Skip to main content
GullySystem
Manufacturing

Business solutions for Metal stamping companies

Explore software for work such as “Brackets, clips and covers for auto plants”. Review each business function below, including when it fits and what to check before implementation.

Metal stamping companies

How the business operates.

A press stamps thousands of parts an hour using a die built for one part. A chipped punch leaves burrs on the bracket. A worn die button does the same. A coil from the wrong heat splits the flange of a deep drawn cup.

Quotation by strip pitch and tonnage

Price a part from strip width, pitch, material weight, press tonnage and strokes per minute, with tooling cost shown separately or amortised.

Die register and stroke counter

Hold each die with its rack location, press and bolster fit, strokes since sharpening and repair history, so wear is read from counts.

Coil receipt and lot trace

Book coils in with grade, gauge, width, weight and heat number, then link each to the runs and bins that consumed it.

Press schedule and changeover

Plan runs by tonnage and bed size, and sequence them to cut die changes against customer call-offs.

In-process and first-off checks

Enter burr height, hole position and flatness readings at the set interval, with the setter’s approval of the first-off part.

Tooling cost recovery

Track die cost against parts shipped, so amortisation or customer-paid tooling is closed out on a known date.

Scrap and call-off dispatch

Weigh skeleton against coil issued, and ship parts against the customer’s call-off with a delivery note.

Press maintenance and breakdowns

Records lubrication, clutch and brake checks and breakdowns for each mechanical and hydraulic press, with downtime and cause. The maintenance head sees the next due press. Repeat faults stand out.

Setter and operator skill matrix

Lists which setters and operators are cleared for which presses and dies, with the sign-off date. Dies go only to cleared setters. The shift supervisor reads it at allocation.

Drawing revisions and approvals

Holds each part drawing revision, the customer’s approval and the die changes it needs. The tool room sees which revision a die was last built to. Superseded drawings are locked.

The records that hold the operation together.

  • Enquiries and drawing revisions. Log each enquiry with drawing, material grade and annual volume. Keep drawing revisions with the part, and link each die to the revision it was cut for.
  • Quotation by strip pitch and tonnage. Price from strip width, pitch, material weight and tonnage. A die funded by the customer is quoted as its own line, while one funded by you is spread across each blank sold.
  • Blanket orders and call-offs. Hold the standing order with its total. Release each call-off against it, and read the open balance without adding up delivery notes by hand.
  • Coil receipt and lot trace. Book coils in with grade, thickness, width, weight and heat number. Each coil links to the runs and bins that consumed it, so a cracked heat is chased to the exact bins.
  • Die register and stroke counter. Hold every die with its bay, compatible presses, strokes since regrind and repair history, including punch, die button and spring changes. Dies close to the limit your toolroom set are flagged to the planner before the next run.
  • Press schedule and changeover. Plan runs by press tonnage and bed size. Sequence them by die to cut changeovers, and keep every customer call-off covered while the bolster plates are swapped.
  • First-off and in-process checks. The setter signs off the first piece. Later burr, hole and flatness readings sit under that same run, so an auditor reads one record instead of three clipboards.
  • Tooling cost recovery. Track the die’s cost against parts shipped. A customer-paid or amortised tool is closed out on a date read from the shipments, with the surcharge per part shown on each invoice.

Operational bottlenecks to check

Die life is judged by sound and burr height

A punch is sharpened when the operator decides the burrs look bad. Nobody knows the stroke count. Wear is found late, mid run.

Coil lots are not tied to finished parts

A split appears in one bin of brackets and the mill names the coil, yet no record shows which other bins were blanked from it. The customer’s recall sweeps in far more parts than needed.

Call-offs and press time do not line up

The customer changes the weekly quantity by phone. The press already carries another die. The planner hears last.

Tooling cost recovery is untracked

A die was paid for in instalments added to every part shipped. Nobody checks whether recovery is complete, so the customer overpays or the shop absorbs the balance.

Scrap skeleton is sold by weight with no reconciliation

Strip offcuts leave the yard by weighbridge ticket. The weight is never compared to coil issued and parts shipped, so loss from pilot holes and carrier web goes unseen.

Follow the work across teams.

This is a planning flow. Confirm the steps, owners and approval rules against your actual operation.

  1. 1. Enquiry and tooling decision

    A drawing and annual volume arrive. The estimator notes strip pitch, material grade and press tonnage, then records whether the customer pays for the progressive die or the shop recovers it through the part price.

  2. 2. Quotation and blanket order

    Material weight, press rate, scrap allowance and tooling terms make up the price. An accepted quote becomes a blanket order with a standing quantity, and call-offs release against it until the total is used.

  3. 3. Coil receipt

    The mill certificate travels with the coil. Its grade, thickness, width, weight and heat number are booked in before the coil goes to a numbered rack bay, so the stores crew can find it again.

  4. 4. Setup and first-off

    The planner sequences runs by die and press. The setter mounts the die, adjusts the stripper and feed pitch, threads the coil through the straightener, and gets first-off approved by the inspector.

  5. 5. Production and checks

    Strokes, good parts and scrap are logged per run. Burr height, hole position and flatness are measured at the interval the control plan fixes for that part, and the readings stay on the run.

  6. 6. Outside steps and dispatch

    Parts needing zinc plating or case hardening are booked out to the vendor on a delivery note. Finished bins are counted into the call-off at dispatch, and the invoice follows.

Roles and responsibility boundaries.

For owners

See press hours, dies near regrind, tooling recovery outstanding, scrap sold and what each customer owes. All of it sits on one screen.

For planners

Sequence runs by die. Check coil on hand against call-offs. Move a run when a customer changes a quantity, and see which press frees up for the swap.

For die setters and press operators

Open the run, confirm the die and coil lot, then log first-off, strokes and scrap. The next setup is lined up on the same screen, with its die bay and feed pitch.

For tool-room and maintenance staff

Read stroke counts, schedule regrinds, and record repairs, shims and spring changes against the die. The history stays with the die for its whole life.

For stores, inspection and dispatch

Receive coil against the mill certificate, sign inspection checks, and ship parts against the call-off with a delivery note.

Reports your managers need.

  • Press hours and good parts per hour, by press and die
  • Strokes since regrind, by die
  • Coil lots consumed and the runs they fed
  • Call-offs due, shipped and still open per customer
  • Tooling cost recovered against parts shipped
  • Skeleton and reject weight against coil issued
  • Outside process lots with vendor and days away

Connections to scope

  • Email
  • SMS
  • WhatsApp or other messaging
  • Barcode scanner
  • Accounting export
  • Spreadsheet import

Confirm data access, record ownership and the exchange method for each connection. Inclusion here does not mean every connection is available in a standard package.

Setup decisions and adoption risks.

Use these requirements to plan phases, data migration and user training. Agree the release sequence after reviewing your current systems.

Presses and dies

Each press’s tonnage, bed size and stroke rate, and every die with its part number and strokes to date, are entered first, so the planner sees real capacity.

Coil master

Your grades, thicknesses, widths and coil suppliers are loaded, along with the mill certificate fields you keep. Heat number has its own field.

Regrind limits

Stroke limits per die, set by your toolroom, drive the flags the planner sees. A progressive die and a simple blanking die can carry different limits.

Customer terms

Call-off rules, tooling recovery terms and packing instructions are set per customer, including the parts quantity for each returnable bin.

Outside vendors

Platers and heat treaters are entered with the processes they perform. Each shows its open lots.

Hosted by GullySystem

Press operators, toolroom staff and the billing clerk open one shared record on our servers. Export customers are invoiced in their own currency.

Limitations to settle before implementation

  • A shop with a single small press and no dies of its own can manage with a job book.
  • Sheet metal fabricators, laser cutting and CNC bending shops form flat parts differently and have their own products.

Modules to consider first.

These functions connect to the operating model above. Confirm each one against the work your business actually runs.

Choose the operation you want to improve.

Use these activities to explain your scope. Your business does not need every function in the directory.

  • Brackets, clips and covers for auto plants
  • Progressive die parts in high volume
  • Deep drawn components
  • Electrical terminals and laminations
  • Appliance sheet metal parts
  • Press parts with welding and plating added
  • Second-vendor approval with auto buyers
  • Die maintenance and repair as a service
  • Export stamped components
Talk to us

Start with the problem your team can describe.

Bring a sample record and show where information is copied, missed or waiting for approval. Scope the first useful change from there.

What happens after you share your requirements

  1. We review your brief and the systems you already use.
  2. We clarify the workflow, missing information and the work to consider first.
  3. The proposed scope sets out the deliverables, responsibilities and dependencies.
  4. Review the scope and commercial terms before deciding whether to proceed.

Start with your requirements

Describe your current process, the people involved and the change you need. Start with the details you know; we can clarify the rest together.

Share your requirements