Business solutions for Industrial automation companies
Explore software for work such as “PLC and control system retrofits”. Review each business function below, including when it fits and what to check before implementation.
How the business operates.
Automation projects rarely end when the panel ships. Commissioning, punch points, operator training and retention held until final acceptance all follow, with no purchase order of their own.
The records that hold the operation together.
- Customer specification, signal list and offer revision
- Project bill of materials and component allocation
- Drawing and control-program version
- Factory acceptance, commissioning and site acceptance record
- Variation, milestone invoice, retention and service reference
Operational bottlenecks to check
Parts move between projects
A drive is pulled for an urgent job, and the first project stops at FAT in front of the customer. The customer flew in for nothing.
Retention is not followed up
Final acceptance happens, and the held amount sits unclaimed because no date was set against it. A year later, asking for it is awkward.
Program backups live on laptops
The plant reports a midnight fault, and the latest PLC program is on the laptop of an engineer who left. The fix starts from scratch.
Service calls go unbilled
Engineers fix breakdowns as goodwill, and the visit never becomes an invoice. Nobody can say what service cost.
Follow the work across teams.
This is a planning flow. Confirm the steps, owners and approval rules against your actual operation.
Roles and responsibility boundaries.
Reports your managers need.
- Project material shortages and design revisions
- Factory and site acceptance observations still open
- Commissioning effort and approved variations
- Milestone billing, retention and service follow-up
Connections to scope
- Document and program archive: released and handed-over versions
- Accounting: project purchases, milestones and retention
- Monitoring systems: explicitly scoped operational readings after handover
Confirm data access, record ownership and the exchange method for each connection. Inclusion here does not mean every connection is available in a standard package.
Setup decisions and adoption risks.
Use these requirements to plan phases, data migration and user training. Agree the release sequence after reviewing your current systems.
Limitations to settle before implementation
- An IoT dashboard covers monitored readings; project control, commercial milestones and engineering records need separate implementation scope.
- Engineering and plant specialists control machine safety, live commissioning and acceptance; a project record does not authorise unsafe operation.
Modules to consider first.
These functions connect to the operating model above. Confirm each one against the work your business actually runs.
Choose the operation you want to improve.
Use these activities to explain your scope. Your business does not need every function in the directory.
- PLC and control system retrofits
- SCADA and remote monitoring for utilities and water plants
- Packaging and end-of-line automation
- Robotic welding, palletising and material handling
- Energy monitoring and power quality systems
- Production data, OEE and traceability systems
- Panel building for OEMs
- Annual maintenance and breakdown support contracts
- Automation for pharma and food lines with validation needs
Explore the business functions.
Production, stock, fleet and recurring billing functions apply only where your business runs those activities. Read the suitability conditions on each page.
Analytics
Platform
Roles and Permissions
Control which records and actions each user can access.
View workflow and suitability →WhatsApp, SMS and Email Notifications
Send business messages from approved events and recipient rules.
View workflow and suitability →Workflow and Approvals
Route business requests through defined approval steps.
View workflow and suitability →
Field Service
Start with the problem your team can describe.
Bring a sample record and show where information is copied, missed or waiting for approval. Scope the first useful change from there.
What happens after you share your requirements
- We review your brief and the systems you already use.
- We clarify the workflow, missing information and the work to consider first.
- The proposed scope sets out the deliverables, responsibilities and dependencies.
- Review the scope and commercial terms before deciding whether to proceed.
Start with your requirements
Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.
Share your requirements