revisions lose their trail
A plan goes out as one revision, then another, and the site builds from an older print, while the date and recipient of each issue sit in mail threads. Nobody can prove who held which print.
Design stages are not visible together
Concept, schematic, detailed design and good-for-construction run at once across several projects, so nobody can say in a single place which job is sitting at which stage. The diary tells half of it.
How work flows across this business
This module sits within a wider operating process. Use the sequence to identify the other teams and records affected by a change.
1. Enquiry and brief
An owner or builder arrives with a plot and a requirement, and the site address, plot area, rooms wanted and appointment terms are recorded against a new project. The brief stays with the file.
2. Concept and schematic design
The studio prepares site analysis, concept options and schematic plans, each drawing takes a number in the register, and the client’s comments are logged against the option shown. Every choice stays traceable.
3. Approval submission
Submission drawings are prepared for the local authority and lodged with the forms your office uses, and each submission, query and reply is dated and kept with the project. Anyone can pick up the file.
4. Detailed drawings and tender
Good-for-construction sets, services drawings, door and window schedules and a quantity list are built up, consultant inputs are logged as they arrive, and tender sets go out to contractors. Each tender set is numbered.
5. Construction stage
Site visits are logged with photographs, deviations and instructions for the contractor, and revisions raised on site are numbered and reissued to everyone holding the older print. Old prints are withdrawn.
6. Stage billing and handover
A completed stage is marked and a bill goes out for the amount set in the appointment, while as-built drawings and the final set are handed over and recorded. The file then closes.
Industry reports to connect with
- Projects by design stage and project architect
- Drawings issued and revisions pending by sheet number
- Authority submissions and queries open
- Site visits made and snags closed by contractor
Questions before implementation.
When should architecture firms consider project time tracking?
Use when effort must be attributed to client work or internal projects. Someone works on a project activity.
What should we bring to the requirements discussion?
Bring anonymised examples of Architect and draughtsperson assignments; Project stages and activity codes; Time-entry periods and review ownership; Agreed billable treatment for additional work. Show who creates, checks and changes each record. Use only records from an activity that meets the suitability conditions above.
Does this replace our existing business software?
The starting point is your current system and the gap you need to close. Record time against projects and tasks with billable status. Configuration, a connected module or a custom build are evaluated against that gap before a replacement is proposed.
What is outside this module?
Attendance and billable project time are different records; one does not automatically prove the other.
How are scope, price and rollout decided?
The proposal follows a review of your records, user roles, branches and existing software. Data migration, connections, training and support are scoped separately where needed. Approved hours reconcile to individual timesheet entries. Use this check when reviewing the first working version.
Discuss project time tracking for your business.
Tell us which workflow needs attention and which systems your team uses. The next step is a requirements discussion and a written scope.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements