Dashboards and KPIs for Industrial automation companies
Present agreed business measures from their underlying records.
Does this function belong in your operation?
Use when decisions depend on a small set of consistently defined operational measures.
Managers need a consistent view of current performance.
Managers see projects by stage, panels awaiting parts and invoices held by retention. A project head spots a commissioning that has overrun. The service desk shows open calls by customer.
Bring the records the workflow depends on.
- Metric definitions
- Source records
- Viewer access and refresh requirements
Outputs to check
- Defined operational scorecard
- Source-reconciled drill-down
- Data-refresh and exception status
Follow the dashboards and kpis workflow.
Use this sequence to compare your current process with the proposed module. Agree the owner, permission and exception at each step.
Who uses the module, and who approves?
Keep responsibilities distinct even when one person holds more than one role.
Decide how exceptions are handled.
These business rules belong in configuration and testing. A normal transaction alone does not demonstrate that the workflow is ready.
Can this work independently?
A dashboard requires the source records for each displayed measure. It can use reviewed files rather than live connections, provided the data date is visible. Report builders shape detail, while operational systems own transactions; dashboard filters must not alter source records or hide missing data.
Systems and records it connects with
- Report builder: Saved field selections, filters and permitted report outputs.
- Invoice management: Issued invoice references, line amounts and outstanding balances.
- Stock tracking and alerts: Item-location quantities and authorised stock movements.
- Your accounting software: Posted financial entries and reconciliation references.
Configure, test and introduce the workflow.
- You tell us which figures you chase and which you ignore. You get a written list of tiles proposed for each role. Fewer tiles work better.
- We locate where each figure lives in your current records. You get a note naming the source and any gaps. Gaps are listed honestly. A first dashboard is built on your data for a few roles. You try it, and move or remove tiles.
- Periods, targets and viewing rights are agreed. Each person is given a login that opens only their screen. The scheduled summaries are turned on for a small group. The group reports back on timing and content.
Check the result before rollout.
Apply these checks to a sample from the agreed workflow, then repeat with an exception. Keep the expected result beside the test record.
- Measures reconcile with source totals.
- Filters use consistent definitions.
- Missing data is distinguishable from zero.
How the business operates.
Automation projects rarely end when the panel ships. Commissioning, punch points, operator training and retention held until final acceptance all follow, with no purchase order of their own.
The records that hold the operation together.
- Customer specification, signal list and offer revision
- Project bill of materials and component allocation
- Drawing and control-program version
- Factory acceptance, commissioning and site acceptance record
Operational bottlenecks to check
Parts move between projects
A drive is pulled for an urgent job, and the first project stops at FAT in front of the customer. The customer flew in for nothing.
Retention is not followed up
Final acceptance happens, and the held amount sits unclaimed because no date was set against it. A year later, asking for it is awkward.
How work flows across this business
This module sits within a wider operating process. Use the sequence to identify the other teams and records affected by a change.
1. Define and price the requirement
Record the agreed signals, equipment and scope assumptions with the technical offer and its revision.
2. Release project materials and design
Link the customer order to the released drawings and bill of materials. Keep approved variations distinct from the original scope.
3. Build and record factory acceptance
Record the workshop stages and evidence from the agreed factory acceptance process, including open observations.
4. Commission and hand over
Track site work, approved changes and site acceptance evidence. Retain the handed-over program and drawing versions.
5. Reconcile and support the project
Follow milestone acceptance, billing and retention. Link warranty or service requests to the delivered configuration rather than an engineer’s private files.
Industry reports to connect with
- Project material shortages and design revisions
- Factory and site acceptance observations still open
- Commissioning effort and approved variations
- Milestone billing, retention and service follow-up
Questions before implementation.
When should industrial automation companies consider dashboards and kpis?
Use when decisions depend on a small set of consistently defined operational measures. Managers need a consistent view of current performance.
What should we bring to the requirements discussion?
Bring anonymised examples of Metric definitions; Source records; Viewer access and refresh requirements. Show who creates, checks and changes each record. Use only records from an activity that meets the suitability conditions above.
Does this replace our existing business software?
The starting point is your current system and the gap you need to close. Present agreed business measures from their underlying records. Configuration, a connected module or a custom build are evaluated against that gap before a replacement is proposed.
What is outside this module?
A dashboard reports recorded activity. Managers must investigate causes and decide actions before attributing a change to business performance.
How are scope, price and rollout decided?
The proposal follows a review of your records, user roles, branches and existing software. Data migration, connections, training and support are scoped separately where needed. Measures reconcile with source totals. Use this check when reviewing the first working version.
Related functions for industrial automation companies.
Discuss dashboards and kpis for your business.
Tell us which workflow needs attention and which systems your team uses. The next step is a requirements discussion and a written scope.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements