Business solutions for Automation equipment manufacturers

Explore software for work such as “Servo and frequency drives”. Review each business function below, including when it fits and what to check before implementation.

Automation equipment manufacturers

How the business operates.

These machines are one-offs or short runs. The buyer describes a product and a target cycle time, and the maker designs a station that assembles, tests or packs it. Parts come from machine shops, catalogue suppliers and the maker’s own workshop. Weeks before delivery go on chasing a few late items. A frame cannot be closed until one bracket arrives.

Machine estimate and cost plan

Estimate design hours, machined parts, bought-in components and assembly time, then keep the figure as the budget against which every purchase order and every fitter’s hour is later measured.

Machine bill of materials with revision

Hold each assembly, part and supplier item with its drawing revision, and show which items changed after release.

Machined part orders

Issue drawings to the workshop or an outside machinist, set due dates and book the plate or shaft in when it returns from the machinist.

Component purchasing and receipt

Order catalogue items straight from the parts list, track promised dates and receive against the machine they belong to. A buyer sees every pneumatic fitting and sensor against the machine that needs it, and can reorder or substitute before the fitters run out of work.

Assembly and wiring stages

Plan frame build, station assembly, pneumatics, panel wiring and PLC programming as stages with named fitters and dates.

Buy-off and punch list

Record run-off tests with the customer’s parts, log each comment as a punch item, and close every one before shipment.

Spares and after-sales support

Keep a spare parts list for each machine delivered, such as belts and suction cups. Open service calls against its serial number.

Control programme and software versions

Control programmes, touchscreen files and robot paths are saved against the machine and its revision. Commissioning engineers pull the correct version for the site. Any change made on site is logged.

Customer requirement specification

The buyer’s user requirement list is recorded point by point. Each point links to the design response and to the test that proves it. Disputes are settled against that record.

Crating and shipping list

Machines are packed in crates by module, and each crate is numbered. The packing list records crate numbers, weights, contents and the module each one holds. Site engineers reassemble from it.

The records that hold the operation together.

  • Machine enquiry and estimate. Estimate design hours, machined parts, bought-in components, assembly and test time on one sheet, and keep the figure as the project budget that posted cost is compared with later. No second copy.
  • Parts list with revision. Hold each assembly, machined part and catalogue item with its revision letter, and after release a change shows what moved and which open orders still carry the old drawing. Nothing is overwritten.
  • Machined part orders. Release a drawing set to the workshop or to an outside machinist, with the due date and the stock material named per plate. Returned shafts and brackets are booked in line by line. Short deliveries stay open.
  • Component purchasing and receipt. Order catalogue items straight from the released list, follow promised dates, and receive each pneumatic cylinder, proximity sensor or servo motor against the machine it belongs to. Gaps are visible.
  • Assembly and wiring stages. Plan frame build, station assembly, air piping, panel wiring and PLC programming as stages, each with named fitters, dates and booked hours. A stage closes only on sign-off.
  • Project schedule. Lay design, machining, assembly and buy-off on a single timeline, so a late machined plate shows the exact stage it blocks and the fitters it idles. Dates move together.
  • Buy-off and punch list. Record run-off tests on the customer’s own parts and log each remark as a punch item with an owner and a closing date. Every item closes before the crate does.
  • Machine cost against estimate. Post design hours, workshop time and purchase invoices to the machine and read them beside the estimate while the build is under way. Overruns appear early.

Operational bottlenecks to check

The bill of materials changes during build

Designers revise parts while the workshop is already machining. Plates cut to the old drawing are scrapped and new ones ordered, and the difference sits in no single record, so the true cost of the revision is never read.

Bought-in parts arrive out of sequence

Cylinders arrive on Monday, sensors the week after, and the servo motors only when the supplier clears its own backlog. Fitters wait for a bracket. Or they build around the gap and strip it back later.

Outside machining is tracked by phone

Parts sent to outside machinists have no delivery date on record. Assembly week arrives. The shafts are still out, and the slip goes unseen until a fitter asks.

Buy-off issues are carried in memory

Run-off comments go on paper. Some are lost before the crate is nailed shut. A reject chute that was promised a change ships unchanged.

Real project cost is learned late

Design hours sit in one file, workshop time in another, and bought-in parts in the purchase ledger. Margin shows up after delivery. Every quote is a guess.

Follow the work across teams.

This is a planning flow. Confirm the steps, owners and approval rules against your actual operation.

  1. 1. Concept and estimate

    The customer’s product drawing, target cycle rate and floor layout are logged, designers sketch a concept, and the estimate covers design, machined parts, bought-in items, assembly and test. Scope is fixed here.

  2. 2. Design release

    Assemblies, parts lists and the pneumatic and electrical schematics are released with a revision letter, and purchasing and the workshop receive only the released set. Drafts stay hidden.

  3. 3. Machining and buying

    Plates, shafts and brackets go to the workshop or to outside machinists with due dates. Catalogue items such as cylinders, servo motors and light curtains are ordered and received against the machine. Gaps show early.

  4. 4. Assembly

    Fitters build the frame and stations, electricians wire the panel and route the air piping, and programmers load the PLC sequence and HMI screens. Each stage logs its hours. Nothing moves on without a sign-off.

  5. 5. Run-off and buy-off

    The machine runs the customer’s own parts at the agreed cycle rate while output, rejects and every remark are recorded against the run-off sheet. Punch items close one by one.

  6. 6. Shipping and support

    The machine is dismantled, crated, shipped and installed on the customer’s floor, and the spares list and serial number stay on file for after-sales calls. Support starts from that file.

Roles and responsibility boundaries.

For design engineers

Release assemblies with a revision letter and see which purchase orders and machined plates depend on each release before a change goes out. Revisions carry a reason.

For buyers

Raise orders from the released parts list, watch the dates suppliers promised, and see what each machine still lacks before the fitters ask. No chasing by phone.

For workshop and fitters

Open the stage list for a machine, mark work done, and see which cylinders, brackets and plates have arrived at the bench. Guesswork stops.

For project managers

Read schedule, cost against estimate and open punch items for every machine in one place, and spot the build that is sliding. One screen.

For service engineers

Find a delivered machine by serial number and see its parts list, spares sold and past calls before ringing the customer back. History is in hand.

Reports your managers need.

  • Machines on the floor by build stage and due date
  • Missing catalogue items per machine and supplier
  • Outside machining due and overdue by machinist
  • Estimate against posted cost by machine
  • Open punch items per machine, oldest first
  • Warranty expiry by delivered serial number
  • Spares sold by machine model

Connections to scope

  • Email
  • Document storage
  • Supplier order email
  • Accounting export
  • SMS

Confirm data access, record ownership and the exchange method for each connection. Inclusion here does not mean every connection is available in a standard package.

Setup decisions and adoption risks.

Use these requirements to plan phases, data migration and user training. Agree the release sequence after reviewing your current systems.

Parts families and suppliers

Machined part types, catalogue families such as cylinders and linear guides, and preferred suppliers follow how your buyers source parts.

Estimate templates

Design, assembly and test hour norms by machine type, from rotary indexing tables to vision inspection stations, follow how your engineers estimate.

Run-off sheets

Run-off steps, output targets and punch item fields mirror the buy-off procedure your project managers already follow at the customer’s plant.

Running machines brought in

Live projects, drawing registers and spares lists are imported from the sheets your office keeps now, so no machine starts from a blank record.

Hosting

GullySystem runs the hosting for the design office and the workshop alike. Template edits come from GullySystem staff.

Limitations to settle before implementation

  • A firm that builds only electrical control panels is better served by PLC Panel Builder Management Software.
  • A plant that makes the same product in high volume is better served by Manufacturing Production Management Software.

Modules to consider first.

These functions connect to the operating model above. Confirm each one against the work your business actually runs.

Choose the operation you want to improve.

Use these activities to explain your scope. Your business does not need every function in the directory.

  • Servo and frequency drives
  • PLCs and HMIs
  • Sensors and encoders
  • Power supplies and relays
  • Motion control and actuators
  • Distributor stocking and training
  • Application engineering support
  • OEM design-in and repeat supply
  • Warranty, repair and replacement handling
Talk to us

Start with the problem your team can describe.

Bring a sample record and show where information is copied, missed or waiting for approval. Scope the first useful change from there.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.