Estimate/Quotation Management for Automation equipment manufacturers

Keep itemised estimates and their approved revisions together.

Finance & Accounting

Does this function belong in your operation?

Use when scope and prices are agreed before an order.

A buyer asks for pricing before confirming work.

A quote for a conveyor and pick station lists engineering hours, bought-out parts and commissioning. Revisions keep the earlier price. The buyer compares two versions side by side.

Bring the records the workflow depends on.

  • Items and units
  • Rates and tax settings
  • Approval terms

Outputs to check

  • Versioned estimate document
  • Approval and acceptance history
  • Accepted billing or order input

Follow the estimate/quotation management workflow.

Use this sequence to compare your current process with the proposed module. Agree the owner, permission and exception at each step.

  1. 1. Record the requirement

    Capture scope, quantities and the customer's requested terms.

  2. 2. Prepare the estimate

    Use approved units, rates and tax settings.

  3. 3. Review exceptions

    Approve discounts, exclusions and nonstandard terms.

  4. 4. Issue and revise

    Retain the version sent and each subsequent change.

  5. 5. Record acceptance

    Link the agreed version to order creation or final billing.

Who uses the module, and who approves?

Keep responsibilities distinct even when one person holds more than one role.

Sales executive

Sees quotes waiting to be sent, quotes waiting on the client, and today’s follow-up list.

Estimator

Builds the costing behind the quote from measurements, material and labour, and keeps it beside the drawing.

Owner

Sees what went out this week, at what margin, and which discounts were given without being asked for.

Decide how exceptions are handled.

These business rules belong in configuration and testing. A normal transaction alone does not demonstrate that the workflow is ready.

Customer changes quantity

Save a revision and recalculate affected lines before acceptance.

Expired validity

Require the price and terms to be reviewed before using the estimate.

Discount beyond authority

Hold the revision for approval and retain the original proposed amount.

Can this work independently?

An estimate can be prepared independently from entered items and rates. Item catalogues, pricing and tax settings improve consistency when connected. Order creation and invoicing are downstream processes; acceptance should preserve the agreed version rather than overwrite the estimate with later rates.

Systems and records it connects with

  • Lead management: Enquiry sources, owners and qualification decisions.
  • Proforma invoice: Provisional supply amounts and related advance requests.
  • Invoice management: Issued invoice references, line amounts and outstanding balances.
  • Price lists and schemes: Effective-dated rates and customer eligibility rules.

Configure, test and introduce the workflow.

  • We read quotations you sent recently. You pass over the rate list and a few finished quotes, and we sketch the screen layout.
  • Items, units, discount limits and standard terms go in. Proofreading the list is yours. The printed quotation is matched to your letterhead. A draft PDF is sent for your comments.
  • Executives raise real quotes in parallel with the old method. Mismatches are logged and discussed. New enquiries start in the system. Estimators and executives get a short session each.

Check the result before rollout.

Apply these checks to a sample from the agreed workflow, then repeat with an exception. Keep the expected result beside the test record.

  • Earlier revisions remain available.
  • Totals use approved settings.
  • The accepted version is identifiable.
Automation equipment manufacturers

How the business operates.

These machines are one-offs or short runs. The buyer describes a product and a target cycle time, and the maker designs a station that assembles, tests or packs it. Parts come from machine shops, catalogue suppliers and the maker’s own workshop. Weeks before delivery go on chasing a few late items. A frame cannot be closed until one bracket arrives.

Machine estimate and cost plan

Estimate design hours, machined parts, bought-in components and assembly time, then keep the figure as the budget against which every purchase order and every fitter’s hour is later measured.

Machine bill of materials with revision

Hold each assembly, part and supplier item with its drawing revision, and show which items changed after release.

See the full industry workflow, reports and implementation plan →

The records that hold the operation together.

  • Machine enquiry and estimate. Estimate design hours, machined parts, bought-in components, assembly and test time on one sheet, and keep the figure as the project budget that posted cost is compared with later. No second copy.
  • Parts list with revision. Hold each assembly, machined part and catalogue item with its revision letter, and after release a change shows what moved and which open orders still carry the old drawing. Nothing is overwritten.
  • Machined part orders. Release a drawing set to the workshop or to an outside machinist, with the due date and the stock material named per plate. Returned shafts and brackets are booked in line by line. Short deliveries stay open.
  • Component purchasing and receipt. Order catalogue items straight from the released list, follow promised dates, and receive each pneumatic cylinder, proximity sensor or servo motor against the machine it belongs to. Gaps are visible.

Operational bottlenecks to check

The bill of materials changes during build

Designers revise parts while the workshop is already machining. Plates cut to the old drawing are scrapped and new ones ordered, and the difference sits in no single record, so the true cost of the revision is never read.

Bought-in parts arrive out of sequence

Cylinders arrive on Monday, sensors the week after, and the servo motors only when the supplier clears its own backlog. Fitters wait for a bracket. Or they build around the gap and strip it back later.

How work flows across this business

This module sits within a wider operating process. Use the sequence to identify the other teams and records affected by a change.

  1. 1. Concept and estimate

    The customer’s product drawing, target cycle rate and floor layout are logged, designers sketch a concept, and the estimate covers design, machined parts, bought-in items, assembly and test. Scope is fixed here.

  2. 2. Design release

    Assemblies, parts lists and the pneumatic and electrical schematics are released with a revision letter, and purchasing and the workshop receive only the released set. Drafts stay hidden.

  3. 3. Machining and buying

    Plates, shafts and brackets go to the workshop or to outside machinists with due dates. Catalogue items such as cylinders, servo motors and light curtains are ordered and received against the machine. Gaps show early.

  4. 4. Assembly

    Fitters build the frame and stations, electricians wire the panel and route the air piping, and programmers load the PLC sequence and HMI screens. Each stage logs its hours. Nothing moves on without a sign-off.

  5. 5. Run-off and buy-off

    The machine runs the customer’s own parts at the agreed cycle rate while output, rejects and every remark are recorded against the run-off sheet. Punch items close one by one.

  6. 6. Shipping and support

    The machine is dismantled, crated, shipped and installed on the customer’s floor, and the spares list and serial number stay on file for after-sales calls. Support starts from that file.

Industry reports to connect with

  • Machines on the floor by build stage and due date
  • Missing catalogue items per machine and supplier
  • Outside machining due and overdue by machinist
  • Estimate against posted cost by machine

Questions before implementation.

When should automation equipment manufacturers consider estimate/quotation management?

Use when scope and prices are agreed before an order. A buyer asks for pricing before confirming work.

What should we bring to the requirements discussion?

Bring anonymised examples of Items and units; Rates and tax settings; Approval terms. Show who creates, checks and changes each record. Use only records from an activity that meets the suitability conditions above.

Does this replace our existing business software?

The starting point is your current system and the gap you need to close. Keep itemised estimates and their approved revisions together. Configuration, a connected module or a custom build are evaluated against that gap before a replacement is proposed.

What is outside this module?

An estimate is not a tax invoice or proof of acceptance.

How are scope, price and rollout decided?

The proposal follows a review of your records, user roles, branches and existing software. Data migration, connections, training and support are scoped separately where needed. Earlier revisions remain available. Use this check when reviewing the first working version.

Related functions for automation equipment manufacturers.

    Talk to us

    Discuss estimate/quotation management for your business.

    Tell us which workflow needs attention and which systems your team uses. The next step is a requirements discussion and a written scope.

    What happens after you share your requirements

    1. We review your brief and the systems you already use.
    2. We clarify the workflow, missing information and the work to consider first.
    3. The proposed scope sets out the deliverables, responsibilities and dependencies.
    4. Review the scope and commercial terms before deciding whether to proceed.