Attendance & Time Tracking for Electrical contractors
Record working time, absence and approved attendance corrections.
Does this function belong in your operation?
Use when staff attendance or working time affects pay, deployment or reporting.
A shift starts, ends or needs correction.
Wiremen, helpers and the site foreman mark attendance by gang at each project site. Overtime and half days feed the piece-rate sheet. Payroll sees one figure per person.
Bring the records the workflow depends on.
- Employee and shift list
- Attendance sources
- Overtime and correction rules
Outputs to check
- Approved attendance register
- Correction and overtime history
- Payroll-ready period totals
Follow the attendance & time tracking workflow.
Use this sequence to compare your current process with the proposed module. Agree the owner, permission and exception at each step.
Who uses the module, and who approves?
Keep responsibilities distinct even when one person holds more than one role.
Decide how exceptions are handled.
These business rules belong in configuration and testing. A normal transaction alone does not demonstrate that the workflow is ready.
Can this work independently?
Attendance can use manual entries or imported device records. Employee and shift identifiers are required; payroll, leave and project time are separate processes. Device integration must define how missing, duplicated or delayed events are reconciled before a period closes.
Systems and records it connects with
- Payroll management: Approved pay inputs, deduction calculations and payment instructions.
- Leave and holiday management: Approved absence and branch calendar information.
- Project time tracking: Approved task hours and their billable classification.
- Biometric attendance devices: Device event imports and rejected or duplicated attendance events.
Configure, test and introduce the workflow.
- We go through the register, the sheets and the machine reports in use today. You supply samples from a recent month. You get back a written note of how attendance flows.
- Shifts, grace periods, half day and overtime rules are listed in plain words. You confirm them. A rules sheet comes back that you can show staff. We look at the biometric model and at each place where marking happens. You say who marks where. A note returns on what connects directly and what needs a file.
- Last month’s records are loaded into a trial screen. The admin team compares the result with the sheet they really used. Differences are discussed. Supervisors and the admin team practise marking and correcting. You choose the start date. The old register retires after a clean month close.
Check the result before rollout.
Apply these checks to a sample from the agreed workflow, then repeat with an exception. Keep the expected result beside the test record.
- Overnight shifts use the correct dates.
- Corrections retain the approver.
- Approved totals reconcile with the attendance period.
How the business operates.
Electrical work is billed in points, metres and board counts, at rates fixed when copper was priced last week, long before the second fix begins. A hundred metres miscounted on one floor is small. On eight floors it becomes a month’s profit, because the same error repeats in every riser, every tray run and every drum that goes out half used.
The records that hold the operation together.
- Enquiries and site surveys. Record each enquiry, whether it comes from a builder, a reference or a tender notice. Keep the survey visit, connected load, point count, drawings received and the next follow-up date together, so that no tender lapses unanswered.
- Quotations and estimates. Build quotations from your own rate list of standard items, by point, item or area, and price a client’s bill of quantities (BOQ) line by line. Revisions and approvals are recorded for every version.
- Site jobs and work orders. Run each accepted quotation as a site job with floors, work stages, a team, a supervisor and a snag list. Each floor shows which DBs are wired, which are tested and what remains.
- Material issue and site stock. Issue cable, conduit, MCBs, MCCBs, panels and fittings against a named site, and return unused drums and boxes to the store, so every site carries its own material cost. Stock below reorder level is flagged for the purchase clerk.
Operational bottlenecks to check
Metres do not reconcile
A drum of 4 core armoured cable goes to site, part of it returns, and the offcut is never measured before it moves to the next job. Nobody owns the offcut, so nobody answers for it.
Copper price erodes margin
The BOQ was priced in January against the old copper rate, yet the cable bought in June costs more per metre. The difference comes out of your own pocket, line after line, and the client’s engineer will not reopen the rate.
How work flows across this business
This module sits within a wider operating process. Use the sequence to identify the other teams and records affected by a change.
1. Enquiry and survey
An enquiry arrives by phone, a reference, a builder’s call or a tender notice. A site survey is booked, and the connected load, point count, single-line diagram and drawings are noted against that enquiry before anyone prices it.
2. Quotation
A quotation is built from your rate list by item or by point, or against the client’s bill of quantities, and the client revises it more than once. Every version is kept, with its approval.
3. Site job
An accepted quotation becomes a site job. A technician team, a supervisor and a work plan by floor or area are attached from the first day. The plan shows conduit, wiring and fixtures as separate stages.
4. Material and labour
Cable, conduit, switchgear and fittings are issued to the site from the store. Technician attendance is booked to the same job, so labour and material cost sit side by side for every floor.
5. Measurement and billing
Measured work is entered by area as a measurement book record. It becomes a running account bill with tax added, and advances and retention are carried on the account until the builder finally releases them.
6. Handover and service
The job closes with its snag list, insulation and earthing test results and a handover record. A service contract or call-back schedule starts if the client takes one, with the first visit dated.
Industry reports to connect with
- Quotations and tenders open, won and lost by client
- Site cost against billing for each job
- Cable, conduit and switchgear issued to each site, and stock below reorder
- Technician and wireman attendance and labour cost by site
Questions before implementation.
When should electrical contractors consider attendance & time tracking?
Use when staff attendance or working time affects pay, deployment or reporting. A shift starts, ends or needs correction.
What should we bring to the requirements discussion?
Bring anonymised examples of Employee and shift list; Attendance sources; Overtime and correction rules. Show who creates, checks and changes each record. Use only records from an activity that meets the suitability conditions above.
Does this replace our existing business software?
The starting point is your current system and the gap you need to close. Record working time, absence and approved attendance corrections. Configuration, a connected module or a custom build are evaluated against that gap before a replacement is proposed.
What is outside this module?
Location tracking, biometrics and payroll connections require agreed scope and appropriate permissions.
How are scope, price and rollout decided?
The proposal follows a review of your records, user roles, branches and existing software. Data migration, connections, training and support are scoped separately where needed. Overnight shifts use the correct dates. Use this check when reviewing the first working version.
Related functions for electrical contractors.
Discuss attendance & time tracking for your business.
Tell us which workflow needs attention and which systems your team uses. The next step is a requirements discussion and a written scope.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements