Business solutions for Industrial automation companies

Explore software for work such as “PLC and control system retrofits”. Review each business function below, including when it fits and what to check before implementation.

Industrial automation companies

How the business operates.

Automation projects rarely end when the panel ships. Commissioning, punch points, operator training and retention held until final acceptance all follow, with no purchase order of their own.

Offer and BOM builder

Prepare priced offers with a BOM drawn from your component list and current distributor prices.

Project material control

Reserve parts against each project, with purchase and lead-time tracking for long-delivery items, so a borrowed drive is seen in the office.

FAT and commissioning checklist

Tick off test points with the customer present, keep a punch list of what is still open, and record sign-off with a date.

Milestone billing and retention

Raise invoices by milestone, and track retention amounts and release dates, so a held amount is never forgotten.

Service desk and program archive

Log breakdown calls against the installation, with the latest program version stored for each machine.

Drawing and revision register

Hold general arrangement drawings, wiring schematics and the I/O list by revision, so the panel on site matches the drawing in the office.

Variation orders after the purchase order

Log each change a customer asks for once the order is placed, with revised I/O count, price and approval. The workshop rewires only against a signed variation. Handover disputes become a lookup.

Commissioning trips and site days

Log each trip with the engineer, days at the plant, travel cost and work done. The office sees which days fall under the contract. The rest become a separate charge.

Warranty and maintenance contracts

Record the warranty end date and any maintenance contract against each installed machine. A breakdown call arrives. The desk sees at once whether the visit is covered or billable.

Operator training sessions

Record who was trained on which machine, on what date and by which engineer. The manual issued is noted. Training promised in the offer is shown as delivered when the customer asks.

The records that hold the operation together.

  • Customer specification, signal list and offer revision
  • Project bill of materials and component allocation
  • Drawing and control-program version
  • Factory acceptance, commissioning and site acceptance record
  • Variation, milestone invoice, retention and service reference

Operational bottlenecks to check

Parts move between projects

A drive is pulled for an urgent job, and the first project stops at FAT in front of the customer. The customer flew in for nothing.

Retention is not followed up

Final acceptance happens, and the held amount sits unclaimed because no date was set against it. A year later, asking for it is awkward.

Program backups live on laptops

The plant reports a midnight fault, and the latest PLC program is on the laptop of an engineer who left. The fix starts from scratch.

Service calls go unbilled

Engineers fix breakdowns as goodwill, and the visit never becomes an invoice. Nobody can say what service cost.

Follow the work across teams.

This is a planning flow. Confirm the steps, owners and approval rules against your actual operation.

  1. 1. Define and price the requirement

    Record the agreed signals, equipment and scope assumptions with the technical offer and its revision.

  2. 2. Release project materials and design

    Link the customer order to the released drawings and bill of materials. Keep approved variations distinct from the original scope.

  3. 3. Build and record factory acceptance

    Record the workshop stages and evidence from the agreed factory acceptance process, including open observations.

  4. 4. Commission and hand over

    Track site work, approved changes and site acceptance evidence. Retain the handed-over program and drawing versions.

  5. 5. Reconcile and support the project

    Follow milestone acceptance, billing and retention. Link warranty or service requests to the delivered configuration rather than an engineer’s private files.

Roles and responsibility boundaries.

Application and project engineer

Controls the specification, signal list, technical offer and approved revisions for the customer project.

Panel, purchase and commissioning teams

Procures project material, records workshop work and manages the agreed factory and site acceptance activities.

Project accounts and service desk

Follows milestone billing, retention and variations, and links later service calls to the delivered project and program archive.

Reports your managers need.

  • Project material shortages and design revisions
  • Factory and site acceptance observations still open
  • Commissioning effort and approved variations
  • Milestone billing, retention and service follow-up

Connections to scope

  • Document and program archive: released and handed-over versions
  • Accounting: project purchases, milestones and retention
  • Monitoring systems: explicitly scoped operational readings after handover

Confirm data access, record ownership and the exchange method for each connection. Inclusion here does not mean every connection is available in a standard package.

Setup decisions and adoption risks.

Use these requirements to plan phases, data migration and user training. Agree the release sequence after reviewing your current systems.

Define project and version control

Agree the identifiers connecting offers, drawings, signal lists, programs and the final delivery.

Trial an acceptance and variation

Track a sample observation and scope change through technical approval, site evidence and billing treatment.

Train handover and service ownership

Agree who can release a program version, close an observation and authorise changes to the supported configuration.

Limitations to settle before implementation

  • An IoT dashboard covers monitored readings; project control, commercial milestones and engineering records need separate implementation scope.
  • Engineering and plant specialists control machine safety, live commissioning and acceptance; a project record does not authorise unsafe operation.

Modules to consider first.

These functions connect to the operating model above. Confirm each one against the work your business actually runs.

Choose the operation you want to improve.

Use these activities to explain your scope. Your business does not need every function in the directory.

  • PLC and control system retrofits
  • SCADA and remote monitoring for utilities and water plants
  • Packaging and end-of-line automation
  • Robotic welding, palletising and material handling
  • Energy monitoring and power quality systems
  • Production data, OEE and traceability systems
  • Panel building for OEMs
  • Annual maintenance and breakdown support contracts
  • Automation for pharma and food lines with validation needs
Talk to us

Start with the problem your team can describe.

Bring a sample record and show where information is copied, missed or waiting for approval. Scope the first useful change from there.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.