Skip to main content
GullySystem
Home services

Attendance & Time Tracking for Electrical contractors

Record working time, absence and approved attendance corrections.

Project Management

Does this function belong in your operation?

Use when staff attendance or working time affects pay, deployment or reporting.

A shift starts, ends or needs correction.

Wiremen, helpers and the site foreman mark attendance by gang at each project site. Overtime and half days feed the piece-rate sheet. Payroll sees one figure per person.

Bring the records the workflow depends on.

  • Employee and shift list
  • Attendance sources
  • Overtime and correction rules

Outputs to check

  • Approved attendance register
  • Correction and overtime history
  • Payroll-ready period totals

Follow the attendance & time tracking workflow.

Use this sequence to compare your current process with the proposed module. Agree the owner, permission and exception at each step.

  1. 1. Assign the work calendar

    Set employee shifts, breaks and approved attendance rules.

  2. 2. Capture events

    Record attendance from the agreed manual or device source.

  3. 3. Review exceptions

    Resolve missing events, overnight shifts and disputed entries.

  4. 4. Approve the period

    Confirm corrections and payable overtime through the responsible supervisor.

  5. 5. Handover totals

    Send the checked attendance to payroll or reporting and retain later adjustments separately.

Who uses the module, and who approves?

Keep responsibilities distinct even when one person holds more than one role.

Employee or supervisor

Records attendance and reports missing or incorrect entries with the supporting explanation.

HR administrator

Checks shift assignments, approves corrections and closes the period after unresolved entries are reviewed.

Payroll preparer

Uses the approved attendance totals and returns unexplained differences before calculating pay.

Decide how exceptions are handled.

These business rules belong in configuration and testing. A normal transaction alone does not demonstrate that the workflow is ready.

Missing punch

Ask for a correction with evidence and approval rather than assuming a full working day.

Overnight shift

Apply the assigned shift boundary instead of splitting attendance at midnight without review.

Unapproved overtime

Keep recorded extra time separate from overtime approved for payment.

Can this work independently?

Attendance can use manual entries or imported device records. Employee and shift identifiers are required; payroll, leave and project time are separate processes. Device integration must define how missing, duplicated or delayed events are reconciled before a period closes.

Systems and records it connects with

  • Payroll management: Approved pay inputs, deduction calculations and payment instructions.
  • Leave and holiday management: Approved absence and branch calendar information.
  • Project time tracking: Approved task hours and their billable classification.
  • Biometric attendance devices: Device event imports and rejected or duplicated attendance events.

Configure, test and introduce the workflow.

  • We go through the register, the sheets and the machine reports in use today. You supply samples from a recent month. You get back a written note of how attendance flows.
  • Shifts, grace periods, half day and overtime rules are listed in plain words. You confirm them. A rules sheet comes back that you can show staff. We look at the biometric model and at each place where marking happens. You say who marks where. A note returns on what connects directly and what needs a file.
  • Last month’s records are loaded into a trial screen. The admin team compares the result with the sheet they really used. Differences are discussed. Supervisors and the admin team practise marking and correcting. You choose the start date. The old register retires after a clean month close.

Check the result before rollout.

Apply these checks to a sample from the agreed workflow, then repeat with an exception. Keep the expected result beside the test record.

  • Overnight shifts use the correct dates.
  • Corrections retain the approver.
  • Approved totals reconcile with the attendance period.
Electrical contractors

How the business operates.

Electrical work is billed in points, metres and board counts, at rates fixed when copper was priced last week, long before the second fix begins. A hundred metres miscounted on one floor is small. On eight floors it becomes a month’s profit, because the same error repeats in every riser, every tray run and every drum that goes out half used.

BOQ with point and metre rates

Price light points, cable runs and panels from your rate list, or line by line against a client’s BOQ, and revise the rate list whenever copper moves.

Store room and site material ledger

Track cable by drum and metre, with switchgear and conduit issued against each site indent and returned, which leaves a running balance for every site.

See the full industry workflow, reports and implementation plan →

The records that hold the operation together.

  • Enquiries and site surveys. Record each enquiry, whether it comes from a builder, a reference or a tender notice. Keep the survey visit, connected load, point count, drawings received and the next follow-up date together, so that no tender lapses unanswered.
  • Quotations and estimates. Build quotations from your own rate list of standard items, by point, item or area, and price a client’s bill of quantities (BOQ) line by line. Revisions and approvals are recorded for every version.
  • Site jobs and work orders. Run each accepted quotation as a site job with floors, work stages, a team, a supervisor and a snag list. Each floor shows which DBs are wired, which are tested and what remains.
  • Material issue and site stock. Issue cable, conduit, MCBs, MCCBs, panels and fittings against a named site, and return unused drums and boxes to the store, so every site carries its own material cost. Stock below reorder level is flagged for the purchase clerk.

Operational bottlenecks to check

Metres do not reconcile

A drum of 4 core armoured cable goes to site, part of it returns, and the offcut is never measured before it moves to the next job. Nobody owns the offcut, so nobody answers for it.

Copper price erodes margin

The BOQ was priced in January against the old copper rate, yet the cable bought in June costs more per metre. The difference comes out of your own pocket, line after line, and the client’s engineer will not reopen the rate.

How work flows across this business

This module sits within a wider operating process. Use the sequence to identify the other teams and records affected by a change.

  1. 1. Enquiry and survey

    An enquiry arrives by phone, a reference, a builder’s call or a tender notice. A site survey is booked, and the connected load, point count, single-line diagram and drawings are noted against that enquiry before anyone prices it.

  2. 2. Quotation

    A quotation is built from your rate list by item or by point, or against the client’s bill of quantities, and the client revises it more than once. Every version is kept, with its approval.

  3. 3. Site job

    An accepted quotation becomes a site job. A technician team, a supervisor and a work plan by floor or area are attached from the first day. The plan shows conduit, wiring and fixtures as separate stages.

  4. 4. Material and labour

    Cable, conduit, switchgear and fittings are issued to the site from the store. Technician attendance is booked to the same job, so labour and material cost sit side by side for every floor.

  5. 5. Measurement and billing

    Measured work is entered by area as a measurement book record. It becomes a running account bill with tax added, and advances and retention are carried on the account until the builder finally releases them.

  6. 6. Handover and service

    The job closes with its snag list, insulation and earthing test results and a handover record. A service contract or call-back schedule starts if the client takes one, with the first visit dated.

Industry reports to connect with

  • Quotations and tenders open, won and lost by client
  • Site cost against billing for each job
  • Cable, conduit and switchgear issued to each site, and stock below reorder
  • Technician and wireman attendance and labour cost by site

Questions before implementation.

When should electrical contractors consider attendance & time tracking?

Use when staff attendance or working time affects pay, deployment or reporting. A shift starts, ends or needs correction.

What should we bring to the requirements discussion?

Bring anonymised examples of Employee and shift list; Attendance sources; Overtime and correction rules. Show who creates, checks and changes each record. Use only records from an activity that meets the suitability conditions above.

Does this replace our existing business software?

The starting point is your current system and the gap you need to close. Record working time, absence and approved attendance corrections. Configuration, a connected module or a custom build are evaluated against that gap before a replacement is proposed.

What is outside this module?

Location tracking, biometrics and payroll connections require agreed scope and appropriate permissions.

How are scope, price and rollout decided?

The proposal follows a review of your records, user roles, branches and existing software. Data migration, connections, training and support are scoped separately where needed. Overnight shifts use the correct dates. Use this check when reviewing the first working version.

Talk to us

Discuss attendance & time tracking for your business.

Tell us which workflow needs attention and which systems your team uses. The next step is a requirements discussion and a written scope.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements