Skip to main content
GullySystem
Home services

Lead Management for Electrical contractors

Give each enquiry an owner, status and next action.

CRM

Does this function belong in your operation?

Use when enquiries arrive through several channels or follow-ups are missed.

A prospective buyer makes contact.

Enquiries arrive from builders, architects and facility managers for new wiring or a rewire. Every one is logged with the site address and scope. Site visits are booked from the list.

Bring the records the workflow depends on.

  • Lead sources
  • Assignment rules
  • Follow-up stages

Outputs to check

  • Assigned enquiry register
  • Due follow-up list
  • Qualification and closure record

Follow the lead management workflow.

Use this sequence to compare your current process with the proposed module. Agree the owner, permission and exception at each step.

  1. 1. Capture the enquiry

    Record the prospect's requirement and source.

  2. 2. Check duplicates

    Review matching contacts while preserving distinct needs.

  3. 3. Assign ownership

    Set the responsible person and next action.

  4. 4. Qualify the requirement

    Record discussions and the reason to progress, pause or close.

  5. 5. Handover to sales

    Create the relevant opportunity or order reference without losing enquiry history.

Who uses the module, and who approves?

Keep responsibilities distinct even when one person holds more than one role.

Sales executive

Opens today’s call list, rings, writes one line and sets the next date.

Sales head or branch manager

Reviews unassigned or overdue leads and transfers actions when a salesperson is unavailable.

Owner

Reviews enquiry sources and the orders linked to them, using the recorded outcome of each lead.

Decide how exceptions are handled.

These business rules belong in configuration and testing. A normal transaction alone does not demonstrate that the workflow is ready.

Repeated enquiry

Review matching contact details and preserve distinct requirements before merging.

Owner unavailable

Reassign the next action with the interaction history intact.

Prospect requests no contact

Record the restriction and stop the relevant follow-up activity under your communication policy.

Can this work independently?

Lead tracking can start with manual entries or file imports. Website forms and messaging channels are optional supported connections. Qualified leads hand over to opportunities or orders using a retained reference; qualification itself does not create revenue or a confirmed customer commitment.

Systems and records it connects with

  • Opportunity management: Deal requirements, values, stages and decision history.
  • Quote and proposal management: Commercial proposal versions and acceptance details.
  • Trade portals and business directories: Permitted enquiry imports retaining their original source references.
  • WhatsApp: Permitted message content and channel delivery responses.

Configure, test and introduce the workflow.

  • Name every channel enquiries use. A note comes back with the sources and the fields each can fill.
  • Name your hot, warm and later stages and your reasons for dropping. They appear on a screen. Try them. Share the sheets executives keep. The trial import flags duplicates for the sales head to resolve.
  • Executives practise logging a call and setting a next date. Each gets a note for the phone. The review meeting opens with the untouched list. After a cycle, source figures are read together.

Check the result before rollout.

Apply these checks to a sample from the agreed workflow, then repeat with an exception. Keep the expected result beside the test record.

  • Active leads have owners.
  • Duplicates can be reviewed together.
  • Closed leads retain reasons.
Electrical contractors

How the business operates.

Electrical work is billed in points, metres and board counts, at rates fixed when copper was priced last week, long before the second fix begins. A hundred metres miscounted on one floor is small. On eight floors it becomes a month’s profit, because the same error repeats in every riser, every tray run and every drum that goes out half used.

BOQ with point and metre rates

Price light points, cable runs and panels from your rate list, or line by line against a client’s BOQ, and revise the rate list whenever copper moves.

Store room and site material ledger

Track cable by drum and metre, with switchgear and conduit issued against each site indent and returned, which leaves a running balance for every site.

See the full industry workflow, reports and implementation plan →

The records that hold the operation together.

  • Enquiries and site surveys. Record each enquiry, whether it comes from a builder, a reference or a tender notice. Keep the survey visit, connected load, point count, drawings received and the next follow-up date together, so that no tender lapses unanswered.
  • Quotations and estimates. Build quotations from your own rate list of standard items, by point, item or area, and price a client’s bill of quantities (BOQ) line by line. Revisions and approvals are recorded for every version.
  • Site jobs and work orders. Run each accepted quotation as a site job with floors, work stages, a team, a supervisor and a snag list. Each floor shows which DBs are wired, which are tested and what remains.
  • Material issue and site stock. Issue cable, conduit, MCBs, MCCBs, panels and fittings against a named site, and return unused drums and boxes to the store, so every site carries its own material cost. Stock below reorder level is flagged for the purchase clerk.

Operational bottlenecks to check

Metres do not reconcile

A drum of 4 core armoured cable goes to site, part of it returns, and the offcut is never measured before it moves to the next job. Nobody owns the offcut, so nobody answers for it.

Copper price erodes margin

The BOQ was priced in January against the old copper rate, yet the cable bought in June costs more per metre. The difference comes out of your own pocket, line after line, and the client’s engineer will not reopen the rate.

How work flows across this business

This module sits within a wider operating process. Use the sequence to identify the other teams and records affected by a change.

  1. 1. Enquiry and survey

    An enquiry arrives by phone, a reference, a builder’s call or a tender notice. A site survey is booked, and the connected load, point count, single-line diagram and drawings are noted against that enquiry before anyone prices it.

  2. 2. Quotation

    A quotation is built from your rate list by item or by point, or against the client’s bill of quantities, and the client revises it more than once. Every version is kept, with its approval.

  3. 3. Site job

    An accepted quotation becomes a site job. A technician team, a supervisor and a work plan by floor or area are attached from the first day. The plan shows conduit, wiring and fixtures as separate stages.

  4. 4. Material and labour

    Cable, conduit, switchgear and fittings are issued to the site from the store. Technician attendance is booked to the same job, so labour and material cost sit side by side for every floor.

  5. 5. Measurement and billing

    Measured work is entered by area as a measurement book record. It becomes a running account bill with tax added, and advances and retention are carried on the account until the builder finally releases them.

  6. 6. Handover and service

    The job closes with its snag list, insulation and earthing test results and a handover record. A service contract or call-back schedule starts if the client takes one, with the first visit dated.

Industry reports to connect with

  • Quotations and tenders open, won and lost by client
  • Site cost against billing for each job
  • Cable, conduit and switchgear issued to each site, and stock below reorder
  • Technician and wireman attendance and labour cost by site

Questions before implementation.

When should electrical contractors consider lead management?

Use when enquiries arrive through several channels or follow-ups are missed. A prospective buyer makes contact.

What should we bring to the requirements discussion?

Bring anonymised examples of Lead sources; Assignment rules; Follow-up stages. Show who creates, checks and changes each record. Use only records from an activity that meets the suitability conditions above.

Does this replace our existing business software?

The starting point is your current system and the gap you need to close. Give each enquiry an owner, status and next action. Configuration, a connected module or a custom build are evaluated against that gap before a replacement is proposed.

What is outside this module?

Lead tracking organises enquiries already received. Demand generation and the buyer’s sales decision remain separate activities.

How are scope, price and rollout decided?

The proposal follows a review of your records, user roles, branches and existing software. Data migration, connections, training and support are scoped separately where needed. Active leads have owners. Use this check when reviewing the first working version.

Related functions for electrical contractors.

    Talk to us

    Discuss lead management for your business.

    Tell us which workflow needs attention and which systems your team uses. The next step is a requirements discussion and a written scope.

    What happens after you share your requirements

    1. We review your brief and the systems you already use.
    2. We clarify the workflow, missing information and the work to consider first.
    3. The proposed scope sets out the deliverables, responsibilities and dependencies.
    4. Review the scope and commercial terms before deciding whether to proceed.

    Start with your requirements

    Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

    Share your requirements