Skip to main content
GullySystem
Home services

Business solutions for Electrical contractors

Explore software for work such as “Apartment and villa electrification for builders”. Review each business function below, including when it fits and what to check before implementation.

Electrical contractors

How the business operates.

Electrical work is billed in points, metres and board counts, at rates fixed when copper was priced last week, long before the second fix begins. A hundred metres miscounted on one floor is small. On eight floors it becomes a month’s profit, because the same error repeats in every riser, every tray run and every drum that goes out half used.

BOQ with point and metre rates

Price light points, cable runs and panels from your rate list, or line by line against a client’s BOQ, and revise the rate list whenever copper moves.

Store room and site material ledger

Track cable by drum and metre, with switchgear and conduit issued against each site indent and returned, which leaves a running balance for every site.

Measurement sheet and running account bills

Feed points and metres measured by floor into the monthly bill, with mobilisation advance and retention carried on the account. Each bill shows as approved or pending.

Teams and piece-rate work

Record attendance by site and points wired by each gang, so weekly payment matches the work done and a foreman cannot overstate a count of fan points or sockets.

Testing and approval records

Keep insulation, earth and load readings with photos of each panel in the project file. The product has no test register of its own, so this file is built during implementation around your inspector’s format.

Maintenance contracts and call-backs

Hold annual maintenance contracts for offices and factories, and log every call-back raised during the defect liability period against the project it came from.

Tool and tester register

Insulation testers, clamp meters and drills are listed with an issue holder and a calibration date. Site engineers sign tools out. The store flags a tester whose certificate has lapsed.

Subcontractor work orders

Cable pulling, trenching and earthing jobs go to outside gangs. Orders carry the quantity, rate and site, and the supervisor certifies what was finished. Payment follows the certificate.

Drawing and variation file

Site drawings are stored by revision, alongside each client instruction that adds or removes points. The project manager prices a variation from it. Billing then reflects the extra work.

Supply connection tracker

Utility connection applications, inspection dates and completion certificates are tracked for each project. A coordinator sees which office holds each file and who is chasing it. Handover waits for the paperwork.

The records that hold the operation together.

  • Enquiries and site surveys. Record each enquiry, whether it comes from a builder, a reference or a tender notice. Keep the survey visit, connected load, point count, drawings received and the next follow-up date together, so that no tender lapses unanswered.
  • Quotations and estimates. Build quotations from your own rate list of standard items, by point, item or area, and price a client’s bill of quantities (BOQ) line by line. Revisions and approvals are recorded for every version.
  • Site jobs and work orders. Run each accepted quotation as a site job with floors, work stages, a team, a supervisor and a snag list. Each floor shows which DBs are wired, which are tested and what remains.
  • Material issue and site stock. Issue cable, conduit, MCBs, MCCBs, panels and fittings against a named site, and return unused drums and boxes to the store, so every site carries its own material cost. Stock below reorder level is flagged for the purchase clerk.
  • Technician teams and attendance. Assign electricians, wiremen and helpers to sites, mark daily attendance, and see labour cost for each job. Overtime, advances and the helper’s half-days follow the same entries.
  • Measurements and running bills. Enter measured work by area as the measurement book (MB) record behind each bill. Raise running account bills (RA bills) with advances, deductions and retention, and keep the MB beside every bill it supports, ready for the builder’s engineer.
  • Tax billing and collections. Issue tax invoices for site jobs, supply-only material sales and service work. Track receipts and balances for each client, with the oldest invoice first, and see which builder is holding retention.
  • Service contracts and call-backs. Keep maintenance contracts, visit schedules and fault calls, with the technician and the work done recorded. A transformer, generator or panel inspection due next month appears on this month’s list, so the visit is booked before the client asks.

Operational bottlenecks to check

Metres do not reconcile

A drum of 4 core armoured cable goes to site, part of it returns, and the offcut is never measured before it moves to the next job. Nobody owns the offcut, so nobody answers for it.

Copper price erodes margin

The BOQ was priced in January against the old copper rate, yet the cable bought in June costs more per metre. The difference comes out of your own pocket, line after line, and the client’s engineer will not reopen the rate.

Point counts are disputed

The client’s engineer counts fewer socket, fan and light points than your supervisor on the same floor, so the bill waits for a joint measurement on site. Both parties walk the corridors with a marked drawing.

Test reports go missing

Megger readings are scribbled on the back of a drawing, next to a tea ring and a half-finished sketch of a panel. The inspector asks for them on the day, the sheet cannot be found, and the connection is delayed by a repeat test.

Follow the work across teams.

This is a planning flow. Confirm the steps, owners and approval rules against your actual operation.

  1. 1. Enquiry and survey

    An enquiry arrives by phone, a reference, a builder’s call or a tender notice. A site survey is booked, and the connected load, point count, single-line diagram and drawings are noted against that enquiry before anyone prices it.

  2. 2. Quotation

    A quotation is built from your rate list by item or by point, or against the client’s bill of quantities, and the client revises it more than once. Every version is kept, with its approval.

  3. 3. Site job

    An accepted quotation becomes a site job. A technician team, a supervisor and a work plan by floor or area are attached from the first day. The plan shows conduit, wiring and fixtures as separate stages.

  4. 4. Material and labour

    Cable, conduit, switchgear and fittings are issued to the site from the store. Technician attendance is booked to the same job, so labour and material cost sit side by side for every floor.

  5. 5. Measurement and billing

    Measured work is entered by area as a measurement book record. It becomes a running account bill with tax added, and advances and retention are carried on the account until the builder finally releases them.

  6. 6. Handover and service

    The job closes with its snag list, insulation and earthing test results and a handover record. A service contract or call-back schedule starts if the client takes one, with the first visit dated.

Roles and responsibility boundaries.

For owners

See quotations open, cost against billing for each site, client balances and payments due to subcontractors, without waiting for month end or phoning a single supervisor.

For electrical estimators and the office

Prepare quotations, follow enquiries and tenders, raise running bills and invoices, and keep client accounts in order from the measurement books that the site supervisors send in each week.

For site supervisors

See the work plan for the site. Request material, mark attendance and enter measurements before leaving the floor.

For store keepers

Receive cable, conduit and switchgear. Issue it to sites, take returns and see what is below reorder level.

For technicians

See the site assigned for the day, the work to be done and any call-back raised against you, with the address and the client’s contact on one screen.

Reports your managers need.

  • Quotations and tenders open, won and lost by client
  • Site cost against billing for each job
  • Cable, conduit and switchgear issued to each site, and stock below reorder
  • Technician and wireman attendance and labour cost by site
  • Running bills raised, approved and pending, with the MB behind each
  • Client balances, mobilisation and other advances, and retention held
  • Service contracts and inspection visits due

Connections to scope

  • WhatsApp
  • SMS
  • Email
  • Bank transfer and payment gateway
  • Accounting package export
  • Biometric attendance

Confirm data access, record ownership and the exchange method for each connection. Inclusion here does not mean every connection is available in a standard package.

Setup decisions and adoption risks.

Use these requirements to plan phases, data migration and user training. Agree the release sequence after reviewing your current systems.

Your rate list and point rates

Item rates, point rates, labour rates and the way you price a floor go in first. We revise the rate list for you when copper, cable or MCB prices move.

Material master

Cable sizes, conduit, switchgear, DBs, glands, lugs, fittings and the units you issue in, such as drums, coils and metres, are set up from your store first.

Billing and measurement formats

Running bill and invoice formats follow what your clients and builders accept. Tax treatment is for your accountant to confirm.

Clients and open sites migrated

Client lists, open sites, stock balances and unpaid bills arrive from your existing registers or sheets.

Hosting and changes

GullySystem hosts the system, so the office, store and sites work on the same records. We carry out edits to rates and quotation formats for you.

Limitations to settle before implementation

  • A single electrician who takes small repair calls and is paid in cash needs a notebook and a payment app.
  • Firms that mainly build and manage whole buildings will find Construction Project Management Software closer to their work.

Modules to consider first.

These functions connect to the operating model above. Confirm each one against the work your business actually runs.

Choose the operation you want to improve.

Use these activities to explain your scope. Your business does not need every function in the directory.

  • Apartment and villa electrification for builders
  • Office and retail fit-out electrical work
  • Factory expansions and shed electrification
  • HT connections, transformers and substations
  • Electrical maintenance contracts for apartments
  • Home rewiring and safety audits
  • Rooftop solar and EV charger installation
  • DG set, UPS and power backup systems
  • Government and institutional electrical tenders
Talk to us

Start with the problem your team can describe.

Bring a sample record and show where information is copied, missed or waiting for approval. Scope the first useful change from there.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements